Engine
Launcher

Spark

Small orbiter on battery-driven pumps

Figures are model estimates, not test data. Nothing on these pages has been built or fired, and none of it is a design to build from.Paper only and expendable: no stage comes back. The flight is a two-dimensional point mass with no margin held back, and it burns straight to orbit with no coast. A second ascent in Virtual, with a coast and an open pitch program, disagrees by tens of percent in both directions, so read a payload as a bracket, not a figure.
Routes to orbitMoon engines
Payload flown
280 kg
Orbit
300 km at 28.5°
Liftoff mass
20 t
Thrust to weight at the pad
1.4
Height, no fairing
15.5 m

Size and fly

The stack

To one scale. Tanks and engine bay, with a drawn nose left out of each height; no interstage
First stageUpper stage
Spark15.5 m

Stages

StageEnginesVacuum kNVacuum sPropellantDryØ mΔv m/sWhat the stage gives with everything above it on board.Burn s
Spark booster10 × Electric pump, RP-1 kerosene, 100 bar305310.117 t1,457 kg1.35,421169
Spark upper1 × Electric pump, RP-1 kerosene, 100 bar28332.71,410 kg233 kg1.34,111164
2 rows

The flightPaper only and expendable: no stage comes back. The flight is a two-dimensional point mass with no margin held back, and it burns straight to orbit with no coast. A second ascent in Virtual, with a coast and an open pitch program, disagrees by tens of percent in both directions, so read a payload as a bracket, not a figure.

Apoapsis
310.7 km
Periapsis
292.8 km
Time to orbit
348 s
Gravity loss
1,040 m/s
Drag loss
65 m/s
Steering loss
922 m/s
Peak dynamic pressure
33 kPa
Peak acceleration
4.5 g
Events
t, sEventkmm/s
3Liftoff0408
66Max Q11720
176Fairing away1154,011
181Spark booster out1224,194
348Parked3007,731
5 rows

Speed through the flight

Speed, m/s
020004000600080000100200300Time, s0 Time, s · Speed 408.34 Time, s · Speed 408.38 Time, s · Speed 408.812 Time, s · Speed 410.216 Time, s · Speed 413.420 Time, s · Speed 419.824 Time, s · Speed 429.428 Time, s · Speed 441.632 Time, s · Speed 457.436 Time, s · Speed 47740 Time, s · Speed 500.744 Time, s · Speed 528.448 Time, s · Speed 560.152 Time, s · Speed 595.356 Time, s · Speed 630.560 Time, s · Speed 663.864 Time, s · Speed 701.668 Time, s · Speed 748.872 Time, s · Speed 803.476 Time, s · Speed 862.580 Time, s · Speed 926.184 Time, s · Speed 994.588 Time, s · Speed 106892 Time, s · Speed 114696 Time, s · Speed 1229100 Time, s · Speed 1318104 Time, s · Speed 1412108 Time, s · Speed 1512112 Time, s · Speed 1618116 Time, s · Speed 1730120 Time, s · Speed 1849124 Time, s · Speed 1975128 Time, s · Speed 2109132 Time, s · Speed 2251136 Time, s · Speed 2403140 Time, s · Speed 2562144 Time, s · Speed 2721148 Time, s · Speed 2880152 Time, s · Speed 3039156 Time, s · Speed 3199160 Time, s · Speed 3359164 Time, s · Speed 3519168 Time, s · Speed 3680172 Time, s · Speed 3840176 Time, s · Speed 4001180 Time, s · Speed 4162184 Time, s · Speed 4182188 Time, s · Speed 4219192 Time, s · Speed 4264196 Time, s · Speed 4310200 Time, s · Speed 4358204 Time, s · Speed 4406208 Time, s · Speed 4456212 Time, s · Speed 4507216 Time, s · Speed 4560220 Time, s · Speed 4613224 Time, s · Speed 4668228 Time, s · Speed 4725232 Time, s · Speed 4783236 Time, s · Speed 4842240 Time, s · Speed 4903244 Time, s · Speed 4965248 Time, s · Speed 5029252 Time, s · Speed 5095256 Time, s · Speed 5163260 Time, s · Speed 5233264 Time, s · Speed 5305268 Time, s · Speed 5379272 Time, s · Speed 5456276 Time, s · Speed 5536280 Time, s · Speed 5618284 Time, s · Speed 5704288 Time, s · Speed 5792292 Time, s · Speed 5884296 Time, s · Speed 5980300 Time, s · Speed 6080304 Time, s · Speed 6185308 Time, s · Speed 6295312 Time, s · Speed 6409316 Time, s · Speed 6530320 Time, s · Speed 6657324 Time, s · Speed 6790328 Time, s · Speed 6932332 Time, s · Speed 7082336 Time, s · Speed 7240340 Time, s · Speed 7401344 Time, s · Speed 7560
Readings
Time, sSpeed
0408.3
14411.4
28441.6
42514.1
56630.5
70775.6
84994.5
981273
1121618
1262041
1402562
1543119
1683680
1824190
1964310
2104482
2244668
2384872
2525095
2665342
2805618
2945932
3086295
3226723
3367240
25 rows

Height through the flight

Height, km
01002003000100200300Time, s0 Time, s · Height 04 Time, s · Height 0.0020658 Time, s · Height 0.0527912 Time, s · Height 0.17516 Time, s · Height 0.373520 Time, s · Height 0.653324 Time, s · Height 1.0228 Time, s · Height 1.47832 Time, s · Height 2.03236 Time, s · Height 2.68940 Time, s · Height 3.45344 Time, s · Height 4.32748 Time, s · Height 5.31752 Time, s · Height 6.42456 Time, s · Height 7.64560 Time, s · Height 8.95464 Time, s · Height 10.3568 Time, s · Height 11.8472 Time, s · Height 13.4576 Time, s · Height 15.280 Time, s · Height 17.0884 Time, s · Height 19.0988 Time, s · Height 21.2592 Time, s · Height 23.5696 Time, s · Height 26.01100 Time, s · Height 28.61104 Time, s · Height 31.37108 Time, s · Height 34.29112 Time, s · Height 37.38116 Time, s · Height 40.64120 Time, s · Height 44.08124 Time, s · Height 47.7128 Time, s · Height 51.53132 Time, s · Height 55.55136 Time, s · Height 59.8140 Time, s · Height 64.27144 Time, s · Height 68.97148 Time, s · Height 73.89152 Time, s · Height 79.03156 Time, s · Height 84.38160 Time, s · Height 89.94164 Time, s · Height 95.7168 Time, s · Height 101.7172 Time, s · Height 107.8176 Time, s · Height 114.2180 Time, s · Height 120.8184 Time, s · Height 127.5188 Time, s · Height 134.1192 Time, s · Height 140.6196 Time, s · Height 147.1200 Time, s · Height 153.6204 Time, s · Height 160208 Time, s · Height 166.4212 Time, s · Height 172.7216 Time, s · Height 178.9220 Time, s · Height 185224 Time, s · Height 191.1228 Time, s · Height 197.1232 Time, s · Height 203236 Time, s · Height 208.7240 Time, s · Height 214.4244 Time, s · Height 219.9248 Time, s · Height 225.3252 Time, s · Height 230.6256 Time, s · Height 235.8260 Time, s · Height 240.8264 Time, s · Height 245.6268 Time, s · Height 250.3272 Time, s · Height 254.8276 Time, s · Height 259.2280 Time, s · Height 263.3284 Time, s · Height 267.3288 Time, s · Height 271.1292 Time, s · Height 274.7296 Time, s · Height 278300 Time, s · Height 281.2304 Time, s · Height 284.2308 Time, s · Height 286.9312 Time, s · Height 289.3316 Time, s · Height 291.6320 Time, s · Height 293.6324 Time, s · Height 295.3328 Time, s · Height 296.8332 Time, s · Height 298336 Time, s · Height 298.9340 Time, s · Height 299.6344 Time, s · Height 299.9
Readings
Time, sHeight
00
140.2644
281.478
423.876
567.645
7012.63
8419.09
9827.29
11237.38
12649.59
14064.27
15481.68
168101.7
182124.2
196147.1
210169.5
224191.1
238211.6
252230.6
266248
280263.3
294276.4
308286.9
322294.5
336298.9
25 rows

SolidTanks are sized to the propellant they carry, with 2:1 domes. Skirts, intertanks, interstages and the fairing are envelopes placed by rule. Engines are drawn by their outer form, not their metal.

Cut away

17328 triangles, shaded from the parts' own normals. 3D starts when Virtual's renderer loads.

Fits
FitsPartNote
FitsBooster engines under the stage10 bells of 0.18 m reach 0.37 m against a 0.65 m stage radius
FitsUpper engines under the stage1 bell of 0.34 m reach 0.17 m against a 0.65 m stage radius
2 rows

DrawingThe sheet's balloons and the stage's labels name the same parts.

SPARK BOOSTERSPARK UPPERHALF SECTION ABOVE, EXTERIOR BELOWPartSpark booster: 10 enginesSpark booster: aft skirtSpark booster: RP-1 kerosene tank, 6.4 m³Spark booster: intertankSpark booster: Liquid oxygen tank, 10.9 m³Spark booster: forward skirtInterstageSpark upper: 1 enginesSpark upper: RP-1 kerosene tank, 0.5 m³Spark upper: intertankSpark upper: Liquid oxygen tank, 0.9 m³Spark upper: forward skirtPayload fairingMaterialNickel alloyCarbon sandwich, bareAluminium-lithiumCarbon sandwich, bareAluminium-lithiumCarbon sandwichCarbon sandwich, bareNickel alloyAluminium-lithiumCarbon sandwich, bareAluminium-lithiumCarbon sandwichCarbon sandwichMass kg40.4envelope173.2envelope285.2envelopeenvelope8.928.4envelope36.7envelopeenvelopeCopies10111111111111Dimensions in millimetres. Upper half in section, lower half the exterior.Engines print at the launcher's scale as their outer form, not their metal.Phantom parts are skirts, intertanks and the fairing, proportioned by rule; their mass means nothing.Booster engines under the stage: fits. 10 bells of 0.18 m reach 0.37 m against a 0.65 m stage radiusUpper engines under the stage: fits. 1 bell of 0.34 m reach 0.17 m against a 0.65 m stage radiusA design report, not a release for manufacture.14012.6313002330.54130019333.17Spark launcher, 2 stagesNUMBERL-101SCALE1:100UNITSmillimetresSHEETL-101 A3DATEDRAWNCRE8 engine designREVAREVISIONc7175210CRE8 CAD
A3, scale 1:100, revision c7175210: the hash of the drawing's own text.DXF for CAD

How it is made

The Moon chain's make graph, read with this stack's engines, propellants and masses. It still assumes that chain's part shares for every engine, turbopump steps even for electric pumps, liquid oxygen and a 1,500 kg composite fairing.
Coal (raw): 8.02 kg per Vehicle fuelled on the pad; mined: bituminous coal.CoalCopper ore (raw): 8910 kg per Vehicle fuelled on the pad; mined: porphyry copper ore, about 0.6 % Cu.Copper oreIron ore (raw): 21.9 kg per Vehicle fuelled on the pad; mined: hematite ore, about 62 % Fe.Iron oreCoke (material): Bake coal to coke, bought. 6.17 runs per Vehicle fuelled on the pad; described.CokeLimestone (raw): 3.43 kg per Vehicle fuelled on the pad; quarried: limestone.LimestoneCopper concentrate (material): Crush, grind and float copper ore, bought. 171 runs per Vehicle fuelled on the pad; described.Copper concentratePig iron (material): Reduce iron ore in a blast furnace, bought. 13.7 runs per Vehicle fuelled on the pad; described.Pig ironSteel scrap (recovered): 4.03 kg per Vehicle fuelled on the pad; collected: sorted steel scrap.Steel scrapCopper cathode (material): Smelt, convert and electrorefine copper, bought. 46.3 runs per Vehicle fuelled on the pad; described.Copper cathodeCarbon steel (material): Blow pig iron to steel, bought. 16.1 runs per Vehicle fuelled on the pad; described.Carbon steelAluminium-lithium plate (opaque): 1300 kg per Vehicle fuelled on the pad; the alloy melt and plate mill are not drawn.Aluminium-lithium pla…Copper alloy powder (material): Atomise copper alloy, bought. 44.1 runs per Vehicle fuelled on the pad; described.Copper alloy powderInconel powder and billet (opaque): 103 kg per Vehicle fuelled on the pad; the nickel chain is not drawn.Inconel powder and bi…Steel rod (material): Roll steel rod, bought. 15.4 runs per Vehicle fuelled on the pad; described.Steel rodZinc plating (opaque): 0.14 kg per Vehicle fuelled on the pad; zinc and passivate chemistry; the zinc's mine is not drawn yet.Zinc platingSpark upper tank panels (material): Mill tank panels, made here on panel_mill. 116 runs per Vehicle fuelled on the pad; described.Spark upper tank pane…Spark upper tank domes (material): Spin form domes, made here on spin_former. 29.1 runs per Vehicle fuelled on the pad; described.Spark upper tank domesSpark upper engine chamber (part): Print chamber and injector, made here on metal_printer. 1 run per Vehicle fuelled on the pad; described.Spark upper engine ch…Spark upper engine turbopump (part): Machine turbopump, made here on turn_mill. 1 run per Vehicle fuelled on the pad; described.Spark upper engine tu…Spark booster tank panels (material): Mill tank panels, made here on panel_mill. 646 runs per Vehicle fuelled on the pad; described.Spark booster tank pa…Spark booster tank domes (material): Spin form domes, made here on spin_former. 161 runs per Vehicle fuelled on the pad; described.Spark booster tank do…Spark booster engine chamber (part): Print chamber and injector, made here on metal_printer. 10 runs per Vehicle fuelled on the pad; described.Spark booster engine …Machine screws, nuts and washers (material): Head, roll and plate fasteners, bought. 14 runs per Vehicle fuelled on the pad; described.Machine screws, nuts …Spark booster engine turbopump (part): Machine turbopump, made here on turn_mill. 10 runs per Vehicle fuelled on the pad; described.Spark booster engine …Spark upper tank before proof (material): Friction stir weld tank, made here on stir_welder. 145 runs per Vehicle fuelled on the pad; described.Spark upper tank befo…Carbon prepreg (opaque): 1910 kg per Vehicle fuelled on the pad; fibre and resin are not drawn.Carbon prepregRocket kerosene (opaque): 8390 kg per Vehicle fuelled on the pad; refinery not drawn.Rocket keroseneSpark upper engine before hot fire (assembly): Build engine, made here on engine_bay. 1 run per Vehicle fuelled on the pad; described.Spark upper engine be…Spark booster tank before proof (material): Friction stir weld tank, made here on stir_welder. 807 runs per Vehicle fuelled on the pad; described.Spark booster tank be…Liquid oxygen at the pad (opaque): 20100 kg per Vehicle fuelled on the pad; air separation not drawn.Liquid oxygen at the …Spark booster engine before hot fire (assembly): Build engine, made here on engine_bay. 10 runs per Vehicle fuelled on the pad; described.Spark booster engine …Spark upper tank (material): Proof test tank, made here on proof_bay. 145 runs per Vehicle fuelled on the pad; described.Spark upper tankSpark upper frame (material): Lay up thrust frame, made here on fibre_cell. 56.5 runs per Vehicle fuelled on the pad; described.Spark upper frameSpark upper engine (assembly): Hot fire, made here on test_stand. 1 run per Vehicle fuelled on the pad; described.Spark upper engineFlight computer and harness (opaque): 2 piece per Vehicle fuelled on the pad; boards, sensors and harness are not drawn for this vehicle.Flight computer and h…Spark booster frame (material): Lay up thrust frame, made here on fibre_cell. 314 runs per Vehicle fuelled on the pad; described.Spark booster frameSpark booster tank (material): Proof test tank, made here on proof_bay. 807 runs per Vehicle fuelled on the pad; described.Spark booster tankSpark booster engine (assembly): Hot fire, made here on test_stand. 10 runs per Vehicle fuelled on the pad; described.Spark booster engineSpark upper before static fire (assembly): Assemble stage, made here on stage_bay. 1 run per Vehicle fuelled on the pad; described.Spark upper before st…Spark booster before static fire (assembly): Assemble stage, made here on stage_bay. 1 run per Vehicle fuelled on the pad; described.Spark booster before …Payload fairing (part): Lay up fairing, made here on fibre_cell. 1 run per Vehicle fuelled on the pad; described.Payload fairingSpark upper (assembly): Static fire, made here on stage_stand. 1 run per Vehicle fuelled on the pad; described.Spark upperSpark booster (assembly): Static fire, made here on stage_stand. 1 run per Vehicle fuelled on the pad; described.Spark boosterStacked vehicle (assembly): Stack the vehicle, made here on integration_hall. 1 run per Vehicle fuelled on the pad; described.Stacked vehicleVehicle fuelled on the pad (product): Fuel on the pad, made here on launch_pad. 1 run per Vehicle fuelled on the pad; described.Vehicle fuelled on th…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

A factory for 10 vehicles in 2 years

Bottleneck
stage bay
Machines
13
Machine cost
$282,850,000
Power
1.05 MW
Floor
61,040 m²
Lead time
47.6 days
Energy per vehicle
81,608 kWh
Machines
MachineUnitsBusy
engine bay11%
fibre cell123%
integration hall117%
launch pad110%
panel mill11%
proof bay12%
single laser printer113%
spin former10%
stage bay170%
stage stand114%
stir welder10%
test stand110%
turn mill12%
13 rows