CRE8 makes one cargo van. The press stamps each body panel. The engine is designed for the load. The control unit uses the controller from the chip factory. Each step is a node of one make graph, back to the raw materials.

PlantClass billEngine
Gross rating
4105 kg
Payload after upfit
1731 kg
Parts
152
Make steps
318
Graph
make:vehicle-cre8-van/vehicle-cre8-van-fitted
Engine
4 cyl, 142 kW
Not traced to rock
18
Traced one step deeper
98
Class figures
FigureValueBasisSource
Floor length3.38 m (133 in)publishedCargo bed length. Mercedes-Benz 2026 page.
Floor width1.78 m (70 in)publishedMaximum at the floor. Mercedes-Benz 2026 page.
Width between wheel wells1.35 m (53 in)publishedMercedes-Benz 2026 page.
Ceiling height2.01 m (79 in)publishedInterior height. Mercedes-Benz 2026 page.
Wheelbase3.66 mpublished144 in nominal wheelbase; not a measured axle hardpoint.
Rear overhang1.24 m (49 in)publishedMercedes-Benz 2026 page.
Curb mass2230 kgpublished4916 lb base curb mass. Add occupants/cargo separately; 9050 lb GVWR is a limit, not operating mass. OEM axle mass rows are inconsistent and rejected.
Gross vehicle weight rating4105 kg (9,050 lb)publishedA limit, not an operating mass.
Maximum payload1875 kgderivedThe rating less base curb mass. Occupants, fuel beyond curb, racking and any upfit come out of it.
Front axle rating1,860 kg (4,101 lb)publishedStandard; 4,409 lb as an option. Mercedes-Benz 2026 page.
Rear axle rating2,431 kg (5,359 lb)publishedMercedes-Benz 2026 page.
Curb mass on the front axle919 kg (2,025 lb)publishedThe page prints 2,025 lb front and 2,914 lb rear. The rows sum to 23 lb over its base curb weight and read rear-heavy for a front-engine van, so they may be swapped, and a check holds only if it holds both ways round.
Curb mass on the rear axle1,322 kg (2,914 lb)publishedThe page prints 2,025 lb front and 2,914 lb rear. The rows sum to 23 lb over its base curb weight and read rear-heavy for a front-engine van, so they may be swapped, and a check holds only if it holds both ways round.
13 rows
Body in white, panel by panel
Panelm² eachmmCountkg
Floor pan10.211180
Roof panel10.810.75164
Side outer11.310.82142
Bonnet, wings and front panel3.290.8121
Pillars, rails and reinforcements9.111.51107
5 rows
Wiring: 55 circuits, 143 conductors
PartSlotConductors
12 V batteryelectrical.battery2
Alternatorelectrical.alternator2
Starter motorelectrical.starter2
Engine control moduleelectrical.engine_module4
Transmission control moduleelectrical.gearbox_module4
Body control moduleelectrical.body_module4
Instrument clusterelectrical.instrument_cluster4
ABS modulebrakes.abs_module4
Headlampelectrical.headlamp.left2
Tail lampelectrical.tail_lamp.left2
Headlampelectrical.headlamp.right2
Tail lampelectrical.tail_lamp.right2
Camshaft position sensorengine.cam_sensor[1]3
Camshaft position sensorengine.cam_sensor[2]3
Crankshaft position sensorengine.crank_sensor3
Oil pressure sensorengine.oil_pressure_sensor3
Intake air temperature sensorair.intake_temp_sensor3
Mass air flow sensorair.mass_air_flow_sensor3
Manifold pressure sensorair.manifold_pressure_sensor3
Glow plugengine.cylinder[1].glow_plug2
Fuel injectorengine.cylinder[1].injector2
Glow plugengine.cylinder[2].glow_plug2
Fuel injectorengine.cylinder[2].injector2
Glow plugengine.cylinder[3].glow_plug2
Fuel injectorengine.cylinder[3].injector2
Glow plugengine.cylinder[4].glow_plug2
Fuel injectorengine.cylinder[4].injector2
Cooling fancooling.fan2
Coolant temperature sensorcooling.temp_sensor3
Gearbox speed sensortransmission.input_speed_sensor3
Gearbox speed sensortransmission.output_speed_sensor3
Gearbox fluid temperature sensortransmission.fluid_temp_sensor3
Fuel pumpfuel.pump2
High-pressure pumpfuel.high_pressure_pump2
Fuel level senderfuel.level_sender3
Fuel rail pressure sensorfuel.pressure_sensor3
EGR valveemissions.egr_valve2
Exhaust temperature sensoremissions.exhaust_temp_sensor[1]3
NOx sensoremissions.nox_sensor[1]3
Exhaust temperature sensoremissions.exhaust_temp_sensor[2]3
NOx sensoremissions.nox_sensor[2]3
Particulate filter pressure sensoremissions.filter_pressure_sensor3
A/C compressorhvac.ac_compressor2
Blower motorhvac.blower2
Ambient air temperature sensorhvac.ambient_temp_sensor3
Wheel speed sensorbrakes.front.left.speed_sensor3
Wheel speed sensorbrakes.front.right.speed_sensor3
Wheel speed sensorbrakes.rear.left.speed_sensor3
Wheel speed sensorbrakes.rear.right.speed_sensor3
Wiperbody.wiper.left2
Wiperbody.wiper.right2
Side mirrorbody.mirror.left2
Side mirrorbody.mirror.right2
Air bagrestraints.airbag.driver2
Air bagrestraints.airbag.passenger2
55 rows
Upfit: 144 kg
PartkgMaterialSize from
Cargo floor49birch plywoodFloor length times floor width in 12 mm birch plywood.
Wall liners41birch plywoodBoth walls, floor length times ceiling height, 75 % covered, in 6 mm plywood.
Cab bulkhead32steel stripFloor width times ceiling height in 1 mm steel, with its frame.
Tie-down rails12aluminium plate4 runs of rail the floor length, at 0.9 kg a metre.
Wall and roof insulation7.83closed-cell foam board, bought; its chemistry is the maker'sBoth walls and the roof at 0.4 kg a square metre.
Cargo lights1.20LED fittings, bought finished; the board and driver are the maker's4 fittings at 0.3 kg.
6 rows
Each station of the plant
StationRoleMakesOperatorUnitss eachUse
Build the powerpackfeedmake:vehicle-cre8-van/powerpackassembler7359 · simulated4 % · simulated
Stamp the roof panelfeedmake:vehicle-cre8-van/panel-roofautomatic18 · simulated0 % · simulated
Stamp the side outerfeedmake:vehicle-cre8-van/panel-side-outerautomatic116 · simulated0 % · simulated
Stamp the bonnet, wings and front panelfeedmake:vehicle-cre8-van/panel-front-endautomatic18 · simulated0 % · simulated
Stamp the pillars, rails and reinforcementsfeedmake:vehicle-cre8-van/panel-inner-structureautomatic18 · simulated0 % · simulated
Assemble the ECUfeedmake:vehicle-cre8-van/ecu-hardwareassembler10 · simulated0 % · simulated
Flash the calibrationfeedmake:vehicle-cre8-van/ecu-flashedautomatic10 · simulated0 % · simulated
Test the ECUfeedmake:vehicle-cre8-van/part-electrical-engine-moduletester10 · simulated0 % · simulated
Stamp the floor panpathmake:vehicle-cre8-van/panel-floor-panautomatic18 · simulated0 % · simulated
Kit the stamped panelspathmake:vehicle-cre8-van/stamped-panelskitter1150 · simulated2 % · simulated
Weld the bodypathmake:vehicle-cre8-van/body-in-whiterobot (welding_robot)8240 · simulated3 % · simulated
Paint the bodypathmake:vehicle-cre8-van/painted-bodyrobot (paint_robot)8510 · simulated6 % · simulated
Trim the bodypathmake:vehicle-cre8-van/trimmed-bodyassembler5531 · simulated6 % · simulated
Marry and build the chassispathmake:vehicle-cre8-van/rolling-chassisassembler12421 · simulated5 % · simulated
Final assemblypathmake:vehicle-cre8-van/assembled-vehicleassembler2520 · simulated6 % · simulated
Test the vehiclepathmake:vehicle-cre8-van/vehicle-cre8-vantest driver5192 · simulated3 % · simulated
Fit out the cargo areapathmake:vehicle-cre8-van/vehicle-cre8-van-fittedupfitter27200 · simulated84 % · simulated
Repair bayrepairrepair technician40 · simulated2 % · simulated
18 rows

Each van of this run

vehicle-cre8-van-line-u0001

passed the test lane; out at 8.4 h · simulated

vehicle-cre8-van-line-u0002

passed the test lane; out at 8.5 h · simulated

vehicle-cre8-van-line-u0003

passed the test lane; out at 12.4 h · simulated

vehicle-cre8-van-line-u0004

passed the test lane; out at 12.5 h · simulated

vehicle-cre8-van-line-u0005

passed after 1 loop through the repair bay; out at 28.5 h · simulated

vehicle-cre8-van-line-u0006

passed the test lane; out at 16.4 h · simulated

vehicle-cre8-van-line-u0007

passed the test lane; out at 16.5 h · simulated

vehicle-cre8-van-line-u0008

passed the test lane; out at 20.5 h · simulated

vehicle-cre8-van-line-u0009

passed the test lane; out at 20.4 h · simulated

vehicle-cre8-van-line-u0010

passed after 1 loop through the repair bay; out at 24.4 h · simulated

vehicle-cre8-van-line-u0011

passed the test lane; out at 28.4 h · simulated

vehicle-cre8-van-line-u0012

passed the test lane; out at 24.5 h · simulated

Parts the van shares with other lines

Chip: CRE8 E1 engine controller (ecu-asic)

The controller of the control unit, node make:vehicle-cre8-van/ecu-asic of the van graph. The chip factory makes it.

Engine: the engine for the van's duty

The engine page runs the duty search, shows the engine line and the backtest band.

Robots: welding_robot at weld the body; paint_robot at paint the body

A robot class works each of these stations. The robot factory gives each station its robot record. Until then, the robot part is open.

Raw and recovered materials for one van
MaterialSourceQuantityUnit
Copper oreraw3490.0kg
Iron oreraw2080.0kg
Platinum-group oreraw826.0kg
Coalraw787.0kg
Bauxiteraw619.0kg
Limestoneraw350.0kg
Birch logsraw241.0kg
Crude oilraw209.0kg
Lead oreraw118.0kg
Nickel oreraw66.7kg
Rock saltraw54.3kg
Silica sandraw44.0kg
Natural rubberraw16.8kg
Natural gasraw13.9kg
Kaolinraw12.7kg
Zinc oreraw10.6kg
Ilmeniteraw7.4kg
Talcraw5.1kg
Quartzraw4.3kg
Colemaniteraw2.6kg
Tin oreraw1.7kg
Chromiteraw0.9kg
Bariteraw0.4kg
Bromide brineraw0.3kg
Pine oleoresinraw0.0kg
Steel scraprecovered494.0kg
Aluminium scraprecovered52.9kg
Battery lead scraprecovered8.5kg
Glass culletrecovered8.1kg
Sulfurrecovered1.6kg
Silverrecovered0.0kg
31 rows
Traced one step deeper: 98 of 109 gaps
InputNow traced byThe gap it named
12 V batterytypical teardown; the supplier's step stays undisclosedbought finished; the lead, acid and grid alloy, and the plate line, are not drawn yet
Alternatortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Starter motortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
PVC insulation compoundtypical chain to the groundPVC with plasticiser and stabiliser; compound not disclosed
Moulded housing plastictypical chain to the groundnylon or ABS of a bought part; grade not disclosed
Transmission control moduletypical teardown; the supplier's step stays undisclosedbought finished; the board, chips and firmware are the supplier's
Body control moduletypical teardown; the supplier's step stays undisclosedbought finished; the board, chips and firmware are the supplier's
Instrument clustertypical teardown; the supplier's step stays undisclosedbought finished; the board, chips and firmware are the supplier's
ABS moduletypical teardown; the supplier's step stays undisclosedbought finished; the board, chips and firmware are the supplier's
Headlamptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Tail lamptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Headlamptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Tail lamptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Accelerator pedal sensortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Caustic sodatypical chain to the groundfrom chlor-alkali cells; not drawn yet
Carbon anodetypical chain to the groundbaked petroleum coke and pitch; the refinery behind it is not drawn yet
Ferrosilicon inoculanttypical chain to the groundbought inoculant; its smelter is not drawn yet
Camshaft position sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Camshaft position sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Crankshaft position sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Timing drivetypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Oil pumptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Oil filtertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Oil pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Air filtertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Intake air temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Mass air flow sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Manifold pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Turbochargertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Glow plugtypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel injectortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Glow plugtypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel injectortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Glow plugtypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel injectortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Glow plugtypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel injectortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Water pumptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Thermostattypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Cooling fantypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Coolant temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Torque convertertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Gearbox speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Gearbox speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Gearbox fluid temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Fuel pumptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel filtertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
High-pressure pumptypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Fuel level sendertypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Fuel rail pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
EGR valvetypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Diesel particulate filtertypical teardown; the supplier's step stays undisclosedbought finished; the substrate, washcoat and precious-metal loading are the supplier's
SCR catalysttypical teardown; the supplier's step stays undisclosedbought finished; the substrate, washcoat and precious-metal loading are the supplier's
DEF tanktypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Exhaust temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
NOx sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Exhaust temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
NOx sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Particulate filter pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
A/C compressortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Blower motortypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Ambient air temperature sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Brake boostertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Master cylindertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Parking braketypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Wheel speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Brake padtypical teardown; the supplier's step stays undisclosedbought finished; the friction compound is the supplier's
Wheel speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Brake padtypical teardown; the supplier's step stays undisclosedbought finished; the friction compound is the supplier's
Wheel speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Brake padtypical teardown; the supplier's step stays undisclosedbought finished; the friction compound is the supplier's
Wheel speed sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Brake padtypical teardown; the supplier's step stays undisclosedbought finished; the friction compound is the supplier's
Steering geartypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Synthetic rubbertypical chain to the groundstyrene-butadiene and polybutadiene from oil; the cracker behind it is not drawn yet
Carbon blacktypical chain to the groundfurnace black from heavy oil; not drawn yet
Oils, silica and curativestypical chain to the groundthe compounder's recipe is its own
Tyre cordtypical chain to the groundpolyester and nylon cord; not drawn yet
Tyre pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Tyre pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Tyre pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Tyre pressure sensortypical teardown; the supplier's step stays undisclosedbought finished; the sensing element and its calibration are the maker's
Soda ashtypical chain to the groundfrom trona or the Solvay process; not drawn yet
PVB interlayertypical chain to the groundlaminating film; its resin is not drawn yet
Wipertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Wipertypical teardown; the supplier's step stays undisclosedbought finished; no open drawing or process behind it
Seat foam and covertypical chain to the groundpolyurethane foam and trim fabric; not drawn yet
Seat belttypical teardown; the supplier's step stays undisclosedbought finished; the inflator chemistry and webbing are the supplier's
Seat belttypical teardown; the supplier's step stays undisclosedbought finished; the inflator chemistry and webbing are the supplier's
Air bagtypical teardown; the supplier's step stays undisclosedbought finished; the inflator chemistry and webbing are the supplier's
Air bagtypical teardown; the supplier's step stays undisclosedbought finished; the inflator chemistry and webbing are the supplier's
Zinc platingtypical chain to the groundzinc and passivate chemistry; the zinc's mine is not drawn yet
E-coat, primer, base and cleartypical chain to the groundCoating chemistry is the paint maker's own
Hydrogen chloride and hydrogentypical chain to the groundthe chlor-alkali and hydrogen plants behind them are not drawn yet
Brominated epoxy and hardenertypical chain to the groundpetrochemical epoxy system; the chain behind it is not drawn yet
Solder fluxtypical chain to the groundno-clean rosin flux; formulation not disclosed
Conformal coatingtypical chain to the groundthe acrylic coating's chemistry is not disclosed
Birch plywoodtypical chain to the groundveneer peeled from birch logs, glued and pressed; the mill is not drawn yet
98 rows

Where the figures come from

The van has no maker's name. Its class figures come from the reference twin of the large high-roof van (2026 Cargo 2500 · 144 in high roof · RWD · 1.95 L diesel · 9G-TRONIC). Each figure has its basis. This page types no figure.

The engine

The engine has 4 cylinders and 1.77 l. It gives 142 kW at 4600 rpm and 295 Nm at 3680 rpm. Its mass is approximately 174 kg. The search tried 1 engines, and this engine is the smallest that does the duty. The duty is a 6 % grade at 90 km/h and a start on a 20 % grade, at the gross rating of 4105 kg. The search uses the valve timing and limits of the Mercedes OM651. These figures are model figures. The engine page shows the search and the backtest band.

The control unit

CRE8 makes the control unit: Engine control module (make:vehicle-cre8-van/part-electrical-engine-module). Its controller is the CRE8 E1 engine controller from the chip factory (make:vehicle-cre8-van/ecu-asic). The chip page is /view/circuit/asics?part=ecu-asic. The flashed unit holds the engine tables from /view/engine/duty?mass_kg=4105.0109485&drag_area=1.8665849550428015&rolling=0.009&wheel_m=0.375&driveline=0.88&all_wheels=off&gears=5.503,3.333,2.315,1.661,1.211,1,0.865,0.717,0.601&final_drive=4.182&ignition=compression&hold_grade_pct=6&hold_kmh=90&start_grade_pct=20.

Body steel

The panels have a mass of 414 kg. The box of the van gives their areas. The doors are separate parts. Panel gauges, the cut-outs in each skin, the inner structure's share and the blank yield are typical for a steel van body, not this van's drawings.

The plant

The plant uses the shared production-line model (cre8.production.line.v1). The line is line:vehicle-cre8-van-line. In this run, 12 vans start, 12 pass and 0 are held. The slowest station is Fit out the cargo area, and it sets a rate of 0.50 vans an hour · computed. The run makes 0.42 vans an hour · simulated. A van is on the line for 18.4 h · simulated, and the line holds 7.7 vans · simulated. A station of a shop takes the work time of that shop from the vehicle line plan. The test lane finds the defects of all the shops. A van that fails goes through the repair bay and back to the test once. If it fails again, it is held.

The goods trace

Each van of the run has a trace: each station it passed, each lot it drew and the raw materials behind them. The goods trace (value_chain.v1) holds a van as one line_unit leaf. The leaf is the SHA-256 of that trace. To verify the chain, Provenance reads the trace again from the Vehicle app. To make the chain of the first van, send ValueChain.Build with line_unit vehicle-cre8-van-line-u0001 and owner Vehicle. Its page is then /view/provenance/vchain-unit-vehicle-cre8-van-line-u0001.

How to read the figures

measured: read from a real line, machine or record. computed: calculated from other figures by a stated rule. assumed: a typical figure written into the line, not measured. simulated: read from a replayed run of the line.

Inputs not traced to rock

There are 18 such inputs: Chip resistors and capacitors, Sensing element, LED emitters, Sealed ECU connector, Cargo lights, Wall and roof insulation, Coloured and effect pigments, Copper zeolite coat, Gas generant, Molybdenum, niobium, aluminium and titanium, Board etchants, plating and solder mask, Trivalent chromium passivate, Fab gases, acids and photoresist, Epoxy mould compound, Dopant sources, Aluminium sputter target, CRE8 E1 engine controller layout, Mask blanks and writer time. The graph keeps each one as a gap and counts it.

The make graph

Rock salt (raw): 54.3 kg per CRE8 large van with its upfit; mined or solution-mined: halite.Rock saltCoal (raw): 787 kg per CRE8 large van with its upfit; mined: bituminous coal.CoalQuartz (raw): 4.31 kg per CRE8 large van with its upfit; quarried: high-purity quartz lump.QuartzNatural gas (raw): 13.9 kg per CRE8 large van with its upfit; drilled: natural gas, mostly methane.Natural gasChlorine (material): Electrolyse brine for chlorine, bought. 6.24 runs per CRE8 large van with its upfit; described.ChlorineMetallurgical silicon (material): Reduce quartz to silicon, bought. 0.192 runs per CRE8 large van with its upfit; described.Metallurgical siliconHydrogen chloride and hydrogen (material): Burn chlorine in hydrogen, bought. 0.00124 runs per CRE8 large van with its upfit; described.Hydrogen chloride and…Polysilicon (material): Refine silicon to polysilicon, bought. 0.00207 runs per CRE8 large van with its upfit; described.PolysiliconSingle-crystal silicon ingot (material): Grow a single-crystal ingot, bought. 0.0018 runs per CRE8 large van with its upfit; described.Single-crystal silico…CRE8 E1 engine controller layout (opaque): 0.0000674 wafer's share per CRE8 large van with its upfit; no layout exists: the design stops at a netlist, and place and route on the PDK has not run.CRE8 E1 engine contro…Mask blanks and writer time (opaque): 0.0000674 wafer's share per CRE8 large van with its upfit; the mask shop's inputs are not drawn.Mask blanks and write…Silicon wafer, 200 mm (part): Slice and polish wafers, bought. 0.0164 runs per CRE8 large van with its upfit; described.Silicon wafer, 200 mmFab gases, acids and photoresist (opaque): 0.0164 kg per CRE8 large van with its upfit; per-wafer loadings vary by node and fab; not disclosed.Fab gases, acids and …CRE8 E1 engine controller mask set (part): Write the CRE8 E1 engine controller mask set, bought; meant to be made by a partner (mask_shop). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Dopant sources (opaque): 0.000135 wafer per CRE8 large van with its upfit; boron, phosphorus and arsenic sources; their chains are not drawn.Dopant sourcesCRE8 E1 engine controller wafer, isolation and wells (part): Isolation and wells, bought; meant to be made by a partner (open_pdk_foundry). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…CRE8 E1 engine controller wafer, gate stack (part): Gate stack, bought; meant to be made by a partner (open_pdk_foundry). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…CRE8 E1 engine controller wafer, sources and drains (part): Sources and drains, bought; meant to be made by a partner (open_pdk_foundry). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Aluminium sputter target (opaque): 0.0000674 wafer per CRE8 large van with its upfit; high-purity aluminium for the metal layers; its chain is not drawn.Aluminium sputter tar…Crude oil (raw): 209 kg per CRE8 large van with its upfit; drilled: crude oil.Crude oilCopper ore (raw): 3490 kg per CRE8 large van with its upfit; mined: porphyry copper ore, about 0.6 % Cu.Copper oreCRE8 E1 engine controller wafer, contacts and metal (part): Contacts and metal, bought; meant to be made by a partner (open_pdk_foundry). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Naphtha (material): Distil naphtha from crude oil, bought. 112 runs per CRE8 large van with its upfit; described.NaphthaCopper concentrate (material): Crush, grind and float copper ore, bought. 67.1 runs per CRE8 large van with its upfit; described.Copper concentrateCRE8 E1 engine controller wafer, passivation and pads (part): Passivation and pads, bought; meant to be made by a partner (open_pdk_foundry). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Coke (material): Bake coal to coke, bought. 585 runs per CRE8 large van with its upfit; described.CokeIron ore (raw): 2080 kg per CRE8 large van with its upfit; mined: hematite ore, about 62 % Fe.Iron oreCaustic soda (material): Electrolyse brine for caustic soda, bought. 20.7 runs per CRE8 large van with its upfit; described.Caustic sodaCoal-tar pitch (material): Distil pitch from coke-oven tar, bought. 8.89 runs per CRE8 large van with its upfit; described.Coal-tar pitchBenzene (material): Steam-crack naphtha for benzene, bought. 38.2 runs per CRE8 large van with its upfit; described.BenzeneBauxite (raw): 619 kg per CRE8 large van with its upfit; mined: gibbsite bauxite.BauxiteSilica sand (raw): 44 kg per CRE8 large van with its upfit; quarried: glass-grade silica sand.Silica sandCalcined petroleum coke (material): Coke the residue and calcine it, bought. 48.5 runs per CRE8 large van with its upfit; described.Calcined petroleum co…Limestone (raw): 350 kg per CRE8 large van with its upfit; quarried: limestone.LimestoneKaolin (raw): 12.7 kg per CRE8 large van with its upfit; quarried: kaolin clay.KaolinColemanite (raw): 2.59 kg per CRE8 large van with its upfit; mined: colemanite borate ore.ColemanitePropylene (material): Steam-crack naphtha for propylene, bought. 28.2 runs per CRE8 large van with its upfit; described.PropyleneCopper cathode (material): Smelt, convert and electrorefine copper, bought. 18.1 runs per CRE8 large van with its upfit; described.Copper cathodeBromide brine (raw): 0.264 kg per CRE8 large van with its upfit; pumped: bromide-rich brine.Bromide brineCRE8 E1 engine controller wafer, probed (part): Probe every die on the wafer, bought; meant to be made by a partner (wafer_probe). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Zinc ore (raw): 10.6 kg per CRE8 large van with its upfit; mined: sphalerite ore, about 8 % Zn.Zinc oreSteel scrap (recovered): 494 kg per CRE8 large van with its upfit; collected: sorted steel scrap.Steel scrapPig iron (material): Reduce iron ore in a blast furnace, bought. 1300 runs per CRE8 large van with its upfit; described.Pig ironCarbon anode (material): Mix, press and bake the anode, bought. 55.6 runs per CRE8 large van with its upfit; described.Carbon anodeAlumina (material): Refine bauxite to alumina, bought. 258 runs per CRE8 large van with its upfit; described.AluminaE-glass cloth (material): Melt, draw and weave E-glass, bought. 0.121 runs per CRE8 large van with its upfit; described.E-glass clothBrominated epoxy and hardener (material): Make brominated epoxy, bought. 0.088 runs per CRE8 large van with its upfit; described.Brominated epoxy and …Copper foil, 35 µm (material): Electrodeposit copper foil, bought. 0.0176 runs per CRE8 large van with its upfit; described.Copper foil, 35 µmPine oleoresin (raw): 0.00106 kg per CRE8 large van with its upfit; grown: tapped pine oleoresin.Pine oleoresinTin ore (raw): 1.72 kg per CRE8 large van with its upfit; mined: cassiterite ore, about 1 % Sn.Tin oreCopper strip (material): Cast and roll copper strip, bought. 0.00975 runs per CRE8 large van with its upfit; described.Copper stripEpoxy mould compound (opaque): 0.007 kg per CRE8 large van with its upfit; silica-filled epoxy; formulation not disclosed.Epoxy mould compoundCRE8 E1 engine controller die (part): Saw the wafer into die, bought; meant to be made by a partner (chip_packaging). 0.0000674 runs per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Zinc (material): Concentrate, roast, leach and electrowin zinc, bought. 0.754 runs per CRE8 large van with its upfit; described.ZincButadiene (material): Steam-crack naphtha for butadiene, bought. 26.1 runs per CRE8 large van with its upfit; described.ButadieneSulfur (recovered): 1.57 kg per CRE8 large van with its upfit; recovered: Claus plants on sour natural gas and refinery gas.SulfurCarbon steel (material): Blow pig iron to steel, bought. 1530 runs per CRE8 large van with its upfit; described.Carbon steelTrivalent chromium passivate (opaque): 0.0237 kg per CRE8 large van with its upfit; the passivate chemistry is the plater's own.Trivalent chromium pa…Primary aluminium (material): Smelt alumina to aluminium, bought. 132 runs per CRE8 large van with its upfit; described.Primary aluminiumAluminium scrap (recovered): 52.9 kg per CRE8 large van with its upfit; collected: sorted aluminium scrap and turnings.Aluminium scrapAmmonia (material): Make ammonia from natural gas, bought. 12.8 runs per CRE8 large van with its upfit; described.AmmoniaFR-4 laminate (material): Impregnate and press FR-4, bought. 0.22 runs per CRE8 large van with its upfit; described.FR-4 laminateBoard etchants, plating and solder mask (opaque): 0.11 kg per CRE8 large van with its upfit; etch, plating and mask chemistry; not disclosed.Board etchants, plati…Solder flux (material): Make no-clean rosin flux, bought. 0.00176 runs per CRE8 large van with its upfit; described.Solder fluxSilver (recovered): 0.000432 kg per CRE8 large van with its upfit; recovered: refinery slimes from copper and lead refining.SilverTin (material): Concentrate and smelt tin, bought. 0.0138 runs per CRE8 large van with its upfit; described.TinInjector and actuator driver die (part): Fabricate Injector and actuator driver dies, bought; meant to be made by a partner (open_pdk_foundry). 0.003 runs per CRE8 large van with its upfit; described.Injector and actuator…CRE8 E1 engine controller in its package (part): Package in LQFP-44, 10 mm, bought; meant to be made by a partner (chip_packaging). 1 run per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Steel rod (material): Roll steel rod, bought. 291 runs per CRE8 large van with its upfit; described.Steel rodZinc plating (material): Zinc-plate and passivate, bought. 0.475 runs per CRE8 large van with its upfit; described.Zinc platingSoda ash (material): Make soda ash by the Solvay process, bought. 8.62 runs per CRE8 large van with its upfit; described.Soda ashEthylene (material): Steam-crack naphtha for ethylene, bought. 5.11 runs per CRE8 large van with its upfit; described.EthyleneNylon 66 (material): Make nylon 66 salt and polymerise it, bought. 42.4 runs per CRE8 large van with its upfit; described.Nylon 66Sulfuric acid (material): Burn sulfur to sulfuric acid, bought. 3.54 runs per CRE8 large van with its upfit; described.Sulfuric acidAluminium alloy (material): Remelt and alloy aluminium, bought. 176 runs per CRE8 large van with its upfit; described.Aluminium alloyChopped glass fibre (material): Melt, draw and chop E-glass, bought. 18.3 runs per CRE8 large van with its upfit; described.Chopped glass fibreGlass cullet (recovered): 8.12 kg per CRE8 large van with its upfit; collected: clean broken float glass.Glass culletMethanol (material): Reform natural gas to methanol, bought. 5.14 runs per CRE8 large van with its upfit; described.MethanolSAC305 solder paste (material): Alloy, atomize and blend solder paste, bought. 0.016 runs per CRE8 large van with its upfit; described.SAC305 solder pasteChip resistors and capacitors (opaque): 732 piece per CRE8 large van with its upfit; ceramic, nickel, tin and resistive films; not drawn yet.Chip resistors and ca…ECU board (part): Fabricate the ECU board, made by a partner (pcb_fab). 1 run per CRE8 large van with its upfit; described.ECU boardInjector and actuator driver (component): Package Injector and actuator driver, bought; meant to be made by a partner (chip_packaging). 6 runs per CRE8 large van with its upfit; described.Injector and actuator…CRE8 E1 engine controller (component): Final test, bought; meant to be made here on chip_tester. 1 run per CRE8 large van with its upfit; described.CRE8 E1 engine contro…Styrene (material): Alkylate benzene and dehydrogenate, bought. 2.69 runs per CRE8 large van with its upfit; described.StyrenePrecipitated silica (material): Precipitate silica from water glass, bought. 2.02 runs per CRE8 large van with its upfit; described.Precipitated silicaHeavy aromatic oil (material): Take the heavy aromatic cut from crude, bought. 21.2 runs per CRE8 large van with its upfit; described.Heavy aromatic oilSteel strip (material): Roll steel strip, bought. 1130 runs per CRE8 large van with its upfit; described.Steel stripMachine screws, nuts and washers (material): Head, roll and plate fasteners, bought. 47.5 runs per CRE8 large van with its upfit; described.Machine screws, nuts …Chromite (raw): 0.885 kg per CRE8 large van with its upfit; mined: chromite ore.ChromiteNickel ore (raw): 66.7 kg per CRE8 large van with its upfit; mined: laterite ore, about 1.5 % Ni.Nickel orePVC resin (material): Make vinyl chloride and polymerise it, bought. 5.09 runs per CRE8 large van with its upfit; described.PVC resinMoulded housing plastic (material): Compound glass-filled nylon, bought. 57.3 runs per CRE8 large van with its upfit; described.Moulded housing plast…Phthalate plasticiser (material): Esterify phthalic anhydride with oxo alcohol, bought. 2.54 runs per CRE8 large van with its upfit; described.Phthalate plasticiserFloat glass (material): Melt and float glass, bought. 40.6 runs per CRE8 large van with its upfit; described.Float glassModule microcontroller die (part): Fabricate Module microcontroller dies, bought; meant to be made by a partner (open_pdk_foundry). 0.0133 runs per CRE8 large van with its upfit; described.Module microcontrolle…ECU case (part): Cast the ECU case, bought; meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.ECU caseConformal coating (material): Make acrylic conformal coating, bought. 0.01 runs per CRE8 large van with its upfit; described.Conformal coatingPopulated ECU board (component): Populate the Populated ECU board, made by a partner (pcb_assembly); meant to be made here on smt_line. 1 run per CRE8 large van with its upfit; described.Populated ECU boardSealed ECU connector (opaque): 1 piece per CRE8 large van with its upfit; the sealed connector's moulding and contact plating are the maker's.Sealed ECU connectorSynthetic rubber (material): Polymerise styrene-butadiene rubber, bought. 10.8 runs per CRE8 large van with its upfit; described.Synthetic rubberNatural rubber (raw): 16.8 kg per CRE8 large van with its upfit; grown: tapped latex from Hevea brasiliensis, dried.Natural rubberOils, silica and curatives (material): Blend process oil, silica and curatives, bought. 5.04 runs per CRE8 large van with its upfit; described.Oils, silica and cura…Carbon black (material): Burn heavy oil to carbon black, bought. 10.5 runs per CRE8 large van with its upfit; described.Carbon blackFerrosilicon inoculant (material): Smelt ferrosilicon, bought. 2.22 runs per CRE8 large van with its upfit; described.Ferrosilicon inoculantFerrochrome (material): Smelt chromite to ferrochrome, bought. 0.354 runs per CRE8 large van with its upfit; described.FerrochromeMolybdenum, niobium, aluminium and titanium (opaque): 0.126 kg per CRE8 large van with its upfit; the minor alloying elements of a turbine wheel; their chains are not drawn.Molybdenum, niobium, …Phenolic resin (material): Make phenol-formaldehyde resin, bought. 8.78 runs per CRE8 large van with its upfit; described.Phenolic resinNickel (material): Leach and refine nickel, bought. 0.834 runs per CRE8 large van with its upfit; described.NickelMagnet wire enamel (material): Make polyester-imide wire enamel, bought. 0.162 runs per CRE8 large van with its upfit; described.Magnet wire enamelPVC insulation compound (material): Compound flexible PVC, bought. 8.48 runs per CRE8 large van with its upfit; described.PVC insulation compou…Birch logs (raw): 241 kg per CRE8 large van with its upfit; grown: birch roundwood, felled.Birch logsFloor pan (part): Stamp the floor pan, bought (a body press shop); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Floor panRoof panel (part): Stamp the roof panel, bought (a body press shop); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Roof panelSide outer (part): Stamp the side outer, bought (a body press shop); meant to be made here on press_line. 2 runs per CRE8 large van with its upfit; described.Side outerBonnet, wings and front panel (part): Stamp the bonnet, wings and front panel, bought (a body press shop); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Bonnet, wings and fro…Pillars, rails and reinforcements (part): Stamp the pillars, rails and reinforcements, bought (a body press shop); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Pillars, rails and re…Door (part): Make the door, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.DoorDoor (part): Make the door, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.DoorDoor (part): Make the door, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.DoorDoor (part): Make the door, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.DoorIlmenite (raw): 7.42 kg per CRE8 large van with its upfit; mined: ilmenite sand, about 50 % TiO2.IlmeniteModule bare board (part): Fabricate the Module bare board, bought. 4 runs per CRE8 large van with its upfit; described.Module bare boardModule microcontroller (component): Package Module microcontroller, bought; meant to be made by a partner (chip_packaging). 8 runs per CRE8 large van with its upfit; described.Module microcontrollerECU before flashing (assembly): Assemble the ECU, made here on ecu_bench. 1 run per CRE8 large van with its upfit; open.ECU before flashingMDI isocyanate (material): Make aniline and phosgenate it to MDI, bought. 4.64 runs per CRE8 large van with its upfit; described.MDI isocyanatePolyether polyol (material): Make propylene oxide and polyol, bought. 7.19 runs per CRE8 large van with its upfit; described.Polyether polyolBarite (raw): 0.421 kg per CRE8 large van with its upfit; mined: barite.BariteTyre rubber compound (material): Mix tyre rubber, bought. 42 runs per CRE8 large van with its upfit; described.Tyre rubber compoundGrey cast iron (material): Melt grey iron, bought. 111 runs per CRE8 large van with its upfit; described.Grey cast ironPolyester (PET) (material): Make terephthalic acid and polymerise PET, bought. 6.86 runs per CRE8 large van with its upfit; described.Polyester (PET)Cellulose filter media (material): Pulp, form and resin-bond filter paper, bought. 0.79 runs per CRE8 large van with its upfit; described.Cellulose filter mediaNickel superalloy (material): Vacuum-melt nickel superalloy, bought. 1.26 runs per CRE8 large van with its upfit; described.Nickel superalloyEnamelled magnet wire (material): Cast rod, draw and enamel magnet wire, bought. 5.39 runs per CRE8 large van with its upfit; described.Enamelled magnet wireSensing element (opaque): 28 piece per CRE8 large van with its upfit; the element (a Hall chip, thermistor, piezo or zirconia cell) and its calibration are the maker's.Sensing elementPlatinum-group ore (raw): 826 kg per CRE8 large van with its upfit; mined: reef ore, about 4 g/t platinum-group metals.Platinum-group oreTalc (raw): 5.11 kg per CRE8 large van with its upfit; mined: talc.TalcElectrical steel (material): Alloy and roll electrical steel, bought. 6.32 runs per CRE8 large van with its upfit; described.Electrical steelHookup wire (material): Draw, strand and insulate hookup wire, bought. 21.2 runs per CRE8 large van with its upfit; described.Hookup wireStamped panels (part): Kit the stamped panels, bought (the vehicle's maker); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Stamped panelsLatches parts (assembly): Gather the latches parts, bought (the vehicle's maker); meant to be made here on body_line. 1 run per CRE8 large van with its upfit; described.Latches partsColoured and effect pigments (opaque): 0.707 kg per CRE8 large van with its upfit; the colour and metallic flake of a paint maker's shade are its own.Coloured and effect p…Titanium dioxide (material): Chlorinate ilmenite slag to titanium dioxide, bought. 3.53 runs per CRE8 large van with its upfit; described.Titanium dioxideGas generant (opaque): 0.334 kg per CRE8 large van with its upfit; the inflator's gas generant and its initiator are the maker's.Gas generantPVB interlayer (material): Make polyvinyl butyral film, bought. 1.37 runs per CRE8 large van with its upfit; described.PVB interlayerModule control board (component): Populate the Module control board, bought. 4 runs per CRE8 large van with its upfit; described.Module control boardFlashed ECU (assembly): Flash the calibration, made here on ecu_flash_station. 1 run per CRE8 large van with its upfit; open.Flashed ECULED emitters (opaque): 4 piece per CRE8 large van with its upfit; the LED dies and their phosphor are the maker's.LED emittersPolycarbonate (material): Make bisphenol A and polycarbonate, bought. 4.57 runs per CRE8 large van with its upfit; described.PolycarbonatePolyurethane foam (material): Mould polyurethane foam, bought. 11.6 runs per CRE8 large van with its upfit; described.Polyurethane foamBrake friction compound (material): Mix the friction compound, bought. 1.69 runs per CRE8 large van with its upfit; described.Brake friction compou…Exhaust manifold (part): Make the exhaust manifold, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Exhaust manifoldOil pan (part): Make the oil pan, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Oil panOil filter (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Oil filterOil pump (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Oil pumpOil pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Oil pressure sensorConnecting rod (part): Make the connecting rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Connecting rodConnecting rod (part): Make the connecting rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Connecting rodConnecting rod (part): Make the connecting rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Connecting rodConnecting rod (part): Make the connecting rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Connecting rodTiming drive (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Timing driveCrankshaft (part): Make the crankshaft, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.CrankshaftCamshaft (part): Make the camshaft, bought (a parts supplier); meant to be made here on cnc_machining_cell. 1 run per CRE8 large van with its upfit; described.CamshaftCamshaft (part): Make the camshaft, bought (a parts supplier); meant to be made here on cnc_machining_cell. 1 run per CRE8 large van with its upfit; described.CamshaftEngine block (part): Make the engine block, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Engine blockPiston (part): Make the piston, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.PistonPiston (part): Make the piston, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.PistonPiston (part): Make the piston, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.PistonPiston (part): Make the piston, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.PistonCylinder head (part): Make the cylinder head, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Cylinder headEGR valve (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.EGR valveCrankshaft position sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Crankshaft position s…Camshaft position sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Camshaft position sen…Camshaft position sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Camshaft position sen…Torque converter (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Torque converterGearbox (part): Make the gearbox, bought (a parts supplier); meant to be made here on cnc_machining_cell. 1 run per CRE8 large van with its upfit; described.GearboxThermostat (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.ThermostatWater pump (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Water pumpGearbox fluid temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Gearbox fluid tempera…Gearbox speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Gearbox speed sensorGearbox speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Gearbox speed sensorCoolant temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Coolant temperature s…A/C compressor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.A/C compressorTurbocharger (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.TurbochargerStarter motor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Starter motorAlternator (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.AlternatorIntercooler (part): Make the intercooler, bought (a parts supplier); meant to be made here on brazing_furnace. 1 run per CRE8 large van with its upfit; described.IntercoolerManifold pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Manifold pressure sen…Intake air temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Intake air temperatur…Intake manifold (part): Make the intake manifold, bought (a parts supplier); meant to be made here on injection_moulder. 1 run per CRE8 large van with its upfit; described.Intake manifoldFuel rail pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel rail pressure se…High-pressure pump (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.High-pressure pumpFuel injector (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel injectorFuel injector (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel injectorFuel injector (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel injectorFuel injector (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel injectorGlow plug (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Glow plugGlow plug (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Glow plugGlow plug (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Glow plugGlow plug (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Glow plugPlatinum-group metals (material): Concentrate, smelt and refine platinum-group metals, bought. 0.00281 runs per CRE8 large van with its upfit; described.Platinum-group metalsCordierite substrate (material): Extrude and fire a cordierite honeycomb, bought. 12.2 runs per CRE8 large van with its upfit; described.Cordierite substrateCopper zeolite coat (opaque): 0.669 kg per CRE8 large van with its upfit; the copper-exchanged zeolite of the SCR coat; its chain is not drawn.Copper zeolite coatPolypropylene (material): Polymerise propylene, bought. 9.05 runs per CRE8 large van with its upfit; described.PolypropyleneSteering column (part): Make the steering column, bought (a parts supplier); meant to be made here on cnc_machining_cell. 1 run per CRE8 large van with its upfit; described.Steering columnSteering wheel (part): Make the steering wheel, bought (a parts supplier); meant to be made here on injection_moulder. 1 run per CRE8 large van with its upfit; described.Steering wheelBody in white (assembly): Weld the body, bought (the vehicle's maker); meant to be made here on body_line. 1 run per CRE8 large van with its upfit; described.Body in whiteE-coat, primer, base and clear (material): Make the paint system, bought. 23.6 runs per CRE8 large van with its upfit; described.E-coat, primer, base …Seat belt (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Seat beltSeat belt (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Seat beltAir bag (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Air bagAir bag (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Air bagAccelerator pedal sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Accelerator pedal sen…Heater core (part): Make the heater core, bought (a parts supplier); meant to be made here on brazing_furnace. 1 run per CRE8 large van with its upfit; described.Heater coreBlower motor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Blower motorEvaporator (part): Make the evaporator, bought (a parts supplier); meant to be made here on brazing_furnace. 1 run per CRE8 large van with its upfit; described.EvaporatorAmbient air temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Ambient air temperatu…Wiper (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.WiperWiper (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.WiperWindshield (part): Make the windshield, bought (a parts supplier); meant to be made here on glass_line. 1 run per CRE8 large van with its upfit; described.WindshieldSide mirror (part): Make the side mirror, bought (a parts supplier); meant to be made here on injection_moulder. 1 run per CRE8 large van with its upfit; described.Side mirrorSide mirror (part): Make the side mirror, bought (a parts supplier); meant to be made here on injection_moulder. 1 run per CRE8 large van with its upfit; described.Side mirrorEngine control module (component): Test the ECU, made here on ecu_test_rig. 1 run per CRE8 large van with its upfit; open.Engine control moduleBody control module (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Body control moduleTransmission control module (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Transmission control …Tail lamp (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tail lampHeadlamp (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.HeadlampTail lamp (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tail lampHeadlamp (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.HeadlampMain wiring harness (part): Make the main wiring harness, bought (a parts supplier); meant to be made here on wire_harness_bench. 1 run per CRE8 large van with its upfit; described.Main wiring harnessInstrument cluster (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Instrument clusterLead ore (raw): 118 kg per CRE8 large van with its upfit; mined: galena ore, about 5 % Pb.Lead oreBattery lead scrap (recovered): 8.49 kg per CRE8 large van with its upfit; collected: spent lead-acid batteries.Battery lead scrapTyre cord (material): Spin, twist and dip tyre cord, bought. 2.53 runs per CRE8 large van with its upfit; described.Tyre cordSeat foam and cover (material): Mould the pads and sew the covers, bought. 15.5 runs per CRE8 large van with its upfit; described.Seat foam and coverMuffler (part): Make the muffler, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.MufflerAxle beam (part): Make the axle beam, bought (a parts supplier); meant to be made here on welding_cell. 1 run per CRE8 large van with its upfit; described.Axle beamLeaf spring pack (part): Make the leaf spring pack, bought (a parts supplier); meant to be made here on spring_line. 1 run per CRE8 large van with its upfit; described.Leaf spring packLeaf spring pack (part): Make the leaf spring pack, bought (a parts supplier); meant to be made here on spring_line. 1 run per CRE8 large van with its upfit; described.Leaf spring packControl arm (part): Make the control arm, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Control armControl arm (part): Make the control arm, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.Control armDamper (part): Make the damper, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.DamperDamper (part): Make the damper, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.DamperStrut (part): Make the strut, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.StrutStrut (part): Make the strut, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.StrutHub bearing (part): Make the hub bearing, bought (a parts supplier); meant to be made here on bearing_line. 1 run per CRE8 large van with its upfit; described.Hub bearingHub bearing (part): Make the hub bearing, bought (a parts supplier); meant to be made here on bearing_line. 1 run per CRE8 large van with its upfit; described.Hub bearingStabilizer bar (part): Make the stabilizer bar, bought (a parts supplier); meant to be made here on spring_coiler. 1 run per CRE8 large van with its upfit; described.Stabilizer barHub bearing (part): Make the hub bearing, bought (a parts supplier); meant to be made here on bearing_line. 1 run per CRE8 large van with its upfit; described.Hub bearingHub bearing (part): Make the hub bearing, bought (a parts supplier); meant to be made here on bearing_line. 1 run per CRE8 large van with its upfit; described.Hub bearingParking brake (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Parking brakeTie rod (part): Make the tie rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Tie rodTie rod (part): Make the tie rod, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Tie rodProp shaft (part): Make the prop shaft, bought (a parts supplier); meant to be made here on tube_mill. 1 run per CRE8 large van with its upfit; described.Prop shaftAxle shaft (part): Make the axle shaft, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Axle shaftAxle shaft (part): Make the axle shaft, bought (a parts supplier); meant to be made here on forge_press. 1 run per CRE8 large van with its upfit; described.Axle shaftFinal drive (part): Make the final drive, bought (a parts supplier); meant to be made here on cnc_machining_cell. 1 run per CRE8 large van with its upfit; described.Final driveBrake pad (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Brake padBrake pad (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Brake padBrake pad (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Brake padBrake pad (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Brake padBrake rotor (part): Make the brake rotor, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake rotorBrake caliper (part): Make the brake caliper, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake caliperBrake rotor (part): Make the brake rotor, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake rotorBrake caliper (part): Make the brake caliper, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake caliperBrake rotor (part): Make the brake rotor, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake rotorBrake caliper (part): Make the brake caliper, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake caliperBrake rotor (part): Make the brake rotor, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake rotorBrake caliper (part): Make the brake caliper, bought (a parts supplier); meant to be made here on casting_cell. 1 run per CRE8 large van with its upfit; described.Brake caliperBrake booster (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Brake boosterMaster cylinder (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Master cylinderSteering gear (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Steering gearFuel filter (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel filterFuel pump (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel pumpExhaust parts (assembly): Gather the exhaust parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Exhaust partsLubrication parts (assembly): Gather the lubrication parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Lubrication partsEngine parts (assembly): Gather the engine parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Engine partsEgr parts (assembly): Gather the egr parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Egr partsTransmission parts (assembly): Gather the transmission parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Transmission partsCooling parts (assembly): Gather the cooling parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Cooling partsAc parts (assembly): Gather the ac parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Ac partsCharging parts (assembly): Gather the charging parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Charging partsAir intake parts (assembly): Gather the air intake parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Air intake partsInjection parts (assembly): Gather the injection parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Injection partsIgnition parts (assembly): Gather the ignition parts, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.Ignition partsParticulate filter pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Particulate filter pr…NOx sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.NOx sensorExhaust temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Exhaust temperature s…NOx sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.NOx sensorExhaust temperature sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Exhaust temperature s…Diesel particulate filter (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Diesel particulate fi…SCR catalyst (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.SCR catalystDEF tank (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.DEF tankAir filter (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Air filterMass air flow sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Mass air flow sensorFuel level sender (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Fuel level senderFuel tank (part): Make the fuel tank, bought (a parts supplier); meant to be made here on blow_moulder. 1 run per CRE8 large van with its upfit; described.Fuel tankWheel speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Wheel speed sensorWheel speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Wheel speed sensorWheel speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Wheel speed sensorWheel speed sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Wheel speed sensorABS module (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.ABS moduleColumn parts (assembly): Gather the column parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Column partsPainted body (assembly): Paint the body, bought (the vehicle's maker); meant to be made here on paint_line. 1 run per CRE8 large van with its upfit; described.Painted bodySeat belts parts (assembly): Gather the seat belts parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Seat belts partsAirbags parts (assembly): Gather the airbags parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Airbags partsSpeed control parts (assembly): Gather the speed control parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Speed control partsHeater parts (assembly): Gather the heater parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Heater partsAc parts (assembly): Gather the ac parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Ac partsClimate control parts (assembly): Gather the climate control parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Climate control partsVisibility parts (assembly): Gather the visibility parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Visibility partsControl modules parts (assembly): Gather the control modules parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Control modules partsLighting parts (assembly): Gather the lighting parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Lighting partsWiring parts (assembly): Gather the wiring parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Wiring partsInstruments parts (assembly): Gather the instruments parts, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Instruments partsCooling fan (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Cooling fanRadiator (part): Make the radiator, bought (a parts supplier); meant to be made here on brazing_furnace. 1 run per CRE8 large van with its upfit; described.RadiatorCondenser (part): Make the condenser, bought (a parts supplier); meant to be made here on brazing_furnace. 1 run per CRE8 large van with its upfit; described.CondenserLead alloy (material): Smelt and refine battery lead, bought. 13.1 runs per CRE8 large van with its upfit; described.Lead alloyWheel (part): Make the wheel, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.WheelWheel (part): Make the wheel, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.WheelWheel (part): Make the wheel, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.WheelWheel (part): Make the wheel, bought (a parts supplier); meant to be made here on press_line. 1 run per CRE8 large van with its upfit; described.WheelTyre (part): Make the tyre, bought (a parts supplier); meant to be made here on tyre_building_line. 1 run per CRE8 large van with its upfit; described.TyreTyre (part): Make the tyre, bought (a parts supplier); meant to be made here on tyre_building_line. 1 run per CRE8 large van with its upfit; described.TyreTyre (part): Make the tyre, bought (a parts supplier); meant to be made here on tyre_building_line. 1 run per CRE8 large van with its upfit; described.TyreTyre (part): Make the tyre, bought (a parts supplier); meant to be made here on tyre_building_line. 1 run per CRE8 large van with its upfit; described.TyreSeat (part): Make the seat, bought (a parts supplier); meant to be made here on seat_line. 1 run per CRE8 large van with its upfit; described.SeatSeat (part): Make the seat, bought (a parts supplier); meant to be made here on seat_line. 1 run per CRE8 large van with its upfit; described.SeatExhaust parts (assembly): Gather the exhaust parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Exhaust partsRide control parts (assembly): Gather the ride control parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Ride control partsParking parts (assembly): Gather the parking parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Parking partsLinkage parts (assembly): Gather the linkage parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Linkage partsDriveline parts (assembly): Gather the driveline parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Driveline partsService parts (assembly): Gather the service parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Service partsGear parts (assembly): Gather the gear parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Gear partsDelivery parts (assembly): Gather the delivery parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Delivery partsPowerpack (assembly): Build the powerpack, bought (the vehicle's maker); meant to be made here on powerpack_line. 1 run per CRE8 large van with its upfit; described.PowerpackSensors parts (assembly): Gather the sensors parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Sensors partsAftertreatment parts (assembly): Gather the aftertreatment parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Aftertreatment partsAir intake parts (assembly): Gather the air intake parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Air intake partsStorage parts (assembly): Gather the storage parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Storage partsAbs parts (assembly): Gather the abs parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Abs partsTrimmed body (assembly): Trim the body, bought (the vehicle's maker); meant to be made here on trim_line. 1 run per CRE8 large van with its upfit; described.Trimmed bodyCooling parts (assembly): Gather the cooling parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Cooling partsAc parts (assembly): Gather the ac parts, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Ac partsTyre pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tyre pressure sensorTyre pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tyre pressure sensorTyre pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tyre pressure sensorTyre pressure sensor (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.Tyre pressure sensor12 V battery (component): Made by its supplier, bought (a parts supplier). 1 run per CRE8 large van with its upfit; opaque.12 V batteryWheels parts (assembly): Gather the wheels parts, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Wheels partsTires parts (assembly): Gather the tires parts, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Tires partsSeats parts (assembly): Gather the seats parts, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Seats partsMarried chassis (assembly): Marry and build the chassis, bought (the vehicle's maker); meant to be made here on chassis_line. 1 run per CRE8 large van with its upfit; described.Married chassisTpms parts (assembly): Gather the tpms parts, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Tpms partsBattery parts (assembly): Gather the battery parts, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Battery partsAssembled vehicle (assembly): Final assembly, bought (the vehicle's maker); meant to be made here on final_line. 1 run per CRE8 large van with its upfit; described.Assembled vehicleBirch plywood (material): Peel, dry, glue and press birch plywood, bought. 104 runs per CRE8 large van with its upfit; described.Birch plywoodAluminium plate (material): Roll aluminium plate, bought. 14 runs per CRE8 large van with its upfit; described.Aluminium plateCab bulkhead (part): Cut the cab bulkhead, bought (an upfitter); meant to be made here on press_brake. 1 run per CRE8 large van with its upfit; described.Cab bulkheadCRE8 large van (assembly): Test the vehicle, bought (the vehicle's maker); meant to be made here on test_line. 1 run per CRE8 large van with its upfit; described.CRE8 large vanCargo floor (part): Cut the cargo floor, bought (an upfitter); meant to be made here on cnc_router. 1 run per CRE8 large van with its upfit; described.Cargo floorWall liners (part): Cut the wall liners, bought (an upfitter); meant to be made here on cnc_router. 1 run per CRE8 large van with its upfit; described.Wall linersTie-down rails (part): Cut the tie-down rails, bought (an upfitter); meant to be made here on press_brake. 1 run per CRE8 large van with its upfit; described.Tie-down railsWall and roof insulation (opaque): 1 piece per CRE8 large van with its upfit; closed-cell foam board, bought; its chemistry is the maker's.Wall and roof insulat…Cargo lights (opaque): 1 piece per CRE8 large van with its upfit; LED fittings, bought finished; the board and driver are the maker's.Cargo lightsCRE8 large van with its upfit (product): Fit out the cargo area, bought (an upfitter); meant to be made here on upfit_bay. 1 run per CRE8 large van with its upfit; described.CRE8 large van with i…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Assumptions

Work times are assumed allowances for a mixed line, not measured in any plant. Standard chains use typical published yields and loadings, rounded; none is measured on a line this network runs. Body steel, fasteners and paint are typical shares of the vehicle's mass and box, not this vehicle's bill. Every line is drawn as a welded body; a body on a separate frame is not told apart yet. A part's mass is an assumed allowance for its class, scaled by the vehicle's curb mass against 2,000 kg, unless a source states it. A made part's material split and scrap allowance are typical for its class, not taken from this vehicle's drawings. Panel gauges, the cut-outs in each skin, the inner structure's share and the blank yield are typical for a steel van body, not this van's drawings. Upfit sheet thicknesses, densities and cut waste are typical stock figures, not a builder's drawings. Conductors per part are typical: three for a sensor, four for a module and two for a load. The harness mass stays its class allowance. The ECU's board, case and part counts are typical for an engine control unit, not taken from a drawing. Each chip's transistor budget is assumed until its synthesized cell count replaces it. The die is calculated from the budget, the pin count and the twin's sizing figures at 130 nm; the defect density is assumed. Nothing was fabricated. Chains behind bought chemicals and plastics use typical published loadings, rounded. A refinery or cracker product takes in its own mass of feed plus a typical loss (mass allocation); the other products carry the rest. Air, water and energy are not counted. A bought part's materials are a typical teardown of its class, by share of its assumed mass, not this supplier's drawing. The supplier's own step stays undisclosed.

See the line in Virtual