1 viewer
Hydro · a design
Hydro plant
A planning estimate from monthly means and the spread of days inside a month.
- Rated
- 208 MW
- A year
- 939.7 GWh
- Capacity factor
- 51.6%
The site
The plant
- Runner
- Francis, 4 units
- Each unit
- 52.0 MW at 60.0 m3/s
- Head at the turbine
- 98.0 m
- Speed
- 257.1 rpm on 28 poles
- Specific speed
- 192 (rpm, kW, m)
- Runner diameter
- 2.57 m
- Water to wire at rated flow
- 90.2%
- Peak turbine efficiency
- 94.3%
- Penstock, each
- 3.91 m across, 200 m long
- Lost in the water passage
- 2.03 m at rated flow
- Runner setting
- 2.1 m below tailwater (Thoma 0.125)
- River, mean
- 141.4 m3/s
- Day-to-day spread of flow
- steady inside each month
- River through the turbines
- 86.6%
- From each million m3 turbined
- 243.4 MWh
Through the year
| Month | River m3/s | Turbined | Past the turbines | Most units on | Water to wire | Mean output | Energy |
|---|---|---|---|---|---|---|---|
| Jan | 90.0 | 85.0 | 9.2 | 2 | 90.4% | 70.8 MW | 52.7 GWh |
| Feb | 95.0 | 90.0 | 9.5 | 2 | 91.2% | 75.6 MW | 50.8 GWh |
| Mar | 120.0 | 115.0 | 10.8 | 2 | 91.7% | 96.4 MW | 71.7 GWh |
| Apr | 190.0 | 185.0 | 14.2 | 4 | 91.5% | 156 MW | 112.2 GWh |
| May | 300.0 | 240.0 | 72.0 | 4 | 90.2% | 198 MW | 146.9 GWh |
| Jun | 280.0 | 240.0 | 52.0 | 4 | 90.2% | 198 MW | 142.2 GWh |
| Jul | 170.0 | 165.0 | 13.2 | 3 | 92.4% | 140 MW | 103.9 GWh |
| Aug | 110.0 | 105.0 | 10.2 | 2 | 92.4% | 89.0 MW | 66.2 GWh |
| Sep | 85.0 | 80.0 | 9.0 | 2 | 89.3% | 66.0 MW | 47.5 GWh |
| Oct | 80.0 | 75.0 | 8.8 | 2 | 88.1% | 61.1 MW | 45.5 GWh |
| Nov | 85.0 | 80.0 | 9.0 | 2 | 89.3% | 66.0 MW | 47.5 GWh |
| Dec | 90.0 | 85.0 | 9.2 | 2 | 90.4% | 70.8 MW | 52.7 GWh |
In 3D
To scale: 100 m of head, 2.6 m Francis runners, 3.9 m penstocks. The dam's section, the hall and the generators are drawn by rule, not sized. Water goes over the dam because the wettest month sends 55 m3/s past the turbines; the spillway's width is by rule. Lift layers raises the hall off the units. 3D starts when Virtual's renderer loads.
What the model leaves out
- A month's days are ten classes of flow, each steady. A reference plant's are its gauge's; a design's are steady unless a spread is given, and then lognormal.
- No spill is ordered. A dam that must pass water for fish does so here only if it is given as flow kept out of the turbines.
- Forebay and tailwater do not move. A reservoir drawn down loses head, and high flow lifts the tailwater.
- No reservoir is operated: water is turbined in the month it arrives. Give the river as the dam releases it.
- Every unit is alike, and the efficiency curve is a shape for its runner type, not a manufacturer's hill chart.
- The cavitation setting is for sea level and cold water.