1 viewer
From the ground to the rocket plant
Moon mine
Ore, machine and launcher figures are assumed for sizing, drawn from published study ranges; none is measured. Planned lead is a formula for one job at a time on random arrivals: a mine lot that lands as a lump takes longer, and rockets on an even beat take less.
- Route
- Ilmenite reduction
- Flights to build
- 10
- Landed
- 37.7 t
- Rocket plant
- $328.9 M
| Route | Flights to build | Flights over its life | Landed | Average draw | Resupply a year |
|---|---|---|---|---|---|
| Ilmenite reduction (chosen) | 10 | 14 | 37.7 t | 303 kW | 3.0 t |
| Molten regolith electrolysis | 13 | 15 | 51.9 t | 805 kW | 1.5 t |
| Machine | Units | Busy | Wait | Steps |
|---|---|---|---|---|
| light rover | 55 | 79% | 6 s | dig, haul |
| small electrolyser | 5 | 68% | 55 s | electrolyse |
| small liquefier | 5 | 75% | 105 s | liquefy |
| small reactor | 6 | 67% | 706 s | reduce |
| small screen | 5 | 74% | 0 s | size |
| small separator (bottleneck) | 13 | 79% | 1 s | separate |
| Item | Pieces | Mass | Sized from |
|---|---|---|---|
| oxygen tank | 5 | 3.0 t | 43.2 t of oxygen held, 1.5 landers' load |
| cryocooler | 5 | 0.3 t | 103 W of heat leak at 90 K |
| regenerative fuel cell | 5 | 2.5 t | 901 kWh through a night at 2540 W |
| solar array | 16 | 4.0 t | 387 kW at peak |
| power cable | 7 | 2.1 t | 500 m each way at 1000 V |
| radiator | 5 | 1.0 t | 153 kW shed at 340 K |
| comms mast | 2 | 0.4 t | Earth link, with a spare |
| offload crane | 2 | 1.2 t | lifts each landed piece down, with a spare |
| pad sinterer | 2 | 1.0 t | 2 pads, 127 t of regolith in 120 days |
| Piece | Count |
|---|---|
| small reactor | 7 |
| offload crane | 2 |
| oxygen tank | 5 |
| pad sinterer | 2 |
| regenerative fuel cell | 5 |
| small electrolyser | 6 |
| power cable | 7 |
| small separator | 15 |
| small liquefier | 6 |
| solar array | 16 |
| comms mast | 2 |
| radiator | 5 |
| small screen | 6 |
| light rover | 64 |
| cryocooler | 5 |
| Machine | Units | Busy | Wait | Steps |
|---|---|---|---|---|
| engine bay | 3 | 68% | 7 h | build-booster, build-vacuum |
| fibre cell | 2 | 56% | 0 h | fairing, frame-1, frame-2, frame-3 |
| integration hall | 1 | 17% | 16 h | integrate |
| launch pad | 1 | 10% | 5 h | fuel |
| panel mill | 2 | 41% | 0 h | mill-1, mill-2, mill-3 |
| proof bay | 1 | 3% | 0 h | proof-1, proof-2, proof-3 |
| quad laser printer | 8 | 73% | 6 h | print-booster, print-vacuum |
| spin former | 1 | 34% | 0 h | spin-1, spin-2, spin-3 |
| stage bay | 2 | 52% | 63 h | assemble-1, assemble-2, assemble-3 |
| stage stand | 1 | 21% | 8 h | fire-stage-1, fire-stage-2, fire-stage-3 |
| stir welder | 1 | 68% | 0 h | weld-1, weld-2, weld-3 |
| test stand | 1 | 60% | 6 h | fire-booster, fire-vacuum |
| turn mill (bottleneck) | 4 | 77% | 12 h | cut-pump-booster, cut-pump-vacuum |
| Material | Over the campaign |
|---|---|
| Liquid oxygen at the pad | 2.920e7 kg |
| Copper ore | 1.810e7 kg |
| Rocket kerosene | 1.140e7 kg |
| Aluminium-lithium plate | 1.950e6 kg |
| Carbon prepreg | 6.290e5 kg |
| Inconel powder and billet | 2.040e5 kg |
| Iron ore | 3.820e4 kg |
| Coal | 1.400e4 kg |
| Steel scrap | 7.030e3 kg |
| Limestone | 5.970e3 kg |
| Zinc plating | 2.430e2 kg |
| Flight computer and harness | 3.060e1 piece |
What the chain came to
At 10% ilmenite, 100 t of oxygen a year goes by ilmenite reduction. A lander sets down 4114 kg, so the 37.7 t of machines and site takes 10 flights, and those 10 rockets in 2 years are a $328.9 M plant. Keeping it running lands 3.0 t a year, which is 1 more flights a year. It makes its own landed weight in oxygen in 0.4 years, and oxygen is not equipment.
What a lander sets down
This stack was flown once, pad to surface, and spent 14738 m/s to set down 4114 kg. The flight left from the best latitude for the Moon's plane, with no navigation error, no boil-off and nothing held in reserve, so a real one lands less.
Not sized yet, so the cargo is a floor
who assembles and connects what lands; only the crane is carried · moving oxygen off the surface; the mine fills tanks and nothing fuels a lander yet · prospecting the site before the first flight · shielding the site from landing ejecta beyond the pads themselves