Lay out a plant from the parts
Vehicle plant
Choose a vehicle and a rate. Every part in its system graph is assigned to a station on a moving line: press, body, paint, powerpack, trim, chassis, final and test. This is a plan with assumed times, not a record of any real plant.
- A vehicle every
- 300 s · assumed
- Stations
- 45 · computed
- On the floor at once
- 59 · computed
- Workers on the line
- 50 · computed
- Start to finish
- 4.9 h · computed
- Vehicles a shift
- 96 · computed
- Hours of work a vehicle
- 3.3 · assumed
- Idle share of paid time
- 21% · computed
- Pass the test first time
- 79.6% · simulated
- Ship, passed or reworked
- 97.8% · simulated
- Held a shift
- 2.1 · simulated
- Rework hours a shift
- 29.2 · simulated
- Repair bays
- 4 · computed
| Shop | Stations | Parts | Hours of work |
|---|---|---|---|
| Press | 3 | 0 | 0.1 |
| Body | 8 | 5 | 0.5 |
| Paint | 8 | 0 | 1.1 |
| Powerpack | 7 | 49 | 0.7 |
| Trim | 5 | 25 | 0.7 |
| Chassis | 12 | 59 | 1.4 |
| Final | 2 | 15 | 0.3 |
| Test | 5 | 0 | 0.3 |
| Station | Worked by | Load | Minutes of work | What happens here |
|---|---|---|---|---|
| Blank the coil | Machine | 20% | 1.0 | Blank the coil |
| Draw the panels | Machine | 59% | 2.9 | Draw the panels |
| Trim and pierce | Machine | 30% | 1.5 | Trim and pierce |
| Weld the underbody | Machine | 80% | 4.0 | Weld the underbody |
| Weld the left side frame | Machine | 60% | 3.0 | Weld the left side frame |
| Weld the right side frame | Machine | 60% | 3.0 | Weld the right side frame |
| Frame the body and fit the roof | Machine | 80% | 4.0 | Frame the body and fit the roof, Frame or unibody |
| Respot the welds | Machine | 80% | 4.0 | Respot the welds |
| Body 1 | Crew | 90% | 9.0 | Door |
| Body 2 | Crew | 30% | 3.0 | Door |
| Inspect the body in white | Machine | 40% | 2.0 | Inspect the body in white |
| E-coat dip (busiest) | Machine | 100% | 20.0 | E-coat dip |
| Seal the seams | Machine | 80% | 4.0 | Seal the seams |
| Primer booth | Machine | 60% | 6.0 | Primer booth |
| Transfer | Transfer | 0% | 0.0 | |
| Transfer | Transfer | 0% | 0.0 | |
| Basecoat booth | Machine | 70% | 7.0 | Basecoat booth |
| Clearcoat booth | Machine | 60% | 6.0 | Clearcoat booth |
| Curing oven | Machine | 100% | 25.0 | Curing oven |
| Trim 1 | Crew | 75% | 15.0 | Main wiring harness |
| Trim 2 | Crew | 100% | 10.0 | Body control module, Engine control module, Transmission control module, and 5 more |
| Trim 3 | Crew | 65% | 6.5 | Air bag, Seat belt, Steering column, and 2 more |
| Trim 4 | Crew | 92% | 9.2 | Windshield, Side mirror, Ambient air temperature sensor, and 2 more |
| Trim 5 | Crew | 35% | 3.5 | Headlamp, Tail lamp |
| Transfer | Transfer | 0% | 0.0 | |
| Transfer | Transfer | 0% | 0.0 | |
| Marriage | Crew | 40% | 4.0 | Join the powerpack to the body |
| Chassis 1 | Crew | 72% | 7.2 | Fuel tank, Fuel pump, Fuel level sender, and 2 more |
| Chassis 2 | Crew | 100% | 10.0 | Axle beam, Leaf spring pack |
| Chassis 3 | Crew | 90% | 9.0 | Final drive, Axle shaft, Prop shaft, and 1 more |
| Chassis 4 | Crew | 100% | 10.0 | Strut, Control arm, Damper, and 2 more |
| Chassis 5 | Crew | 95% | 9.5 | Hub bearing, Steering gear, Tie rod |
| Chassis 6 | Crew | 100% | 10.0 | Master cylinder, Brake booster, ABS module, and 2 more |
| Chassis 7 | Crew | 80% | 8.0 | Brake caliper, Brake pad, Wheel speed sensor, and 1 more |
| Chassis 8 | Crew | 97% | 9.7 | Diesel particulate filter, SCR catalyst, Exhaust temperature sensor, and 3 more |
| Chassis 9 | Crew | 68% | 6.8 | Air filter, Mass air flow sensor, Radiator, and 2 more |
| Final 1 | Crew | 100% | 10.0 | Seat, 12 V battery, Wheel |
| Final 2 | Crew | 73% | 7.3 | Tyre, Tyre pressure sensor, Fill the fluids |
| Wheel alignment | Machine | 80% | 4.0 | Wheel alignment |
| Aim the headlamps | Machine | 40% | 2.0 | Aim the headlamps |
| Roller brake test | Machine | 60% | 3.0 | Roller brake test |
| Rain test | Machine | 80% | 4.0 | Rain test |
| Run diagnostics | Machine | 60% | 3.0 | Run diagnostics |
| Powerpack 1 | Crew | 85% | 8.5 | Engine block, Crankshaft, Piston, and 1 more |
| Powerpack 2 | Crew | 98% | 9.8 | Cylinder head, Camshaft, Timing drive, and 5 more |
| Powerpack 3 | Crew | 100% | 10.0 | Oil pressure sensor, Water pump, Thermostat, and 9 more |
| Powerpack 4 | Crew | 75% | 7.5 | Fuel injector, High-pressure pump, Fuel rail pressure sensor, and 5 more |
| Powerpack 5 | Crew | 40% | 4.0 | Gearbox, Gearbox speed sensor, Gearbox fluid temperature sensor |
| Cold test the powerpack | Machine | 40% | 2.0 | Cold test the powerpack |
| Transfer | Transfer | 0% | 0.0 |
Yield and rework
Of 500 vehicles on the shared line model, 91 failed the test and were repaired and shipped, and 11 failed the retest and are held. The line ships 11.69 vehicles an hour against 12 asked. First-pass yields, repair times and the draw seed are assumed allowances for a mixed line, not measured in any plant.
Floor plan
On the shared line model
| Figure (simulated) | Paced plan | Shared model | Result |
|---|---|---|---|
| vehicles shipped an hour | 11.54 | 11.69 | agrees |
| first vehicle's lead time, h | 4.93 | 4.93 | agrees |
| mean lead time of a shipped vehicle, h | 5.21 | 5.21 | agrees |
| share passed first time | 79.4% | 79.6% | agrees |
| share reworked and shipped | 18.2% | 18.2% | agrees |
| share held | 2.4% | 2.2% | agrees |
How to read the figures
measured: read from a real line, machine or record. computed: calculated from other figures by a stated rule. assumed: a typical figure written into the line, not measured. simulated: read from a replayed run of the line.
What it is made from
Every part
Each part has its own page: what the sources state about it, with each fact's basis and source, and its graph down to the raw materials. Open the bill.
Walk it in Virtual
In Virtual: plant floor, plant load vehicle sprinter, then plant play 60. A vehicle that passes the test lane is parked in the yard, ready to drive.
Not stated by the sources
Cylinders, turbo count, injection, air metering, suspension, brakes, steering, doors and seats.