cre8.appliance.v1 · lamp

Task lamp, 24 LEDs

The lamp passes its checks

Task lamp takes 83 steps from 13 raw materials: 5 run here, 11 by partners, 67 are bought. The plan makes that 8 here, 20 by partners, 55 bought. 22 inputs are still opaque.

Mass
1.92 kg
Parts
17
Light
668 lm
From the wall
5.04 W
Energy class
D
On the desk
931 lx average

Recipe

As recipe text
cre8.appliance.v1
kind=lamp
base_diameter_mm=160
base_mass_kg=1.2
cct_k=4000
cord_m=1.8
cord_mm2=0.824
cri=80
driver_efficiency=0.85
flicker_pct=5
head_diameter_mm=110
joint_friction_nm=1.5
led_ma=60
led_package=2835
leds=24
levels=3
lower_arm_deg=90
lower_arm_mm=350
mains_hz=60
mains_v=120
power_factor=0.5
standby_w=0.3
style=task
upper_arm_mm=350

Checks

CheckReadsHolds to
Stabilitytips at 21.4° in its working pose, 21.4° at full reachstands on a 6° inclineholds
Joints hold2 of 2 joints hold their posefriction and springs carry each joint's loadholds
LED current60 mA per LEDat most 100 mA for its packageholds
Junction37.8 °C at the LED junctionat most 85 °Cholds
Touch35.2 °C on the headat most 65 °C to touchholds
Power4.28 W on-mode for 668 lm; 5.04 W from the wallEU 2019/2020: at most 7.06 W for its flux and CRIholds
Illuminance931 lx average on the desk from 0.347 m; 1240 lx at the centre, 699 lx at the edgeat least 500 lx averageholds
Uniformity0.751at least 0.6holds
ColourCRI 80 at 4000 KCRI at least 80holds
Flicker5% at 120 Hzat most 9.6%holds
Standby0.3 W switched offat most 0.5 Wholds
Cord0.824 mm² carrying 0.084 Aat least 0.5 mm²holds
Energy label144 lm/W at the wallclass D

At each level

LED, mAForward, VLEDs, WLight, lmlm/WWall, WHeat, WHead rise, KShell, °CJunction, °C
202.831.362481831.60.5843.1728.228.9
402.92.794661673.281.336.5631.633.2
602.974.286681565.042.210.235.237.8

Joints

JointLoad, N·mUnbalanced, N·mFriction, N·m
elbow0.8010.8011.5holds
head0.04870.04871.5holds

Bill of parts

PartGroupCountFormed byEachMaterials (each)
Shadelight1cast104 galuminium 103 g, powder coat 1.86 g
LED boardlight1bought21 gled board 21 g
LEDslight24bought0.02 gled 0.02 g
Diffuserlight1mould21.2 gpolycarbonate 21.2 g
Postarm1tube107 gsteel tube 105 g, powder coat 1.72 g
Armarm1tube107 gsteel tube 105 g, powder coat 1.72 g
Joint knucklearm3cast32.8 galuminium 32.8 g
Friction washerarm4mould0.403 gpom 0.403 g
Arm wirearm1extrude6.05 gpvc cord 3 g, copper strand 3.05 g
Base weightstand1stamp1.2 kgsteel strip 1.2 kg
Base coverstand1mould92.4 gabs 92.4 g
Switch housingcontrols1mould10 gabs 10 g
Switch contactcontrols2stamp2 gcopper strip 2 g
LED drivercontrols1bought40.2 gled driver 40.2 g
Mains cordcontrols1extrude52.3 gpvc cord 25.7 g, copper strand 26.6 g
Mains plugcontrols1bought30 gmains plug 30 g
Fastenersfinal8bought3 gfastener 3 g

1.92 kg in all, 1.84 kg carried by the stand (the cord and plug lie on the floor).

Made from

The longest chain is 10 steps; 0 of 37 made pieces have a published plan. The graph is make:task-lamp.

Crude oil (raw): 0.17 kg per Task lamp; drilled: crude oil.Crude oilCoal (raw): 0.976 kg per Task lamp; mined: bituminous coal.CoalQuartz (raw): 0.00015 kg per Task lamp; quarried: high-purity quartz lump.QuartzNaphtha (material): Distil crude oil to naphtha, bought. 0.162 runs per Task lamp; described.NaphthaBauxite (raw): 1.17 kg per Task lamp; mined: bauxite, about 50 % alumina.BauxiteCaustic soda for the Bayer liquor (recovered): 0.0373 kg per Task lamp; taken from chlor-alkali cells, where it comes off beside chlorine.Caustic soda for the …Copper ore (raw): 9.85 kg per Task lamp; mined: porphyry copper ore, about 0.6 % Cu.Copper oreMetallurgical silicon (material): Reduce quartz to silicon, bought. 0.0000534 runs per Task lamp; described.Metallurgical siliconHydrogen chloride and hydrogen (opaque): 0.0000247 kg per Task lamp; the chlor-alkali and hydrogen plants behind them are not drawn yet.Hydrogen chloride and…Propylene (material): Steam-crack naphtha for propylene, bought. 0.0368 runs per Task lamp; described.PropyleneBenzene (material): Reform naphtha and extract benzene, bought. 0.0626 runs per Task lamp; described.BenzeneAlumina (material): Digest bauxite to alumina, bought. 0.467 runs per Task lamp; described.AluminaNatural gas (raw): 0.0109 kg per Task lamp; drilled: natural gas, mostly methane.Natural gasCopper concentrate (material): Crush, grind and float copper ore, bought. 0.189 runs per Task lamp; described.Copper concentratePolysilicon (material): Refine silicon to polysilicon, bought. 0.0000411 runs per Task lamp; described.PolysiliconIron ore (raw): 2.67 kg per Task lamp; mined: hematite ore, about 62 % Fe.Iron oreCoke (material): Bake coal to coke, bought. 0.751 runs per Task lamp; described.CokePrebaked carbon anode (opaque): 0.102 kg per Task lamp; calcined petroleum coke and coal-tar pitch; not drawn yet.Prebaked carbon anodeAluminium fluoride (opaque): 0.00483 kg per Task lamp; from fluorspar or fluorosilicic acid; not drawn yet.Aluminium fluorideAmmonia (material): Reform gas and synthesize ammonia, bought. 0.0127 runs per Task lamp; described.AmmoniaMetal-organic precursors (opaque): 0.0000016 kg per Task lamp; trimethylgallium, trimethylindium and trimethylaluminium; their makers and gallium's own refining from bauxite liquor are not drawn yet.Metal-organic precurs…Cumene (material): Alkylate benzene with propylene to cumene, bought. 0.0216 runs per Task lamp; described.CumenePatterned sapphire wafer, 100 mm (part): Grow and slice sapphire wafers, bought. 0.0008 runs per Task lamp; described.Patterned sapphire wa…Salt (raw): 0.0383 kg per Task lamp; mined: rock salt or solar brine.SaltLimestone (raw): 0.424 kg per Task lamp; quarried: limestone.LimestoneCopper cathode (material): Smelt, convert and electrorefine copper, bought. 0.0512 runs per Task lamp; described.Copper cathodeSilica sand (raw): 0.00125 kg per Task lamp; quarried: glass-grade silica sand.Silica sandKaolin (raw): 0.00119 kg per Task lamp; quarried: kaolin clay.KaolinColemanite (raw): 0.000462 kg per Task lamp; mined: colemanite borate ore.ColemaniteFab gases, acids and photoresist (opaque): 0.00113 kg per Task lamp; per-wafer loadings vary by node and fab; not disclosed.Fab gases, acids and …Single-crystal silicon ingot (material): Grow a single-crystal ingot, bought. 0.0000358 runs per Task lamp; described.Single-crystal silico…Steel scrap (recovered): 0.491 kg per Task lamp; collected: sorted steel scrap.Steel scrapPig iron (material): Reduce iron ore in a blast furnace, bought. 1.67 runs per Task lamp; described.Pig ironPrimary aluminium (material): Electrolyse alumina to aluminium, bought. 0.242 runs per Task lamp; described.Primary aluminiumThermally conductive dielectric (opaque): 0.00121 kg per Task lamp; ceramic-filled epoxy prepreg; formulation not disclosed.Thermally conductive …PPA reflector body (opaque): 0.000216 kg per Task lamp; polyphthalamide moulded over the silver-plated lead frame; resin not disclosed.PPA reflector bodyPhosphor in silicone (opaque): 0.000072 kg per Task lamp; YAG:Ce or nitride phosphor in optical silicone; formulation not disclosed.Phosphor in siliconeBlue InGaN LED die (part): Grow GaN epitaxy and make LED dies, bought. 0.0008 runs per Task lamp; described.Blue InGaN LED diePhenol (material): Oxidize and cleave cumene to phenol, bought. 0.0165 runs per Task lamp; described.PhenolAcetone for bisphenol A (recovered): 0.0053 kg per Task lamp; taken from the cumene process, where it comes off beside phenol.Acetone for bisphenol…Ethylene (material): Steam-crack naphtha for ethylene, bought. 0.0305 runs per Task lamp; described.EthyleneCarbon monoxide (material): Reform gas to carbon monoxide, bought. 0.00259 runs per Task lamp; described.Carbon monoxideChlorine (material): Electrolyse brine to chlorine, bought. 0.0225 runs per Task lamp; described.ChlorineCopper foil, 35 µm (material): Electrodeposit copper foil, bought. 0.0029 runs per Task lamp; described.Copper foil, 35 µmTin ore (raw): 0.113 kg per Task lamp; mined: cassiterite ore, about 1 % Sn.Tin oreE-glass cloth (material): Melt, draw and weave E-glass, bought. 0.0033 runs per Task lamp; described.E-glass clothBrominated epoxy and hardener (opaque): 0.0024 kg per Task lamp; petrochemical epoxy system; the chain behind it is not drawn yet.Brominated epoxy and …Copper strip (material): Cast and roll copper strip, bought. 0.00629 runs per Task lamp; described.Copper stripSilicon wafer, 200 mm (part): Slice and polish wafers, bought. 0.000325 runs per Task lamp; described.Silicon wafer, 200 mmMagnet wire enamel (opaque): 0.00012 kg per Task lamp; polyester-imide or polyamide-imide enamel; formulation not disclosed.Magnet wire enamelCarbon steel (material): Blow pig iron to steel, bought. 1.96 runs per Task lamp; described.Carbon steelMethanol (material): Reform gas and synthesize methanol, bought. 0.00202 runs per Task lamp; described.MethanolMetal-core board laminate (material): Laminate metal-core board stock, bought. 0.0242 runs per Task lamp; described.Metal-core board lami…White LED (component): Package the white LED, bought. 24 runs per Task lamp; described.White LEDBisphenol A (material): Condense phenol and acetone to bisphenol A, bought. 0.0196 runs per Task lamp; described.Bisphenol ACaustic soda for the bisphenol solution (recovered): 0.0072 kg per Task lamp; taken from chlor-alkali cells, where it comes off beside chlorine.Caustic soda for the …Phosgene (material): Combine carbon monoxide and chlorine to phosgene, bought. 0.00894 runs per Task lamp; described.PhosgeneSilver (recovered): 0.0000283 kg per Task lamp; recovered: refinery slimes from copper and lead refining.SilverSolder flux (opaque): 0.000115 kg per Task lamp; no-clean rosin flux; formulation not disclosed.Solder fluxVinyl chloride (material): Chlorinate ethylene and crack to vinyl chloride, bought. 0.0271 runs per Task lamp; described.Vinyl chlorideTin (material): Concentrate and smelt tin, bought. 0.000901 runs per Task lamp; described.TinBoard etchants, plating and solder mask (opaque): 0.003 kg per Task lamp; etch, plating and mask chemistry; not disclosed.Board etchants, plati…FR-4 laminate (material): Impregnate and press FR-4, bought. 0.006 runs per Task lamp; described.FR-4 laminateDimmer microcontroller die (part): Fabricate Dimmer microcontroller dies, bought; meant to be made by a partner (open_pdk_foundry). 0.000125 runs per Task lamp; described.Dimmer microcontrolle…Power MOSFET die (part): Fabricate Power MOSFET dies, bought; meant to be made by a partner (open_pdk_foundry). 0.0000833 runs per Task lamp; described.Power MOSFET dieEpoxy mould compound (opaque): 0.00066 kg per Task lamp; silica-filled epoxy; formulation not disclosed.Epoxy mould compoundConstant-current LED controller die (part): Fabricate Constant-current LED controller dies, bought; meant to be made by a partner (open_pdk_foundry). 0.0000667 runs per Task lamp; described.Constant-current LED …Bridge rectifier die (part): Fabricate Bridge rectifier dies, bought; meant to be made by a partner (open_pdk_foundry). 0.00005 runs per Task lamp; described.Bridge rectifier dieEnamelled magnet wire (material): Cast rod, draw and enamel magnet wire, bought. 0.004 runs per Task lamp; described.Enamelled magnet wireSoft ferrite core (opaque): 0.006 kg per Task lamp; manganese-zinc ferrite pressed and sintered; its oxides are not drawn yet.Soft ferrite coreSteel strip (material): Roll steel strip, bought. 1.79 runs per Task lamp; described.Steel stripButadiene (material): Extract butadiene from the cracker C4 cut, bought. 0.02 runs per Task lamp; described.ButadieneAcrylonitrile (material): Ammoxidize propylene to acrylonitrile, bought. 0.0264 runs per Task lamp; described.AcrylonitrileStyrene (material): Alkylate benzene and dehydrogenate to styrene, bought. 0.0612 runs per Task lamp; described.StyrenePolyester powder coat (opaque): 0.0057 kg per Task lamp; polyester resin, curing agent and pigment; not drawn yet.Polyester powder coatFormaldehyde (material): Oxidize methanol to formaldehyde, bought. 0.00176 runs per Task lamp; described.FormaldehydeLED board (component): Fabricate the LED board, bought; meant to be made by a partner (pcb_fab). 1 run per Task lamp; described.LED boardLEDs (component): Bin the LEDs, bought. 24 runs per Task lamp; described.LEDsPolycarbonate (material): Interfacially polymerize polycarbonate, bought. 0.0218 runs per Task lamp; described.PolycarbonateSAC305 solder paste (material): Alloy, atomize and blend solder paste, bought. 0.00105 runs per Task lamp; described.SAC305 solder pastePVC resin (material): Suspension-polymerize PVC, bought. 0.0268 runs per Task lamp; described.PVC resinPVC plasticiser (opaque): 0.0146 kg per Task lamp; DINP or DOTP from oxo alcohols and phthalic or terephthalic acid; not drawn yet.PVC plasticiserPVC heat stabiliser (opaque): 0.000975 kg per Task lamp; calcium-zinc stabiliser package; formulation not disclosed.PVC heat stabiliserZinc for brass (opaque): 0.00388 kg per Task lamp; zinc metal; its mine and smelter are not drawn yet.Zinc for brassAluminium electrolytic capacitor (opaque): 1 piece per Task lamp; etched aluminium foil, paper and electrolyte in a can; not drawn yet.Aluminium electrolyti…LED driver board, bare (part): Fabricate the LED driver board, bare, bought; meant to be made by a partner (pcb_fab). 1 run per Task lamp; described.LED driver board, bareDimmer microcontroller (component): Package Dimmer microcontroller, bought; meant to be made by a partner (chip_packaging). 1 run per Task lamp; described.Dimmer microcontrollerPower MOSFET (component): Package Power MOSFET, bought; meant to be made by a partner (chip_packaging). 1 run per Task lamp; described.Power MOSFETConstant-current LED controller (component): Package Constant-current LED controller, bought; meant to be made by a partner (chip_packaging). 1 run per Task lamp; described.Constant-current LED …Chip resistors and capacitors (opaque): 18 piece per Task lamp; ceramic, nickel, tin and resistive films; not drawn yet.Chip resistors and ca…Bridge rectifier (component): Package Bridge rectifier, bought; meant to be made by a partner (chip_packaging). 1 run per Task lamp; described.Bridge rectifierBuck inductor (component): Wind the buck inductor, bought. 1 run per Task lamp; described.Buck inductorWelded steel tube (material): Roll-form and weld steel tube, bought. 0.223 runs per Task lamp; described.Welded steel tubeABS (material): Graft and compound ABS, bought. 0.105 runs per Task lamp; described.ABSAcetal copolymer (POM) (material): Trimerize and polymerize acetal, bought. 0.00166 runs per Task lamp; described.Acetal copolymer (POM)Shade (part): Die-cast the shade, made by a partner (die_casting). 1 run per Task lamp; described.ShadeLED module (component): Populate the LED module, made by a partner (pcb_assembly). 1 run per Task lamp; described.LED moduleDiffuser (part): Mould the diffuser, made by a partner (injection_moulding). 1 run per Task lamp; described.DiffuserThermal paste (opaque): 0.0005 kg per Task lamp; silicone grease filled with metal oxides; formulation not disclosed.Thermal pasteBunched copper strand (material): Draw and bunch copper strand, bought. 0.0302 runs per Task lamp; described.Bunched copper strandFlexible PVC cord compound (material): Compound flexible PVC, bought. 0.0488 runs per Task lamp; described.Flexible PVC cord com…Brass rod (material): Melt and draw brass rod, bought. 0.0105 runs per Task lamp; described.Brass rodLED driver board (component): Populate the LED driver board, bought; meant to be made by a partner (pcb_assembly). 1 run per Task lamp; described.LED driver boardBase weight (part): Stamp the base weight, made by a partner (metal_stamping). 1 run per Task lamp; described.Base weightBase cover (part): Mould the base cover, made by a partner (injection_moulding). 1 run per Task lamp; described.Base coverSteel rod (material): Roll steel rod, bought. 0.0264 runs per Task lamp; described.Steel rodZinc plating (opaque): 0.00024 kg per Task lamp; zinc and passivate chemistry; the zinc's mine is not drawn yet.Zinc platingJoint knuckle (part): Die-cast the joint knuckle, made by a partner (die_casting). 3 runs per Task lamp; described.Joint knuckleArm (part): Cut and form the arm, made by a partner (tube_bending); meant to be made here on tube_bender. 1 run per Task lamp; described.ArmPost (part): Cut and form the post, made by a partner (tube_bending); meant to be made here on tube_bender. 1 run per Task lamp; described.PostFriction washer (part): Mould the friction washer, made by a partner (injection_moulding). 4 runs per Task lamp; described.Friction washerSwitch housing (part): Mould the switch housing, made by a partner (injection_moulding). 1 run per Task lamp; described.Switch housingLamp head (assembly): Assemble the head, made here on assembly_bench. 1 run per Task lamp; open.Lamp headArm wire (part): Extrude the arm wire, bought. 1 run per Task lamp; described.Arm wireMains cord (part): Extrude the mains cord, bought. 1 run per Task lamp; described.Mains cordMains plug (component): Make the mains plug, bought. 1 run per Task lamp; described.Mains plugSwitch contact (part): Stamp the switch contact, made by a partner (metal_stamping). 2 runs per Task lamp; described.Switch contactLED driver (component): Test the LED driver, bought; meant to be made here on test_bench. 1 run per Task lamp; described.LED driverBase (assembly): Assemble the base, made here on assembly_bench. 1 run per Task lamp; open.BaseMachine screws, nuts and washers (material): Head, roll and plate fasteners, bought. 0.024 runs per Task lamp; described.Machine screws, nuts …Arm (assembly): Assemble the arm, made here on assembly_bench. 1 run per Task lamp; open.ArmDriver, switch and cord set (assembly): Assemble the controls, made here on assembly_bench. 1 run per Task lamp; open.Driver, switch and co…Task lamp (product): Assemble the task lamp, made here on assembly_bench. 1 run per Task lamp; open.Task lamp
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts
MaterialPer lampFrom
Copper ore9.85 kgmined: porphyry copper ore, about 0.6 % Cu
Iron ore2.67 kgmined: hematite ore, about 62 % Fe
Bauxite1.17 kgmined: bauxite, about 50 % alumina
Coal976 gmined: bituminous coal
Limestone424 gquarried: limestone
Crude oil170 gdrilled: crude oil
Tin ore113 gmined: cassiterite ore, about 1 % Sn
Salt38.3 gmined: rock salt or solar brine
Natural gas10.9 gdrilled: natural gas, mostly methane
Silica sand1.25 gquarried: glass-grade silica sand
Kaolin1.19 gquarried: kaolin clay
Colemanite0.462 gmined: colemanite borate ore
Quartz0.15 gquarried: high-purity quartz lump
Steel scrap491 grecovered: collected: sorted steel scrap
Caustic soda for the Bayer liquor37.3 grecovered: taken from chlor-alkali cells, where it comes off beside chlorine
Caustic soda for the bisphenol solution7.2 grecovered: taken from chlor-alkali cells, where it comes off beside chlorine
Acetone for bisphenol A5.3 grecovered: taken from the cumene process, where it comes off beside phenol
Silver0.0283 grecovered: recovered: refinery slimes from copper and lead refining

Where buying starts

Still opaque

InputPer lampWhat is missing
Chip resistors and capacitors18 piecesceramic, nickel, tin and resistive films; not drawn yet
Aluminium electrolytic capacitor1 pieceetched aluminium foil, paper and electrolyte in a can; not drawn yet
Prebaked carbon anode102 gcalcined petroleum coke and coal-tar pitch; not drawn yet
PVC plasticiser14.6 gDINP or DOTP from oxo alcohols and phthalic or terephthalic acid; not drawn yet
Soft ferrite core6 gmanganese-zinc ferrite pressed and sintered; its oxides are not drawn yet
Polyester powder coat5.7 gpolyester resin, curing agent and pigment; not drawn yet
Aluminium fluoride4.83 gfrom fluorspar or fluorosilicic acid; not drawn yet
Zinc for brass3.88 gzinc metal; its mine and smelter are not drawn yet
Board etchants, plating and solder mask3 getch, plating and mask chemistry; not disclosed
Brominated epoxy and hardener2.4 gpetrochemical epoxy system; the chain behind it is not drawn yet
Thermally conductive dielectric1.21 gceramic-filled epoxy prepreg; formulation not disclosed
Fab gases, acids and photoresist1.13 gper-wafer loadings vary by node and fab; not disclosed
PVC heat stabiliser0.975 gcalcium-zinc stabiliser package; formulation not disclosed
Epoxy mould compound0.66 gsilica-filled epoxy; formulation not disclosed
Thermal paste0.5 gsilicone grease filled with metal oxides; formulation not disclosed
Zinc plating0.24 gzinc and passivate chemistry; the zinc's mine is not drawn yet
PPA reflector body0.216 gpolyphthalamide moulded over the silver-plated lead frame; resin not disclosed
Magnet wire enamel0.12 gpolyester-imide or polyamide-imide enamel; formulation not disclosed
Solder flux0.115 gno-clean rosin flux; formulation not disclosed
Phosphor in silicone0.072 gYAG:Ce or nitride phosphor in optical silicone; formulation not disclosed
Hydrogen chloride and hydrogen0.0247 gthe chlor-alkali and hydrogen plants behind them are not drawn yet
Metal-organic precursors0.0016 gtrimethylgallium, trimethylindium and trimethylaluminium; their makers and gallium's own refining from bauxite liquor are not drawn yet

Who makes it

Today 5 steps run here, 11 by partners and 67 are bought. The plan runs 8 here, 20 by partners and buys 55.

Machines here: assembly bench, test bench, tube bender. Partner capabilities wanted: chip packaging, die casting, injection moulding, metal stamping, open pdk foundry, pcb assembly, pcb fab. Standard chains use typical published yields and loadings, rounded; none is measured on a line this network runs.