1 viewer
Wind · NY · being built
Sunrise Wind
A planning estimate from monthly means and the spread of days inside a month.
- Rated
- 924 MW
- A year
- 3,406 GWh
- Capacity factor
- 42.1%
Before it reports
- Owner
- Orsted Wind Power North America LLC
- Where
- Suffolk County, NY
- Nameplate
- 924 MW in 1 generator
- Stage
- Under construction, half built or less
- Planned start
- Oct 2027
- Model, a whole year
- 3,406 GWh
- The inventory names no turbine. The turbine database lists Sunrise Wind with 11000 kW turbines on 200 m rotors and no hub height; the hub is taken at 137.5 m, the median of the 72 turbines at sea the U.S. Wind Turbine Database dates 2024 or later.
- Capacity, position, stage and start
- EIA-860M inventory of planned generators for September 2026, plant 67435
- Climate
- NASA POWER's monthly climatology at 40.9779, -71.0445
- Turbine
- U.S. Wind Turbine Database lists the project as Sunrise Wind
- Read
- 2026-11-11
The site
The plant
- Turbines
- 84
- Wind at the record's height
- 8.02 m/s at 50 m
- Before losses
- 49.5%
- Lost to wakes
- 9.6%
- Fit to run
- 96.0%
- Ground the farm spreads over
- 9,408 ha
| Turbines | Rotor m | Hub m | W per m2 swept | Wind at hub m/s | Rated wind m/s | Capacity factor | A year |
|---|---|---|---|---|---|---|---|
| 84 x 11,000 kW | 200.0 | 137.5 | 350 | 8.87 | 11.1 | 42.1% | 3,406 GWh |
Through the year
| Month | Wind m/s | Air kg/m3 | Before losses | Energy |
|---|---|---|---|---|
| Jan | 9.38 | 1.278 | 59.8% | 349.7 GWh |
| Feb | 9.18 | 1.280 | 58.8% | 310.5 GWh |
| Mar | 8.91 | 1.274 | 57.2% | 334.2 GWh |
| Apr | 8.27 | 1.259 | 52.7% | 298.2 GWh |
| May | 7.51 | 1.240 | 46.4% | 271.5 GWh |
| Jun | 6.93 | 1.217 | 40.9% | 231.2 GWh |
| Jul | 6.55 | 1.199 | 36.9% | 215.6 GWh |
| Aug | 6.24 | 1.196 | 33.7% | 197.2 GWh |
| Sep | 6.84 | 1.206 | 39.8% | 225.3 GWh |
| Oct | 8.31 | 1.224 | 52.4% | 306.5 GWh |
| Nov | 8.83 | 1.243 | 56.2% | 317.9 GWh |
| Dec | 9.37 | 1.262 | 59.5% | 348.0 GWh |
In 3D
To scale: 200 m rotors on 138 m hubs, four diameters apart across the wind and seven along it. Nacelles are drawn by rule. 6 of 84 turbines drawn. The towers stand in the sea; the foundations and the depth are not drawn. 3D starts when Virtual's renderer loads.
What the model leaves out
- The wind is one monthly mean speed with a Weibull spread. Direction, gusts, the daily cycle and terrain are not in it.
- The power curve is a cube to rated power at one power coefficient. A real curve rounds off below rated wind.
- Wakes are a share of output that grows with the turbine count, not a layout worked through.
- Icing, curtailment by the grid operator and noise or wildlife shutdowns are not counted.