Skip to content
1 viewer
Power
Solar · TX · being built

Swenson Solar

A planning estimate from monthly means and the spread of days inside a month.

Figures are planning estimates. They are not measurements, interconnection studies or engineering advice, and nothing here is sent to any plant or grid. How far to trust them is on the backtest.
The backtest
Rated
600 MW
A year
1,495 GWh
Capacity factor
28.4%
Being built: no year reported yet

Before it reports

Owner
Swenson Solar LLC
Where
Stonewall County, TX
Nameplate
600 MW in 1 generator
Stage
Under construction, half built or less
Planned start
Nov 2026
Model, a whole year
1,495 GWh
The model was tested on 3 built plants of this kind. Its largest misses either way put this plant's year between 1,469 GWh and 1,506 GWh. The built solar plants are all in the desert, so a cloudier site is outside what was tested. This is not a test: the figure is written down so it can be checked against form EIA-923 once the plant has reported 2027 whole.
Assumed, because the inventory does not say
  • The inventory gives no array layout: taken as single-axis trackers, which most plants of this size are now built on.
  • The inventory gives the inverter rating only: the modules are taken at 1.3 times it, about the utility-scale median.
  • Crystalline silicon modules.
Capacity, position, stage and start
EIA-860M inventory of planned generators for September 2026, plant 70135
Climate
NASA POWER's monthly climatology at 32.9854, -100.0292
Read
2026-11-11

The site

The plant

Inverters
600 MW
Modules
780 MW, Crystalline silicon
Mount
Single-axis trackers, north-south
Light on level ground
1,922 kWh/m2 a year
Light on the modules
2,522 kWh/m2 a year
Yield
1,917 kWh a year per kW of modules
Performance ratio
76.0%
Lost at the inverter limit
0.0%
Module area
380.5 ha
Land at this ground cover
1,087.1 ha
Losses taken
14.0%

Through the year

Energy by month, GWh.
050100150200Jan: 92.6 GWhJanFeb: 94.3 GWhFebMar: 129.5 GWhMarApr: 148.4 GWhAprMay: 155.3 GWhMayJun: 162.3 GWhJunJul: 159.3 GWhJulAug: 147.4 GWhAugSep: 121.3 GWhSepOct: 110.7 GWhOctNov: 91.5 GWhNovDec: 82.7 GWhDec
MonthClearnessDull to clear day, kWh/m2DiffuseOn the modules kWh/m2 a dayCell CClippedEnergy
Jan0.611.9 to 4.229.4%4.74260.0%92.6 GWh
Feb0.602.1 to 5.236.0%5.38300.0%94.3 GWh
Mar0.623.0 to 6.633.6%6.86380.0%129.5 GWh
Apr0.643.9 to 7.931.9%8.33450.0%148.4 GWh
May0.613.8 to 8.634.2%8.59500.0%155.3 GWh
Jun0.654.6 to 9.131.2%9.48550.1%162.3 GWh
Jul0.634.2 to 8.832.5%9.05570.0%159.3 GWh
Aug0.623.8 to 8.133.1%8.35560.0%147.4 GWh
Sep0.602.9 to 6.935.9%6.93490.0%121.3 GWh
Oct0.612.5 to 5.633.9%5.95410.0%110.7 GWh
Nov0.612.0 to 4.429.6%4.95330.0%91.5 GWh
Dec0.591.6 to 3.931.4%4.24260.0%82.7 GWh
12 rows

In 3D

To scale: 9 tracker rows 2.3 m wide, 6.6 m apart for a ground cover of 0.35, shown turned 35 degrees to the afternoon sun, on a 60 by 40 m patch of the 1087 ha site. 3D starts when Virtual's renderer loads.

What the model leaves out

  • Each month is five kinds of day, from its dullest fifth to its clearest, at one air temperature. A day's light keeps a smooth shape: no cloud passes at noon, so clipping still reads a little low.
  • Rows do not shade each other, and trackers do not backtrack.
  • The sky's diffuse light is taken as even across the sky, which reads a little low for a tilted array under clear sky.
  • Soiling, wiring, mismatch, ageing and outages are one share of output, the same in every month.
  • Land is module area over ground cover. Roads, setbacks, the substation and unbuildable ground are extra.