Power plantsThe same code runs real plants from public records, and the gap to what they reported is the only claim this page makes about a new design.

A plant is sized from its site by a model with no IO and no clock, then drawn at its own dimensions.

Figures are planning estimates from monthly means and the spread of days inside a month. They are not measurements, interconnection studies or engineering advice, and nothing here is sent to any plant or grid.
Power and water map
Real plants runNo constant in the model was fitted to these plants.
64
Being built, forecastNone has reported a year, so nothing here is a test.
22
Planned generators
2,358

Size a plant

KindFrom the site
HydroHead, river flow by month and its spread over the days, and a unit count become a penstock, a runner and its speed, a cavitation setting and a year of energy.
SolarLatitude, monthly irradiance and temperature become a year of output on a fixed tilt or a tracker, through each month's dull and clear days, with clipping and land.
WindTurbine dimensions and monthly wind become a year of output through shear, air density and a Weibull spread.
FissionA light-water reactor's licensed heat becomes a steam cycle that follows the month's heat sink, a refuelling cycle, the fuel and enrichment it consumes and the heat it throws away.
FusionA tokamak's size, field and current become a fusion power, the heating that holds it and the electricity left over. No fusion plant has run, so this one is untested.
5 rows

Real plants through the same model64 plants, each sized from what its owner and the federal registers publish, run on the public river or climate record, and set against the net generation it reported on form EIA-923. No constant in the model was fitted to these plants. Records read 2026-11-10.

By kind
KindPlantsLeanThe mean of the signed gaps: which way the model leans for the kind.Mean gapThe mean of the gaps without their sign.WorstInside the reported yearsPlants whose model year falls between their own worst and best reported years.
Hydro6+17.4%17.4%+35.3%2 of 6
Solar3+0.8%1.3%+1.8%3 of 3
Wind7+12.9%20.8%+39.1%2 of 7
Fission48+4.3%5.0%+28.0%36 of 48
4 rows

Worst to best reported yearReported meanModel

Hydro
PlantStateRegisteredReported a yearMean net generation over the reported years, from form EIA-923.YearsModelGapThe model's year against the reported mean: positive is over, negative under.From zeroThe worst to best reported year as a band, the reported mean as a line and the model as a dot, on one scale from zero.What the record leaves out
Grand Coulee DamWashington7,079 MW18,737 GWh2015 to 202421,649 GWh+15.5%The registered capacity includes the pump-generators that lift water to Banks Lake; their pumping is not modelled.
Hoover DamNevada2,079 MW3,326 GWh2015 to 20244,500 GWh+35.3%The record gives the rated head. Reclamation's own power FAQ puts the average at 510 to 530 ft, and Lake Mead stood low through these years, so the model runs on more head than the plant had.
Glen Canyon DamArizona1,312 MW3,493 GWh2015 to 20243,891 GWh+11.4%The gauge is at Lees Ferry, 25 km below the dam. Lake Powell stood low through these years, so the model runs on more head than the plant had.
Conowingo DamMaryland497 MW1,904 GWh2015 to 20241,990 GWh+4.5%The plant mixes seven Francis and four Kaplan units; the model sizes eleven alike and lets the head choose the runner. The Susquehanna floods and falls inside a month, which monthly means smooth away.
Priest Rapids DamWashington950 MW4,440 GWh2015 to 20245,359 GWh+20.7%Water spilled for fish passage each spring and summer is not in the record, so the model sends it through the turbines.
Wanapum DamWashington1,220 MW4,878 GWh2015 to 20245,699 GWh+16.8%The gauge is below Priest Rapids Dam, 29 km downstream. Water spilled for fish passage is not in the record, so the model sends it through the turbines.
6 rows
Solar
PlantStateRegisteredReported a yearMean net generation over the reported years, from form EIA-923.YearsModelGapThe model's year against the reported mean: positive is over, negative under.From zeroThe worst to best reported year as a band, the reported mean as a line and the model as a dot, on one scale from zero.What the record leaves out
Desert Sunlight Solar FarmCalifornia563 MW1,269 GWh2015 to 20241,291 GWh+1.8%No record read gives the tilt or the module rating: the model takes its default tilt of 30 degrees and a module-to-inverter ratio of 1.3.
Solar StarCalifornia585 MW1,610 GWh2015 to 20241,599 GWh-0.7%The model's trackers do not backtrack and its rows do not shade each other.
Agua Caliente Solar ProjectArizona348 MW715.7 GWh2015 to 2024725.5 GWh+1.4%No record read gives the tilt: the model takes its default of 30 degrees.
3 rows
Wind
PlantStateRegisteredReported a yearMean net generation over the reported years, from form EIA-923.YearsModelGapThe model's year against the reported mean: positive is over, negative under.From zeroThe worst to best reported year as a band, the reported mean as a line and the model as a dot, on one scale from zero.What the record leaves out
Block Island Wind FarmRhode Island29.3 MW104.5 GWh2017 to 2024115.9 GWh+10.9%Offshore, five turbines. 2016 is left out: the farm started that December.
Horse Hollow Wind Energy CenterTexas736 MW2,294 GWh2015 to 20242,320 GWh+1.1%The turbine record shows the fleet after its 2017 repowering; generation before that came from the original machines.
Roscoe Wind FarmTexas209 MW491.1 GWh2015 to 2024572.0 GWh+16.5%One of the Roscoe complex's four registered plants.
Fowler Ridge Wind FarmIndiana588 MW1,371 GWh2015 to 20241,712 GWh+24.9%Four turbine models in one registered plant.
Meadow Lake Wind FarmIndiana200 MW451.8 GWh2015 to 2024566.9 GWh+25.5%The first of six registered Meadow Lake plants.
Los Vientos Wind 1ATexas200 MW507.8 GWh2015 to 2024706.5 GWh+39.1%On the Gulf coastal plain, where a sea breeze the climate grid averages with the land behind it.
Alta Wind Energy Center ICalifornia150 MW385.1 GWh2015 to 2024279.0 GWh-27.6%In Tehachapi Pass. The climate grid is fifty kilometres across and does not see a pass, so the wind it gives is the surrounding desert's.
7 rows
Fission
PlantStateRegisteredReported a yearMean net generation over the reported years, from form EIA-923.YearsModelGapThe model's year against the reported mean: positive is over, negative under.From zeroThe worst to best reported year as a band, the reported mean as a line and the model as a dot, on one scale from zero.What the record leaves out
Arkansas Nuclear OneArkansas1,821 MW13,892 GWh2015 to 202415,072 GWh+8.5%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Beaver Valley Power StationPennsylvania1,808 MW14,918 GWh2015 to 202415,794 GWh+5.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Braidwood StationIllinois2,332 MW19,868 GWh2015 to 202419,830 GWh-0.2%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Browns Ferry Nuclear PlantAlabama3,662 MW28,603 GWh2015 to 202432,031 GWh+12.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Brunswick Steam Electric PlantNorth Carolina1,870 MW15,254 GWh2015 to 202415,674 GWh+2.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Byron StationIllinois2,300 MW19,694 GWh2015 to 202419,875 GWh+0.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Callaway PlantMissouri1,190 MW8,863 GWh2015 to 20249,659 GWh+9.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Calvert Cliffs Nuclear Power PlantMaryland1,745 MW14,910 GWh2015 to 202414,792 GWh-0.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Catawba Nuclear StationSouth Carolina2,310 MW19,055 GWh2015 to 202418,507 GWh-2.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Clinton Power StationIllinois1,079 MW8,735 GWh2015 to 20249,470 GWh+8.4%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Columbia Generating StationWashington1,151 MW9,068 GWh2015 to 20249,672 GWh+6.7%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Comanche Peak Nuclear Power PlantTexas2,400 MW19,424 GWh2015 to 202419,256 GWh-0.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Cooper Nuclear StationNebraska768 MW6,393 GWh2015 to 20246,589 GWh+3.1%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Donald C. Cook Nuclear PlantMichigan2,177 MW17,191 GWh2015 to 202418,496 GWh+7.6%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Davis-Besse Nuclear Power StationOhio894 MW7,423 GWh2015 to 20247,672 GWh+3.4%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Diablo Canyon Power PlantCalifornia2,240 MW17,612 GWh2015 to 202418,460 GWh+4.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Dresden Nuclear Power StationIllinois1,797 MW15,306 GWh2015 to 202416,171 GWh+5.7%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Joseph M. Farley Nuclear PlantAlabama1,791 MW14,356 GWh2015 to 202415,011 GWh+4.6%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
James A. FitzPatrick Nuclear Power PlantNew York853 MW6,809 GWh2015 to 20246,963 GWh+2.3%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
R. E. Ginna Nuclear Power PlantNew York582 MW4,780 GWh2015 to 20244,856 GWh+1.6%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Grand Gulf Nuclear StationMississippi1,390 MW9,217 GWh2015 to 202411,802 GWh+28.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Edwin I. Hatch Nuclear PlantGeorgia1,759 MW14,310 GWh2015 to 202415,002 GWh+4.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Hope Creek Generating StationNew Jersey1,172 MW9,569 GWh2015 to 202410,622 GWh+11.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
LaSalle County StationIllinois2,264 MW19,189 GWh2015 to 202419,368 GWh+0.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Limerick Generating StationPennsylvania2,242 MW19,184 GWh2015 to 202419,172 GWh-0.1%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
McGuire Nuclear StationNorth Carolina2,316 MW19,393 GWh2015 to 202418,708 GWh-3.5%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Millstone Power StationConnecticut2,104 MW16,404 GWh2015 to 202417,483 GWh+6.6%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Monticello Nuclear Generating PlantMinnesota617 MW5,245 GWh2015 to 20245,504 GWh+4.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Nine Mile Point Nuclear StationNew York1,896 MW15,669 GWh2015 to 202416,029 GWh+2.3%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
North Anna Power StationVirginia1,893 MW15,618 GWh2015 to 202415,895 GWh+1.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Oconee Nuclear StationSouth Carolina2,554 MW21,691 GWh2015 to 202420,894 GWh-3.7%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Palo Verde Nuclear Generating StationArizona3,937 MW31,930 GWh2015 to 202431,455 GWh-1.5%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Peach Bottom Atomic Power StationPennsylvania2,549 MW21,771 GWh2015 to 202421,915 GWh+0.7%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Perry Nuclear Power PlantOhio1,240 MW9,966 GWh2015 to 202410,294 GWh+3.3%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Prairie Island Nuclear Generating PlantMinnesota1,040 MW8,332 GWh2015 to 20249,172 GWh+10.1%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Quad Cities Nuclear Power StationIllinois1,819 MW15,488 GWh2015 to 202416,160 GWh+4.3%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
River Bend StationLouisiana976 MW7,104 GWh2015 to 20248,266 GWh+16.4%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
H. B. Robinson Steam Electric PlantSouth Carolina759 MW6,085 GWh2015 to 20246,271 GWh+3.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
St. Lucie PlantFlorida1,968 MW15,740 GWh2015 to 202415,716 GWh-0.2%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Seabrook StationNew Hampshire1,250 MW10,106 GWh2015 to 20249,989 GWh-1.2%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Sequoyah Nuclear PlantTennessee2,278 MW17,600 GWh2015 to 202418,612 GWh+5.8%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Shearon Harris Nuclear Power PlantNorth Carolina964 MW7,856 GWh2015 to 20247,934 GWh+1.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
South Texas ProjectTexas2,580 MW21,080 GWh2015 to 202420,332 GWh-3.6%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Virgil C. Summer Nuclear StationSouth Carolina977 MW7,611 GWh2015 to 20247,785 GWh+2.3%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Surry Power StationVirginia1,676 MW13,644 GWh2015 to 202413,949 GWh+2.2%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Susquehanna Steam Electric StationPennsylvania2,494 MW20,083 GWh2015 to 202421,662 GWh+7.9%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Waterford Steam Electric StationLouisiana1,076 MW8,518 GWh2015 to 20249,839 GWh+15.5%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
Wolf Creek Generating StationKansas1,177 MW9,359 GWh2015 to 20249,641 GWh+3.0%The record gives no cooling system and no fuel cycle: the model takes cooling towers, an 18-month cycle and a 35-day refuelling. The licensed power is today's, so a plant uprated during these years reads high.
48 rows

How to read the gaps

  • Hydro leans high. Each month's river is spread over its days as the gauge recorded them, so a flood spills: Conowingo, on a river that floods, reads +4.5%. The dams on regulated rivers still read high, because a real station also spills for fish by order, loses head when its reservoir is drawn down, and takes units out for work.
  • Wind is only as good as its wind. The climate record is a grid about fifty kilometres across: it averages a ridge or a pass with the country round it, and a coast with the land behind it.
  • Solar sits closest, because irradiance varies slowly over fifty kilometres of desert and a module's response to it is simple. All three plants are in the desert; a cloudier site is not tested.
  • Fission leans a few percent high. The model gives every plant the fleet's usual refuelling outage and little else, so a plant with a bad decade, like Grand Gulf, reads far high. The licensed heat is today's, so a plant uprated during these years reads high as well.
  • One reported year can sit a fifth above or below a plant's mean. A model inside that span has done as well as last year predicts this one.

Plants being builtThe Energy Information Administration's inventory of planned generators, by technology, with the part already under construction or built and waiting to start.

Inventory
EIA-860M inventory of planned generators, September 2026
Generators developers have said they will build
2,358
Read
2026-11-11
TechnologyGeneratorsPlannedUnder construction or built
Solar Photovoltaic1100122,025 MW46,750 MW
Batteries48364,235 MW23,298 MW
Natural Gas Fired Combined Cycle23647,146 MW7,548 MW
Natural Gas Fired Combustion Turbine19222,995 MW5,306 MW
Onshore Wind Turbine7318,454 MW9,354 MW
Offshore Wind Turbine45,089 MW5,089 MW
Nuclear54,968 MW0 MW
Hydroelectric Pumped Storage112,600 MW0 MW
11 other technologies2542,730 MW576 MW
All2,358290,242 MW97,922 MW
10 rows

The largest under constructionEach solar and wind plant is run through the same model on the inventory's capacity and position and the public climate there. None has reported a year, so nothing here is a test: each figure is written down before the answer exists, to be checked against form EIA-923 once the plant has a whole year. The inventory names no array layout and no turbine, so each plant's page lists what was assumed.

Solar
PlantWhere and ownerNameplatePlanned startStageModel, a whole yearCapacity factorRange the backtest allowsThe backtest's own largest misses for the kind. Solar's is narrow because the three built solar plants tested all sat within a few percent, all in the desert, so a plant in Missouri or New York is outside what was tested. Wind's is wide because wind's backtest is.From zeroThe range as a band and the model's year as a dot, on one scale from zero.First whole yearThe year whose reported generation will check this figure.
Libra SolarLyon, NV · Libra Solar LLC700 MWDec 2027Under construction, half built or less1,904 GWh31.1%1,872 GWh to 1,918 GWh2028
Swan SolarBates, MO · Swan Solar LLC650 MWSep 2028Under construction, half built or less1,327 GWh23.3%1,304 GWh to 1,337 GWh2029
Tehuacana Creek SolarNavarro, TX · Parliament Energy Holdings LLC645 MWMay 2027Under construction, more than half built1,388 GWh24.6%1,364 GWh to 1,398 GWh2028
Danish Fields Solar, LLCWharton, TX · Danish Fields Solar, LLC600 MWOct 2026Built, not yet in commercial operation1,255 GWh23.9%1,233 GWh to 1,264 GWh2027
Swenson SolarStonewall, TX · Swenson Solar LLC600 MWNov 2026Under construction, half built or less1,495 GWh28.4%1,469 GWh to 1,506 GWh2027
Clear Fork Creek Solar and BESS SLFWilson, TX · Clear Fork600 MWMar 2027Under construction, half built or less1,285 GWh24.5%1,263 GWh to 1,295 GWh2028
Hecate Energy Cider Solar LLCGenesee, NY · Greenbacker Renewable Energy Corporation557 MWDec 2026Under construction, half built or less940.4 GWh19.3%924.2 GWh to 947.3 GWh2027
Roseland Solar Project, LLCFalls, TX · Enel Green Power Roseland Solar, LLC500 MWOct 2026Built, not yet in commercial operation1,072 GWh24.5%1,054 GWh to 1,080 GWh2027
Bellefield 2 Solar & Energy Storage FarmKern, CA · 26SB 8me LLC500 MWDec 2026Under construction, more than half built1,372 GWh31.3%1,349 GWh to 1,382 GWh2027
Steel River Solar Phase 1Mississippi, AR · Cypress Creek Renewables500 MWAug 2028Under construction, half built or less1,031 GWh23.5%1,013 GWh to 1,038 GWh2029
10 rows
Wind on land
PlantWhere and ownerNameplatePlanned startStageModel, a whole yearCapacity factorRange the backtest allowsThe backtest's own largest misses for the kind. Solar's is narrow because the three built solar plants tested all sat within a few percent, all in the desert, so a plant in Missouri or New York is outside what was tested. Wind's is wide because wind's backtest is.From zeroThe range as a band and the model's year as a dot, on one scale from zero.First whole yearThe year whose reported generation will check this figure.
Chokecherry and Sierra Madre WindCarbon, WY · Power Company of Wyoming LLC3,550 MWDec 2033Under construction, half built or less12,368 GWh39.8%8,889 GWh to 17,074 GWh2034
Singing Grass WindKit Carson, CO · Public Service Co of Colorado603 MWSep 2027Under construction, half built or less1,918 GWh36.3%1,378 GWh to 2,647 GWh2028
Panther Grove 2Livingston, IL · Panther Grove 2 LLC472 MWDec 2027Under construction, half built or less1,693 GWh40.9%1,217 GWh to 2,338 GWh2028
Cheyenne Ridge IICheyenne, CO · Public Service Co of Colorado438 MWJul 2027Under construction, half built or less1,527 GWh39.8%1,098 GWh to 2,108 GWh2028
Panther Grove Wind, LLCWoodford, IL · Panther Grove Wind, LLC423 MWDec 2026Built, not yet in commercial operation1,509 GWh40.7%1,084 GWh to 2,083 GWh2027
Alle-Catt Wind Energy LLCAllegany, NY · Invenergy Services LLC340 MWDec 2026Under construction, more than half built721.5 GWh24.2%518.6 GWh to 996.0 GWh2027
Coles WindColes, IL · Coles Wind, LLC300 MWMay 2027Under construction, half built or less1,054 GWh40.1%757.3 GWh to 1,455 GWh2028
Firelands WindHuron, OH · Firelands Wind, LLC297 MWMay 2027Under construction, half built or less1,049 GWh40.3%754.0 GWh to 1,448 GWh2028
8 rows
Wind at sea
PlantWhere and ownerNameplatePlanned startStageModel, a whole yearCapacity factorRange the backtest allowsThe backtest's own largest misses for the kind. Solar's is narrow because the three built solar plants tested all sat within a few percent, all in the desert, so a plant in Missouri or New York is outside what was tested. Wind's is wide because wind's backtest is.From zeroThe range as a band and the model's year as a dot, on one scale from zero.First whole yearThe year whose reported generation will check this figure.
Coastal Virginia Offshore Wind (CVOW) Commercial Project, VA · Dominion Energy Inc.2,640 MWJan 2027Under construction, half built or less8,676 GWh37.5%6,236 GWh to 11,978 GWh2028
Sunrise WindSuffolk, NY · Orsted Wind Power North America LLC924 MWOct 2027Under construction, half built or less3,406 GWh42.1%2,448 GWh to 4,702 GWh2028
Empire Wind 1Kings, NY · Empire Offshore Wind LLC810 MWSep 2027Under construction, more than half built2,857 GWh40.3%2,053 GWh to 3,944 GWh2028
Revolution WindWashington, RI · Orsted Wind Power North America LLC715 MWNov 2026Under construction, more than half built2,641 GWh42.2%1,899 GWh to 3,646 GWh2027
4 rows

Fusion: set beside other calculationsNo fusion plant has made electricity, so there is nothing to test against. These are machines as their builders published them, run through the model at its own profile shapes, purity and confinement. Agreement here means two calculations agree.

Figures read
2026-11-10
MachineFigures areStated fusion powerModelStated gainModel gainFusion power lands within a fifth of each study. Gain does not: it is the small difference between alpha heating and losses, and each study assumes its own confinement.What the comparison leaves outSource
ITERa design target500 MWnot run10.0No page read gave the design density or temperature in units the model takes, so the model is not run.ITER Organization
JET, 1997 record pulsemeasured16.0 MWnot run0.67A measured result: 16 MW from 24 MW of heating. The field and current are the machine's limits, not that pulse's, and no page read gave its elongation, density or temperature, so the model is not run. The pulse was a transient with ions far hotter than electrons, which a steady balance would not describe.EUROfusion; ITER Organization
SPARCa design target140 MW120 MW11.05.0Held at the high-confinement threshold. The paper gives the averages as about 3 and about 7. Its own profiles are more peaked than the model's.Creely et al., Journal of Plasma Physics 86 (2020)
ARCa design target525 MW569 MW13.60.6High confinement. ARC is designed around confinement 1.8 times the scaling and a current driven without induction; the model takes the scaling as it stands.Sorbom et al., Fusion Engineering and Design 100 (2015)
EU-DEMO, 2018 baselinea design target2,000 MW2,094 MWnot stated57High confinement. The minor radius and elongation are from the 2016 baseline (Biel et al.), which was 0.1 m larger; the 2018 table read gives neither. The design radiates much of its heat from seeded impurities, which the model does not have.Siccinio et al., EUROfusion preprint WPPMI-CPR(18) 19371
5 rows

Real plants near a placeThat page reads the register; this one models. Nothing a model works out here is written back to a record.

Every registered US plant, with its capacity and fuel, is on the power and water map.Power and water map