1 viewer
Wind · NY · being built
Empire Wind 1
A planning estimate from monthly means and the spread of days inside a month.
- Rated
- 814 MW
- A year
- 2,857 GWh
- Capacity factor
- 40.1%
Before it reports
- Owner
- Empire Offshore Wind LLC
- Where
- Kings County, NY
- Nameplate
- 810 MW in 1 generator
- Stage
- Under construction, more than half built
- Planned start
- Sep 2027
- Model, a whole year
- 2,857 GWh
- Neither the inventory nor the turbine database names a turbine: taken as 11000 kW on a 200 m rotor at 138 m, the median of the 72 turbines at sea the U.S. Wind Turbine Database dates 2024 or later.
- Capacity, position, stage and start
- EIA-860M inventory of planned generators for September 2026, plant 68443
- Climate
- NASA POWER's monthly climatology at 40.3200, -73.4200
- Read
- 2026-11-11
The site
The plant
- Turbines
- 74
- Wind at the record's height
- 7.70 m/s at 50 m
- Before losses
- 47.0%
- Lost to wakes
- 9.3%
- Fit to run
- 96.0%
- Ground the farm spreads over
- 8,288 ha
| Turbines | Rotor m | Hub m | W per m2 swept | Wind at hub m/s | Rated wind m/s | Capacity factor | A year |
|---|---|---|---|---|---|---|---|
| 74 x 11,000 kW | 200.0 | 137.5 | 350 | 8.52 | 11.1 | 40.1% | 2,857 GWh |
Through the year
| Month | Wind m/s | Air kg/m3 | Before losses | Energy |
|---|---|---|---|---|
| Jan | 8.97 | 1.282 | 57.6% | 297.7 GWh |
| Feb | 8.85 | 1.282 | 56.9% | 265.6 GWh |
| Mar | 8.62 | 1.271 | 55.3% | 285.7 GWh |
| Apr | 8.10 | 1.252 | 51.4% | 256.8 GWh |
| May | 7.21 | 1.231 | 43.7% | 225.6 GWh |
| Jun | 6.59 | 1.207 | 37.4% | 187.1 GWh |
| Jul | 6.21 | 1.190 | 33.3% | 172.2 GWh |
| Aug | 5.92 | 1.189 | 30.3% | 156.8 GWh |
| Sep | 6.59 | 1.201 | 37.3% | 186.6 GWh |
| Oct | 8.00 | 1.222 | 50.1% | 258.8 GWh |
| Nov | 8.45 | 1.245 | 53.7% | 268.7 GWh |
| Dec | 8.93 | 1.265 | 57.1% | 295.2 GWh |
In 3D
To scale: 200 m rotors on 138 m hubs, four diameters apart across the wind and seven along it. Nacelles are drawn by rule. 6 of 74 turbines drawn. The towers stand in the sea; the foundations and the depth are not drawn. 3D starts when Virtual's renderer loads.
What the model leaves out
- The wind is one monthly mean speed with a Weibull spread. Direction, gusts, the daily cycle and terrain are not in it.
- The power curve is a cube to rated power at one power coefficient. A real curve rounds off below rated wind.
- Wakes are a share of output that grows with the turbine count, not a layout worked through.
- Icing, curtailment by the grid operator and noise or wildlife shutdowns are not counted.