Skip to content
1 viewer
Mine
arid basin

Bedded salt and gypsum

One life of this Bedded salt and gypsum mine takes 3 steps from 3 raw materials: 0 run here, 3 by partners, 0 are bought. 3 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Does not pay
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
-$1,237M
Grade
SALT 85 %, GYPSUM 40 %, SULFUR 2 %, CELESTINE 0.5 %
Milled
53,846,125 t
Rate
9,187 t a day
Life
17.3 years

Run a mine

The ground

Deposit model
No USGS descriptive model
In the ground
200,217,865 t
SALT in it
170,185,179 t
GYPSUM in it
80,087,143 t
SULFUR in it
4,004,357 t
CELESTINE in it
1,001,089 t
Drilled
508 holes, 155,213 m
Drilling
$28M over 575 days

The plan and the run

Method
Room and pillar
Treatment
Crush and screen
Planned
55,511,469 t over 1 levels
Cut-off
$31.5/t
Fleet
6 drill rigs, 10 loaders, 26 trucks
Walked
14,062 days
First ore
day 1,094
Revenue
$2,087M
Operating cost
$2,471M
Plant and development
$1,355M
Carbon dioxide
359,829 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
485 people, 119 of them contractors
Machines with no one in the seat
0
Owner wages
$1,243M
Paid hours
19,214,906 worked, 1,189,536 breaks, 2,728,883 leave and training, 1,304,489 travel and blast window, 1,987,280 with nothing to do
Work orders drafted
28
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner2525$68.8
Geologistowner88$63.5
Surveyorowner55$50.2
Safety and training officerowner11$58.2
Shift bossowner626.5$65.5competent person for workplace examinations
Jumbo operatorcontractor313.3$55
Bolterowner28.84$52.4
Boltercontractor730.9$52.4
Blasterowner28.84$55blaster's certificate
Blastercontractor417.7$55blaster's certificate
Long-hole drillerowner626.5$55
Diamond drillercontractor626.5$55
Loader operatorowner939.8$52.4
Loader operatorcontractor28.84$52.4
Truck drivercontractor417.7$47.1
Service crewowner313.3$44.5
Service crewcontractor522.1$44.5
Crusher operatorowner14.42$47.1
Hoist operatorowner28.84$52.4hoist operator's certificate where the state issues one
Mill operatorowner1044.2$49.8
Lab technicianowner28.84$41.9
Ventilation technicianowner14.42$49.8
Environment technicianowner14.42$47.1
Mechanicowner2088.4$57.6
Electricianowner522.1$60.2electrician's licence
Office: safety, stores, people, accountsowner5454$39.7
27 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Mark up the face and linebreakpersonSurveyorownerMine engineer63,93363,933a work order
Map the face geologybreakpersonGeologistownerMine engineer31,96731,967a work order
Drill the development roundbreakpersonJumbo operatorcontractorShift boss170,489170,489contract: paid through the development metre rate
Charge and fire the roundbreakpersonBlastercontractorShift boss213,112213,112A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Muck out the headingbreakpersonLoader operatorcontractorShift boss85,24585,245contract: paid through the development metre rate
Truck development rock outbreakpersonTruck drivercontractorShift boss213,112213,112contract: paid through the development metre rate
Scale, bolt and mesh the backbreakpersonBoltercontractorMine engineer426,223426,223A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement.
Extend air, water, power and vent ductbreakpersonService crewcontractorShift boss319,667319,667contract: paid through the development metre rate
Drill the production ringsbreakpersonLong-hole drillerownerShift boss462,596462,596a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss149,881149,881A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss2,115,0332,115,033a work order
Cable-bolt the stope backs and browsbreakpersonBolterownerMine engineer166,534166,534A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement.
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist666,138666,138contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer33,30733,307a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer222,046222,046a work order
Break oversize and run the crusherhoistpersonCrusher operatorownerShift boss309,364309,364a work order
Wind the skipshoistpersonHoist operatorownerMechanic97,05797,057a work order
Ride and tend the cagehoistpersonHoist operatorownerShift boss309,364309,364a work order
Run the millmillpersonMill operatorownerMine engineer2,479,3762,479,376a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer215,385215,385a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager215,385215,385a work order
Keep roads, pumps and pipesbreakpersonService crewownerShift boss576,542576,542a work order
Carry explosives, bolts and parts to the workbreakpersonService crewownerShift boss288,271288,271a work order
Survey the air and set vent controlsbreakpersonVentilation technicianownerMine engineer288,271288,271a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer309,364309,364a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer576,542576,542a work order
Keep the power and controlssitepersonElectricianownerMine engineer288,271288,271a work order
Examine each working placebreakpersonShift bossownerMine manager84,05484,054A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager1,301,7391,301,739a work order
Train and keep the mine rescue teamssitepersonSafety and training officerownerMine manager16,07116,071Two rescue teams of five are drawn from the crews and kept trained (30 CFR 49, cited from memory).
Answer for the mine under its permitsitepersonMine managerownerthe inspector72,31972,319A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer2,547,4622,547,462a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer545,885545,885a work order
Lead the shiftsitepersonShift bossownerMine manager848,611848,611a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager2,506,2922,506,292a work order
35 rows

What it takes

Depth
340 m
Air
639.6 m³/s, fan 20930 kW
Water in
639 L/s, pump 3042 kW
Rock at the bottom
23.5 °C
Diesel
134,264,563 L
Power
7,399,678,083 kWh
Explosive
41,164,546 kg
Cement
0 kg
Steel
12,786,690 kg
Reagents
0 kg
Water
592,307 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.0000042 t
Came inTonnesSALT tGYPSUM tSULFUR tCELESTINE t
mineralised rock in place200,217,865170,185,17980,087,1434,004,3571,001,089
barren rock broken5,434,6890000
development rock14,481,5170000
3 rows
Went toTonnesSALT tGYPSUM tSULFUR tCELESTINE t
left in the ground150,141,085125,534,78359,601,7352,988,308748,815
left in stopes1,665,3441,339,512614,56230,4817,568
waste dump14,481,5170000
rock fill00000
paste fill00000
tailings dam807,692649,663298,06314,7843,671
sized product53,038,43342,661,22119,572,783970,784241,035
7 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
SALT0.9140.887
GYPSUM0.9110.883
SULFUR0.9070.88
CELESTINE0.9130.885
4 rows

How it is made

Bedded salt and gypsum ore (raw): 53800000000 kg per Concentrates from one Bedded salt and gypsum mine life; mined: Bedded salt and gypsum by Room and pillar.Bedded salt and gypsu…Waste rock in place (raw): 14500000000 kg per Concentrates from one Bedded salt and gypsum mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 41200000 kg per Concentrates from one Bedded salt and gypsum mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 134000000 L per Concentrates from one Bedded salt and gypsum mine life; Bought in; its own chain is not followed here..DieselGround support steel (opaque): 12799999.999999998 kg per Concentrates from one Bedded salt and gypsum mine life; Bought in; its own chain is not followed here..Ground support steelBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Bedded salt and gypsum mine life; described. Energy: at least 8610000000 kWh; 3 opaque inputs carry no energy.Broken rockRock at surface (material): Hoist to surface, made by a partner (mining). 1 run per Concentrates from one Bedded salt and gypsum mine life; described. Energy: at least 8670000000 kWh; 3 opaque inputs carry no energy.Rock at surfaceProcess water (raw): 592000000 kg per Concentrates from one Bedded salt and gypsum mine life; drawn: make-up water.Process waterConcentrates from one Bedded salt and gypsum mine life (product): Crush and screen, made by a partner (mineral_processing). 1 run per Concentrates from one Bedded salt and gypsum mine life; described. Energy: at least 8750000000 kWh; 3 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open evaporite 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows