1 viewer
Fission · a design
Fission plant
A planning estimate from monthly means and the spread of days inside a month.
- Rated
- 2,200 MW
- A year
- 18,442 GWh
- Capacity factor
- 95.7%
The site
The plant
- Reactors
- 2 x 3,400 MW of heat, Pressurized water reactor
- Steam
- 284 C at 6.9 MPa
- Net in the warmest month
- 2,200 MW
- Net in the coldest month
- 2,355 MW
- Heat to the grid
- 33.7%
- At power
- 91.7% of the year
- Each core
- 3.51 m across and tall
- Heavy metal in the cores
- 179 t
- Replaced each refuelling
- 38.2%
- Fuel loaded a year
- 45.5 t at 4.5% U-235
- Fissioned a year
- 2,391 kg
- Natural uranium a year
- 420 t
- Separative work a year
- 313 thousand SWU
- Heat thrown away
- 4,496 MW at full power in summer
- Cooling water
- 1.47 m3/s evaporated from the towers, 127 thousand m3 a day
- Decay heat, one unit
- 34.9 MW after an hour, 15.5 MW after a day, 4.8 MW after thirty days
Through the year
| Month | Air C | Condenser C | Heat to the generator | Net at full power | Energy |
|---|---|---|---|---|---|
| Jan | -2.0 | 25 | 36.3% | 2,355 MW | 1,607 GWh |
| Feb | 0.0 | 25 | 36.3% | 2,355 MW | 1,452 GWh |
| Mar | 6.0 | 25 | 36.3% | 2,355 MW | 1,607 GWh |
| Apr | 12.0 | 29 | 35.7% | 2,319 MW | 1,532 GWh |
| May | 18.0 | 35 | 34.9% | 2,264 MW | 1,545 GWh |
| Jun | 23.0 | 40 | 34.2% | 2,219 MW | 1,465 GWh |
| Jul | 25.0 | 42 | 33.9% | 2,200 MW | 1,502 GWh |
| Aug | 24.0 | 41 | 34.0% | 2,210 MW | 1,508 GWh |
| Sep | 20.0 | 37 | 34.6% | 2,246 MW | 1,483 GWh |
| Oct | 13.0 | 30 | 35.6% | 2,310 MW | 1,576 GWh |
| Nov | 6.0 | 25 | 36.3% | 2,355 MW | 1,556 GWh |
| Dec | 0.0 | 25 | 36.3% | 2,355 MW | 1,607 GWh |
In 3D
To scale: 3.5 m cores. The containments, twelve cores across, the turbine halls and towers sized by the heat they shed are drawn by rule, not sized. Lift layers raises the containments off the cores. 3D starts when Virtual's renderer loads.
What the model leaves out
- There is no neutronics. Criticality, control, the flux shape and every safety system are outside the model, and nothing here says a reactor of these figures could be licensed.
- The steam cycle is one share of the Carnot limit, the same for every plant. Reheat, feedwater heating and the turbine's own design are not worked through.
- The heat sink is the month's air temperature plus a fixed margin. A deep lake or a cold sea runs cooler than the air in summer.
- Refuelling is spread evenly over the year. A real unit is down for about a month every eighteen or twenty-four, and a year of trouble is not in the model.
- Units of unlike size are sized alike, at their mean.
- Spent fuel is counted in tonnes discharged. Its storage and disposal are not modelled.