Robotics / Digital twin / Check against prediction

Digital twin · prediction check

Hot soak against Reach and hold

Observed run

Prediction

invalidsim

Both runs are simulations: the observed run stands in for a real joint until a device posts one with source device:<id>.

The observed run carries 0.3 kg on tool; the prediction carries nothing held.

The observed run was at 60 C ambient and the prediction at 25 C.

The runs last 120 s and 20 s; each joint is compared over the time both cover.

The observed scenario is "min-jerk reach and hold, payload at the tool, 60 C enclosure" and the prediction's is "min-jerk reach and hold".

Observed
Printed arm, stand test watch
Prediction
Printed arm, stand test ok
Rules
command within 0.01 rad rms; position watch 0.02 rad rms, fault 0.1 rad max; current watch 25%; winding watch 5 °C, fault 15 °C

Joints

JointStatusCommand apartPosition off (rms)Position off (max)Current offWinding ΔHealth
base simnot comparable0.1474 rad0.1474 rad0.7839 rad141% (0.263 A)+35.1 °C—
shoulder simnot comparable0.1566 rad0.1565 rad0.8335 rad104% (0.924 A)+41.3 °C—
elbow simnot comparable0.3131 rad0.3134 rad1.6688 rad210% (0.580 A)+44.5 °C—
wrist simnot comparable0.1566 rad0.1567 rad0.8346 rad266% (0.216 A)+36.4 °C—

base not_comparable

commanded positions are 0.147 rad rms apart, so the runs did not take the same command

shoulder not_comparable

commanded positions are 0.157 rad rms apart, so the runs did not take the same command

elbow not_comparable

commanded positions are 0.313 rad rms apart, so the runs did not take the same command

wrist not_comparable

commanded positions are 0.157 rad rms apart, so the runs did not take the same command