Hydro · a design

Hydro plant

A planning estimate from monthly means and the spread of days inside a month.

Figures are planning estimates. They are not measurements, interconnection studies or engineering advice, and nothing here is sent to any plant or grid. How far to trust them is on the backtest.
The backtest
Rated
208 MW
A year
939.7 GWh
Capacity factor
51.6%
A design, not a plant

The site

The plant

Runner
Francis, 4 units
Each unit
52.0 MW at 60.0 m3/s
Head at the turbine
98.0 m
Speed
257.1 rpm on 28 poles
Specific speed
192 (rpm, kW, m)
Runner diameter
2.57 m
Water to wire at rated flow
90.2%
Peak turbine efficiency
94.3%
Penstock, each
3.91 m across, 200 m long
Lost in the water passage
2.03 m at rated flow
Runner setting
2.1 m below tailwater (Thoma 0.125)
River, mean
141.4 m3/s
Day-to-day spread of flow
steady inside each month
River through the turbines
86.6%
From each million m3 turbined
243.4 MWh

Through the year

Energy by month, GWh.
050100150Jan: 52.7 GWhJanFeb: 50.8 GWhFebMar: 71.7 GWhMarApr: 112.2 GWhAprMay: 146.9 GWhMayJun: 142.2 GWhJunJul: 103.9 GWhJulAug: 66.2 GWhAugSep: 47.5 GWhSepOct: 45.5 GWhOctNov: 47.5 GWhNovDec: 52.7 GWhDec
MonthRiver m3/sTurbinedPast the turbinesMost units onWater to wireMean outputEnergy
Jan90.085.09.2290.4%70.8 MW52.7 GWh
Feb95.090.09.5291.2%75.6 MW50.8 GWh
Mar120.0115.010.8291.7%96.4 MW71.7 GWh
Apr190.0185.014.2491.5%156 MW112.2 GWh
May300.0240.072.0490.2%198 MW146.9 GWh
Jun280.0240.052.0490.2%198 MW142.2 GWh
Jul170.0165.013.2392.4%140 MW103.9 GWh
Aug110.0105.010.2292.4%89.0 MW66.2 GWh
Sep85.080.09.0289.3%66.0 MW47.5 GWh
Oct80.075.08.8288.1%61.1 MW45.5 GWh
Nov85.080.09.0289.3%66.0 MW47.5 GWh
Dec90.085.09.2290.4%70.8 MW52.7 GWh
12 rows

In 3D

To scale: 100 m of head, 2.6 m Francis runners, 3.9 m penstocks. The dam's section, the hall and the generators are drawn by rule, not sized. Water goes over the dam because the wettest month sends 55 m3/s past the turbines; the spillway's width is by rule. Lift layers raises the hall off the units. 3D starts when Virtual's renderer loads.

What the model leaves out

  • A month's days are ten classes of flow, each steady. A reference plant's are its gauge's; a design's are steady unless a spread is given, and then lognormal.
  • No spill is ordered. A dam that must pass water for fish does so here only if it is given as flow kept out of the turbines.
  • Forebay and tailwater do not move. A reservoir drawn down loses head, and high flow lifts the tailwater.
  • No reservoir is operated: water is turbined in the month it arrives. Give the river as the dam releases it.
  • Every unit is alike, and the efficiency curve is a shape for its runner type, not a manufacturer's hill chart.
  • The cavitation setting is for sea level and cold water.