Mine
alluvial

Heavy mineral beach sands

One life of this Heavy mineral beach sands mine takes 2 steps from 2 raw materials: 0 run here, 2 by partners, 0 are bought. 4 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Pays
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
$560M
Grade
TI 2.5 %, REE 0.05 %, SILICA 70 %
Milled
85,989,150 t
Rate
13,257 t a day
Life
19.5 years

Run a mine

The ground

Deposit model
39c
In the ground
75,000,000 t
TI in it
1,875,000 t
REE in it
37,500 t
SILICA in it
52,499,999 t
Drilled
516 holes, 24,355 m
Drilling
$4M over 90 days

The plan and the run

Method
Dredging
Treatment
Gravity tables
Planned
90,514,895 t over 1 levels
Cut-off
$16/t
Fleet
2 drill rigs, 1 loaders, 2 trucks
Walked
6,605 days
First ore
day 0
Revenue
$2,329M
Operating cost
$738M
Plant and development
$372M
Rate of return
34 %
Carbon dioxide
54,150 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
242 people, 35 of them contractors
Machines with no one in the seat
0
Owner wages
$436M
Paid hours
7,072,778 worked, 363,952 breaks, 1,023,481 leave and training, 121,318 travel and blast window, 904,172 with nothing to do
Work orders drafted
18
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner3636$68.8
Geologistowner1111$63.5
Surveyorowner22$50.2
Shift bossowner28.84$65.5competent person for workplace examinations
Diamond drillercontractor835.4$55
Loader operatorowner14.42$52.4
Truck driverowner28.84$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner1357.5$49.8
Lab technicianowner313.3$41.9
Environment technicianowner14.42$47.1
Mechanicowner417.7$57.6
Electricianowner28.84$60.2electrician's licence
Office: safety, stores, people, accountsowner2828$39.7
15 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Load the broken rockbreakpersonLoader operatorownerShift boss47,77247,772a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss183,684183,684a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist1,086,1791,086,179contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer54,30954,309a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer362,060362,060a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss145,310145,310a work order
Run the millmillpersonMill operatorownerMine engineer1,755,8021,755,802a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer343,957343,957a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager343,957343,957a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer145,310145,310a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer290,620290,620a work order
Keep the power and controlssitepersonElectricianownerMine engineer145,310145,310a work order
Examine each working placebreakpersonShift bossownerMine manager3,2573,257A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager849,214849,214a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector33,96933,969A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer162,019162,019a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer34,71834,718a work order
Lead the shiftsitepersonShift bossownerMine manager162,797162,797a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager922,536922,536a work order
19 rows

What it takes

Diesel
20,205,196 L
Power
410,953,349 kWh
Water
47,294,033 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.000015 t
Came inTonnesTI tREE tSILICA t
mineralised rock in place75,000,0001,875,00037,50052,499,999
barren rock broken19,461,666000
development rock0000
3 rows
Went toTonnesTI tREE tSILICA t
left in the ground3,946,772106,2741,9042,440,211
left in stopes4,525,74588,4361,7802,502,989
waste dump0000
rock fill0000
paste fill0000
tailings dam54,237,548256,35410,70619,022,719
ilmenite and rutile2,588,9761,423,93700
monazite46,219023,1100
silica sand29,116,4070028,534,079
9 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
TI0.7780.739
REE0.7770.739
SILICA0.7810.742
3 rows

How it is made

Heavy mineral beach sands ore (raw): 86000000000 kg per Concentrates from one Heavy mineral beach sands mine life; mined: Heavy mineral beach sands by Dredging.Heavy mineral beach s…Diesel (opaque): 20200000 L per Concentrates from one Heavy mineral beach sands mine life; Bought in; its own chain is not followed here..DieselGround support steel (opaque): 0.00000581 kg per Concentrates from one Heavy mineral beach sands mine life; Bought in; its own chain is not followed here..Ground support steelBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Heavy mineral beach sands mine life; described. Energy: at least 202000000 kWh; 2 opaque inputs carry no energy.Broken rockGrinding steel (opaque): 34400000 kg per Concentrates from one Heavy mineral beach sands mine life; Bought in; its own chain is not followed here..Grinding steelReagents (opaque): 860000 kg per Concentrates from one Heavy mineral beach sands mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 47300000000 kg per Concentrates from one Heavy mineral beach sands mine life; drawn: make-up water.Process waterConcentrates from one Heavy mineral beach sands mine life (product): Gravity tables, made by a partner (mineral_processing). 1 run per Concentrates from one Heavy mineral beach sands mine life; described. Energy: at least 614000000 kWh; 4 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open heavy_sands 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows