Skip to content
1 viewer
Power
Wind · IL · being built

Panther Grove 2

A planning estimate from monthly means and the spread of days inside a month.

Figures are planning estimates. They are not measurements, interconnection studies or engineering advice, and nothing here is sent to any plant or grid. How far to trust them is on the backtest.
The backtest
Rated
473 MW
A year
1,693 GWh
Capacity factor
40.9%
Being built: no year reported yet

Before it reports

Owner
Panther Grove 2 LLC
Where
Livingston County, IL
Nameplate
472 MW in 1 generator
Stage
Under construction, half built or less
Planned start
Dec 2027
Model, a whole year
1,693 GWh
The model was tested on 7 built plants of this kind. Its largest misses either way put this plant's year between 1,217 GWh and 2,338 GWh. This is not a test: the figure is written down so it can be checked against form EIA-923 once the plant has reported 2028 whole.
Assumed, because the inventory does not say
  • Neither the inventory nor the turbine database names a turbine: taken as 3400 kW on a 140 m rotor at 105 m, the median of the 2447 turbines on land the U.S. Wind Turbine Database dates 2024 or later.
Capacity, position, stage and start
EIA-860M inventory of planned generators for September 2026, plant 69690
Climate
NASA POWER's monthly climatology at 40.8153, -88.8619
Read
2026-11-11

The site

The plant

Turbines
139
Wind at the record's height
6.78 m/s at 50 m
Before losses
48.7%
Lost to wakes
10.7%
Fit to run
96.0%
Ground the farm spreads over
7,628 ha
TurbinesRotor mHub mW per m2 sweptWind at hub m/sRated wind m/sCapacity factorA year
139 x 3,400 kW140.0105.02217.539.540.9%1,693 GWh
1 row

Through the year

Energy by month, GWh.
050100150200Jan: 168.1 GWhJanFeb: 149.6 GWhFebMar: 166.1 GWhMarApr: 167.8 GWhAprMay: 147.6 GWhMayJun: 115.4 GWhJunJul: 91.6 GWhJulAug: 88.9 GWhAugSep: 117.6 GWhSepOct: 155.3 GWhOctNov: 162.1 GWhNovDec: 163.2 GWhDec
MonthWind m/sAir kg/m3Before lossesEnergy
Jan7.511.28256.9%168.1 GWh
Feb7.421.27456.1%149.6 GWh
Mar7.501.24456.2%166.1 GWh
Apr7.891.21458.7%167.8 GWh
May6.881.18950.0%147.6 GWh
Jun5.971.16840.4%115.4 GWh
Jul5.171.16031.0%91.6 GWh
Aug5.091.16430.1%88.9 GWh
Sep6.021.17941.1%117.6 GWh
Oct7.131.21052.6%155.3 GWh
Nov7.571.24056.7%162.1 GWh
Dec7.331.26955.2%163.2 GWh
12 rows

In 3D

To scale: 140 m rotors on 105 m hubs, four diameters apart across the wind and seven along it. Nacelles are drawn by rule. 6 of 139 turbines drawn. 3D starts when Virtual's renderer loads.

What the model leaves out

  • The wind is one monthly mean speed with a Weibull spread. Direction, gusts, the daily cycle and terrain are not in it.
  • The power curve is a cube to rated power at one power coefficient. A real curve rounds off below rated wind.
  • Wakes are a share of output that grows with the turbine count, not a layout worked through.
  • Icing, curtailment by the grid operator and noise or wildlife shutdowns are not counted.