Medium methalox lifter: the first stack worth flying for cargo

Figures are model estimates, not test data. Nothing on these pages has been built or fired, and none of it is a design to build from.Paper only and expendable: no stage comes back. The flight is a two-dimensional point mass with no margin held back, and it burns straight to orbit with no coast. A second ascent in Virtual, with a coast and an open pitch program, disagrees by tens of percent in both directions, so read a payload as a bracket, not a figure.
Routes to orbitMoon engines
Payload flown
15 t
Orbit
300 km at 28.5°
Liftoff mass
334 t
Thrust to weight at the pad
1.68
Height, no fairing
28.6 m

Size and fly

The stack

To one scale. Tanks and engine bay, with a drawn nose left out of each height; no interstage
First stageUpper stage
Forge28.6 m

Stages

StageEnginesVacuum kNVacuum sPropellantDryØ mΔv m/sWhat the stage gives with everything above it on board.Burn s
Forge booster5 × Oxygen-rich staged, Liquid methane, 200 bar5,995344.9234 t14 t4.54,096132
Forge upper1 × Oxygen-rich staged, Liquid methane, 200 bar1,10036465 t3,657 kg4.55,206213
2 rows

The flightPaper only and expendable: no stage comes back. The flight is a two-dimensional point mass with no margin held back, and it burns straight to orbit with no coast. A second ascent in Virtual, with a coast and an open pitch program, disagrees by tens of percent in both directions, so read a payload as a bracket, not a figure.

Apoapsis
300.5 km
Periapsis
292.4 km
Time to orbit
357 s
Gravity loss
1,084 m/s
Drag loss
48 m/s
Steering loss
710 m/s
Peak dynamic pressure
33 kPa
Peak acceleration
4.5 g
Events
t, sEventkmm/s
3Liftoff0408
58Max Q11.1728
141Forge booster out833,169
160Fairing away1113,284
357Parked3007,728
5 rows

Speed through the flight

Speed, m/s
020004000600080000100200300Time, s0 Time, s · Speed 408.34 Time, s · Speed 408.38 Time, s · Speed 409.812 Time, s · Speed 414.916 Time, s · Speed 426.720 Time, s · Speed 445.324 Time, s · Speed 46828 Time, s · Speed 495.532 Time, s · Speed 528.236 Time, s · Speed 561.540 Time, s · Speed 585.844 Time, s · Speed 610.948 Time, s · Speed 639.452 Time, s · Speed 672.356 Time, s · Speed 710.860 Time, s · Speed 762.664 Time, s · Speed 828.168 Time, s · Speed 90072 Time, s · Speed 97776 Time, s · Speed 105980 Time, s · Speed 114684 Time, s · Speed 123988 Time, s · Speed 133792 Time, s · Speed 144196 Time, s · Speed 1551100 Time, s · Speed 1668104 Time, s · Speed 1790108 Time, s · Speed 1920112 Time, s · Speed 2058116 Time, s · Speed 2204120 Time, s · Speed 2358124 Time, s · Speed 2515128 Time, s · Speed 2673132 Time, s · Speed 2831136 Time, s · Speed 2989140 Time, s · Speed 3147144 Time, s · Speed 3154148 Time, s · Speed 3181152 Time, s · Speed 3214156 Time, s · Speed 3248160 Time, s · Speed 3284164 Time, s · Speed 3322168 Time, s · Speed 3362172 Time, s · Speed 3404176 Time, s · Speed 3447180 Time, s · Speed 3491184 Time, s · Speed 3537188 Time, s · Speed 3584192 Time, s · Speed 3632196 Time, s · Speed 3682200 Time, s · Speed 3733204 Time, s · Speed 3785208 Time, s · Speed 3839212 Time, s · Speed 3894216 Time, s · Speed 3951220 Time, s · Speed 4010224 Time, s · Speed 4070228 Time, s · Speed 4131232 Time, s · Speed 4195236 Time, s · Speed 4260240 Time, s · Speed 4327244 Time, s · Speed 4396248 Time, s · Speed 4467252 Time, s · Speed 4540256 Time, s · Speed 4615260 Time, s · Speed 4692264 Time, s · Speed 4772268 Time, s · Speed 4855272 Time, s · Speed 4940276 Time, s · Speed 5028280 Time, s · Speed 5119284 Time, s · Speed 5213288 Time, s · Speed 5311292 Time, s · Speed 5412296 Time, s · Speed 5517300 Time, s · Speed 5626304 Time, s · Speed 5739308 Time, s · Speed 5857312 Time, s · Speed 5980316 Time, s · Speed 6109320 Time, s · Speed 6243324 Time, s · Speed 6384328 Time, s · Speed 6532332 Time, s · Speed 6687336 Time, s · Speed 6851340 Time, s · Speed 7018344 Time, s · Speed 7184348 Time, s · Speed 7350352 Time, s · Speed 7517356 Time, s · Speed 7691
Readings
Time, sSpeed
0408.3
14419.9
28495.5
42598
56710.8
70937.9
841239
981609
1122058
1262594
1403147
1543231
1683362
1823514
1963682
2103866
2244070
2384293
2524540
2664813
2805119
2945464
3085857
3226313
3366851
3507432
26 rows

Height through the flight

Height, km
01002003004000100200300Time, s0 Time, s · Height 04 Time, s · Height 0.0034548 Time, s · Height 0.0878712 Time, s · Height 0.289816 Time, s · Height 0.615420 Time, s · Height 1.0724 Time, s · Height 1.65928 Time, s · Height 2.38932 Time, s · Height 3.26636 Time, s · Height 4.29140 Time, s · Height 5.41144 Time, s · Height 6.59448 Time, s · Height 7.8452 Time, s · Height 9.15556 Time, s · Height 10.5560 Time, s · Height 12.0464 Time, s · Height 13.6868 Time, s · Height 15.4972 Time, s · Height 17.4776 Time, s · Height 19.6380 Time, s · Height 21.9684 Time, s · Height 24.4788 Time, s · Height 27.1892 Time, s · Height 30.0796 Time, s · Height 33.16100 Time, s · Height 36.46104 Time, s · Height 39.96108 Time, s · Height 43.69112 Time, s · Height 47.64116 Time, s · Height 51.83120 Time, s · Height 56.27124 Time, s · Height 60.96128 Time, s · Height 65.91132 Time, s · Height 71.11136 Time, s · Height 76.54140 Time, s · Height 82.22144 Time, s · Height 88.06148 Time, s · Height 93.77152 Time, s · Height 99.5156 Time, s · Height 105.2160 Time, s · Height 111164 Time, s · Height 116.8168 Time, s · Height 122.5172 Time, s · Height 128.3176 Time, s · Height 134.1180 Time, s · Height 139.8184 Time, s · Height 145.5188 Time, s · Height 151.2192 Time, s · Height 156.9196 Time, s · Height 162.5200 Time, s · Height 168.1204 Time, s · Height 173.7208 Time, s · Height 179.2212 Time, s · Height 184.6216 Time, s · Height 190220 Time, s · Height 195.3224 Time, s · Height 200.6228 Time, s · Height 205.7232 Time, s · Height 210.8236 Time, s · Height 215.8240 Time, s · Height 220.7244 Time, s · Height 225.5248 Time, s · Height 230.2252 Time, s · Height 234.8256 Time, s · Height 239.3260 Time, s · Height 243.7264 Time, s · Height 247.9268 Time, s · Height 252.1272 Time, s · Height 256276 Time, s · Height 259.9280 Time, s · Height 263.6284 Time, s · Height 267.1288 Time, s · Height 270.6292 Time, s · Height 273.8296 Time, s · Height 276.9300 Time, s · Height 279.8304 Time, s · Height 282.5308 Time, s · Height 285.1312 Time, s · Height 287.5316 Time, s · Height 289.6320 Time, s · Height 291.6324 Time, s · Height 293.4328 Time, s · Height 295332 Time, s · Height 296.4336 Time, s · Height 297.6340 Time, s · Height 298.5344 Time, s · Height 299.2348 Time, s · Height 299.7352 Time, s · Height 300356 Time, s · Height 300
Readings
Time, sHeight
00
140.4368
282.389
425.995
5610.55
7016.46
8424.47
9834.78
11247.64
12663.41
14082.22
154102.4
168122.5
182142.7
196162.5
210181.9
224200.6
238218.3
252234.8
266250
280263.6
294275.4
308285.1
322292.6
336297.6
350299.9
26 rows

SolidTanks are sized to the propellant they carry, with 2:1 domes. Skirts, intertanks, interstages and the fairing are envelopes placed by rule. Engines are drawn by their outer form, not their metal.

Cut away

17196 triangles, shaded from the parts' own normals. 3D starts when Virtual's renderer loads.

Fits
FitsPartNote
FitsBooster engines under the stage5 bells of 1.12 m reach 1.58 m against a 2.25 m stage radius
FitsUpper engines under the stage1 bell of 1.99 m reach 1.00 m against a 2.25 m stage radius
2 rows

DrawingThe sheet's balloons and the stage's labels name the same parts.

FORGE BOOSTERFORGE UPPERHALF SECTION ABOVE, EXTERIOR BELOWPartForge booster: 5 enginesForge booster: aft skirtForge booster: Liquid methane tank, 131.1 m³Forge booster: intertankForge booster: Liquid oxygen tank, 165.1 m³Forge booster: forward skirtInterstageForge upper: 1 enginesForge upper: Liquid methane tank, 36.6 m³Forge upper: intertankForge upper: Liquid oxygen tank, 46.1 m³Forge upper: forward skirtPayload fairingMaterialNickel alloyCarbon sandwich, bareAluminium-lithiumCarbon sandwich, bareAluminium-lithiumCarbon sandwichCarbon sandwich, bareNickel alloyAluminium-lithiumCarbon sandwich, bareAluminium-lithiumCarbon sandwichCarbon sandwichMass kg1954.0envelope1412.5envelope2328.1envelopeenvelope1134.1483.7envelope598.6envelopeenvelopeCopies5111111111111Dimensions in millimetres. Upper half in section, lower half the exterior.Engines print at the launcher's scale as their outer form, not their metal.Phantom parts are skirts, intertanks and the fairing, proportioned by rule; their mass means nothing.Booster engines under the stage: fits. 5 bells of 1.12 m reach 1.58 m against a 2.25 m stage radiusUpper engines under the stage: fits. 1 bell of 1.99 m reach 1.00 m against a 2.25 m stage radiusA design report, not a release for manufacture.22167.93450010056.8450042574.73Forge launcher, 2 stagesNUMBERL-101SCALE1:200UNITSmillimetresSHEETL-101 A3DATEDRAWNCRE8 engine designREVAREVISIONfd82ed34CRE8 CAD
A3, scale 1:200, revision fd82ed34: the hash of the drawing's own text.DXF for CAD

How it is made

The Moon chain's make graph, read with this stack's engines, propellants and masses. It still assumes that chain's part shares for every engine, turbopump steps even for electric pumps, liquid oxygen and a 1,500 kg composite fairing.
Coal (raw): 90.2 kg per Vehicle fuelled on the pad; mined: bituminous coal.CoalCopper ore (raw): 110000 kg per Vehicle fuelled on the pad; mined: porphyry copper ore, about 0.6 % Cu.Copper oreIron ore (raw): 247 kg per Vehicle fuelled on the pad; mined: hematite ore, about 62 % Fe.Iron oreCoke (material): Bake coal to coke, bought. 69.4 runs per Vehicle fuelled on the pad; described.CokeLimestone (raw): 38.5 kg per Vehicle fuelled on the pad; quarried: limestone.LimestoneCopper concentrate (material): Crush, grind and float copper ore, bought. 2120 runs per Vehicle fuelled on the pad; described.Copper concentratePig iron (material): Reduce iron ore in a blast furnace, bought. 154 runs per Vehicle fuelled on the pad; described.Pig ironSteel scrap (recovered): 45.3 kg per Vehicle fuelled on the pad; collected: sorted steel scrap.Steel scrapCopper cathode (material): Smelt, convert and electrorefine copper, bought. 572 runs per Vehicle fuelled on the pad; described.Copper cathodeCarbon steel (material): Blow pig iron to steel, bought. 181 runs per Vehicle fuelled on the pad; described.Carbon steelAluminium-lithium plate (opaque): 13000 kg per Vehicle fuelled on the pad; the alloy melt and plate mill are not drawn.Aluminium-lithium pla…Copper alloy powder (material): Atomise copper alloy, bought. 545 runs per Vehicle fuelled on the pad; described.Copper alloy powderInconel powder and billet (opaque): 1270 kg per Vehicle fuelled on the pad; the nickel chain is not drawn.Inconel powder and bi…Steel rod (material): Roll steel rod, bought. 173 runs per Vehicle fuelled on the pad; described.Steel rodZinc plating (opaque): 1.57 kg per Vehicle fuelled on the pad; zinc and passivate chemistry; the zinc's mine is not drawn yet.Zinc platingForge upper tank panels (material): Mill tank panels, made here on panel_mill. 1670 runs per Vehicle fuelled on the pad; described.Forge upper tank pane…Forge upper tank domes (material): Spin form domes, made here on spin_former. 418 runs per Vehicle fuelled on the pad; described.Forge upper tank domesForge upper engine chamber (part): Print chamber and injector, made here on metal_printer. 1 run per Vehicle fuelled on the pad; described.Forge upper engine ch…Forge upper engine turbopump (part): Machine turbopump, made here on turn_mill. 1 run per Vehicle fuelled on the pad; described.Forge upper engine tu…Forge booster tank panels (material): Mill tank panels, made here on panel_mill. 5950 runs per Vehicle fuelled on the pad; described.Forge booster tank pa…Forge booster tank domes (material): Spin form domes, made here on spin_former. 1490 runs per Vehicle fuelled on the pad; described.Forge booster tank do…Forge booster engine chamber (part): Print chamber and injector, made here on metal_printer. 5 runs per Vehicle fuelled on the pad; described.Forge booster engine …Machine screws, nuts and washers (material): Head, roll and plate fasteners, bought. 157 runs per Vehicle fuelled on the pad; described.Machine screws, nuts …Forge booster engine turbopump (part): Machine turbopump, made here on turn_mill. 5 runs per Vehicle fuelled on the pad; described.Forge booster engine …Forge upper tank before proof (material): Friction stir weld tank, made here on stir_welder. 2090 runs per Vehicle fuelled on the pad; described.Forge upper tank befo…Carbon prepreg (opaque): 5580 kg per Vehicle fuelled on the pad; fibre and resin are not drawn.Carbon prepregLiquid methane (opaque): 112000 kg per Vehicle fuelled on the pad; the plant that makes it is not drawn.Liquid methaneForge upper engine before hot fire (assembly): Build engine, made here on engine_bay. 1 run per Vehicle fuelled on the pad; described.Forge upper engine be…Forge booster tank before proof (material): Friction stir weld tank, made here on stir_welder. 7440 runs per Vehicle fuelled on the pad; described.Forge booster tank be…Liquid oxygen at the pad (opaque): 382000 kg per Vehicle fuelled on the pad; air separation not drawn.Liquid oxygen at the …Forge booster engine before hot fire (assembly): Build engine, made here on engine_bay. 5 runs per Vehicle fuelled on the pad; described.Forge booster engine …Forge upper tank (material): Proof test tank, made here on proof_bay. 2090 runs per Vehicle fuelled on the pad; described.Forge upper tankForge upper frame (material): Lay up thrust frame, made here on fibre_cell. 813 runs per Vehicle fuelled on the pad; described.Forge upper frameForge upper engine (assembly): Hot fire, made here on test_stand. 1 run per Vehicle fuelled on the pad; described.Forge upper engineFlight computer and harness (opaque): 2 piece per Vehicle fuelled on the pad; boards, sensors and harness are not drawn for this vehicle.Flight computer and h…Forge booster frame (material): Lay up thrust frame, made here on fibre_cell. 2890 runs per Vehicle fuelled on the pad; described.Forge booster frameForge booster tank (material): Proof test tank, made here on proof_bay. 7440 runs per Vehicle fuelled on the pad; described.Forge booster tankForge booster engine (assembly): Hot fire, made here on test_stand. 5 runs per Vehicle fuelled on the pad; described.Forge booster engineForge upper before static fire (assembly): Assemble stage, made here on stage_bay. 1 run per Vehicle fuelled on the pad; described.Forge upper before st…Forge booster before static fire (assembly): Assemble stage, made here on stage_bay. 1 run per Vehicle fuelled on the pad; described.Forge booster before …Payload fairing (part): Lay up fairing, made here on fibre_cell. 1 run per Vehicle fuelled on the pad; described.Payload fairingForge upper (assembly): Static fire, made here on stage_stand. 1 run per Vehicle fuelled on the pad; described.Forge upperForge booster (assembly): Static fire, made here on stage_stand. 1 run per Vehicle fuelled on the pad; described.Forge boosterStacked vehicle (assembly): Stack the vehicle, made here on integration_hall. 1 run per Vehicle fuelled on the pad; described.Stacked vehicleVehicle fuelled on the pad (product): Fuel on the pad, made here on launch_pad. 1 run per Vehicle fuelled on the pad; described.Vehicle fuelled on th…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

A factory for 10 vehicles in 2 years

Bottleneck
stage bay
Machines
13
Machine cost
$285,550,000
Power
1.08 MW
Floor
61,050 m²
Lead time
58.2 days
Energy per vehicle
100,703 kWh
Machines
MachineUnitsBusy
engine bay114%
fibre cell129%
integration hall117%
launch pad110%
panel mill16%
proof bay12%
quad laser printer141%
spin former12%
stage bay170%
stage stand114%
stir welder15%
test stand16%
turn mill122%
13 rows