1 viewer
arc
Tin vein and greisen
One life of this Tin vein and greisen mine takes 3 steps from 3 raw materials: 0 run here, 3 by partners, 0 are bought. 6 inputs are still opaque.
- On these prices
- Does not pay
- Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
- -$155M
- Grade
- SN 0.8 %, W 0.05 %
- Milled
- 169,270 t
- Rate
- 124 t a day
- Life
- 4.11 years
Run a mine
The ground
- Deposit model
- 15b
- In the ground
- 593,684 t
- SN in it
- 4,749 t
- W in it
- 297 t
- Drilled
- 372 holes, 111,249 m
- Drilling
- $20M over 412 days
The plan and the run
- Method
- Cut and fill
- Treatment
- Gravity tables
- Planned
- 178,179 t over 15 levels
- Cut-off
- $82/t
- Fleet
- 2 drill rigs, 2 loaders, 6 trucks
- Walked
- 1,933 days
- First ore
- day 560
- Revenue
- $14M
- Operating cost
- $96M
- Plant and development
- $86M
- Carbon dioxide
- 3,571 t
Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.
- On the books at peak
- 157 people, 31 of them contractors
- Machines with no one in the seat
- 0
- Owner wages
- $71M
- Paid hours
- 770,882 worked, 76,162 breaks, 156,669 leave and training, 77,280 travel and blast window, 476,816 with nothing to do
- Work orders drafted
- 30
| Role | Answers | Posts a shift | People | An hourThe assumed loaded wage for the role, in US dollars. | Licence |
|---|---|---|---|---|---|
| Mine manager | owner | 1 | 1 | $116 | mine manager's certificate where the state issues one |
| Mine engineer | owner | 4 | 4 | $68.8 | |
| Geologist | owner | 1 | 1 | $63.5 | |
| Surveyor | owner | 1 | 1 | $50.2 | |
| Safety and training officer | owner | 1 | 1 | $58.2 | |
| Shift boss | owner | 2 | 8.84 | $65.5 | competent person for workplace examinations |
| Jumbo operator | contractor | 1 | 4.42 | $55 | |
| Bolter | owner | 1 | 4.42 | $52.4 | |
| Bolter | contractor | 1 | 4.42 | $52.4 | |
| Blaster | owner | 1 | 4.42 | $55 | blaster's certificate |
| Blaster | contractor | 1 | 4.42 | $55 | blaster's certificate |
| Long-hole driller | owner | 1 | 4.42 | $55 | |
| Diamond driller | contractor | 1 | 4.42 | $55 | |
| Loader operator | owner | 1 | 4.42 | $52.4 | |
| Loader operator | contractor | 1 | 4.42 | $52.4 | |
| Truck driver | contractor | 1 | 4.42 | $47.1 | |
| Service crew | owner | 3 | 13.3 | $44.5 | |
| Service crew | contractor | 1 | 4.42 | $44.5 | |
| Crusher operator | owner | 1 | 4.42 | $47.1 | |
| Hoist operator | owner | 2 | 8.84 | $52.4 | hoist operator's certificate where the state issues one |
| Mill operator | owner | 4 | 17.7 | $49.8 | |
| Lab technician | owner | 1 | 4.42 | $41.9 | |
| Paste and fill operator | owner | 1 | 4.42 | $47.1 | |
| Ventilation technician | owner | 1 | 4.42 | $49.8 | |
| Environment technician | owner | 1 | 4.42 | $47.1 | |
| Mechanic | owner | 4 | 17.7 | $57.6 | |
| Electrician | owner | 2 | 8.84 | $60.2 | electrician's licence |
| Office: safety, stores, people, accounts | owner | 12 | 12 | $39.7 |
| Task | Step | Done byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control. | Role | Answers | Checked by | HoursThe task's hours: a machine's when a machine did it. | At the workHours a person spent at the work itself. | WhyWhy a person does the task at every level, or how it is paid when it is not a work order. |
|---|---|---|---|---|---|---|---|---|
| Mark up the face and line | break | person | Surveyor | owner | Mine engineer | 2,341 | 2,341 | a work order |
| Map the face geology | break | person | Geologist | owner | Mine engineer | 1,171 | 1,171 | a work order |
| Drill the development round | break | person | Jumbo operator | contractor | Shift boss | 6,244 | 6,244 | contract: paid through the development metre rate |
| Charge and fire the round | break | person | Blaster | contractor | Shift boss | 7,805 | 7,805 | A certified blaster charges and fires at every level; charging machines exist, firing stays with a person. |
| Muck out the heading | break | person | Loader operator | contractor | Shift boss | 3,122 | 3,122 | contract: paid through the development metre rate |
| Truck development rock out | break | person | Truck driver | contractor | Shift boss | 7,805 | 7,805 | contract: paid through the development metre rate |
| Scale, bolt and mesh the back | break | person | Bolter | contractor | Mine engineer | 15,609 | 15,609 | A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement. |
| Extend air, water, power and vent duct | break | person | Service crew | contractor | Shift boss | 11,707 | 11,707 | contract: paid through the development metre rate |
| Drill the production rings | break | person | Long-hole driller | owner | Shift boss | 1,485 | 1,485 | a work order |
| Charge and fire the stope or bench | break | person | Blaster | owner | Shift boss | 481 | 481 | A certified blaster charges and fires at every level; charging machines exist, firing stays with a person. |
| Load the broken rock | break | person | Loader operator | owner | Shift boss | 936 | 936 | a work order |
| Cable-bolt the stope backs and brows | break | person | Bolter | owner | Mine engineer | 535 | 535 | A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement. |
| Diamond-drill the next stopes | break | person | Diamond driller | contractor | Geologist | 2,138 | 2,138 | contract: paid through the development metre rate |
| Survey the stopes and benches | break | person | Surveyor | owner | Mine engineer | 107 | 107 | a work order |
| Sample and call ore from waste | break | person | Geologist | owner | Mine engineer | 713 | 713 | a work order |
| Break oversize and run the crusher | hoist | person | Crusher operator | owner | Shift boss | 42,526 | 42,526 | a work order |
| Wind the skips | hoist | person | Hoist operator | owner | Mechanic | 427 | 427 | a work order |
| Ride and tend the cage | hoist | person | Hoist operator | owner | Shift boss | 42,526 | 42,526 | a work order |
| Run the mill | mill | person | Mill operator | owner | Mine engineer | 95,030 | 95,030 | a work order |
| Assay mill and grade-control samples | mill | person | Lab technician | owner | Mine engineer | 677 | 677 | a work order |
| Balance the metal and tune recovery | mill | person | Mine engineer | owner | Mine manager | 677 | 677 | a work order |
| Run the paste plant | mill | person | Paste and fill operator | owner | Mine engineer | 636 | 636 | a work order |
| Build barricades and watch the pour | break | person | Paste and fill operator | owner | Mine engineer | 509 | 509 | a work order |
| Keep roads, pumps and pipes | break | person | Service crew | owner | Shift boss | 79,253 | 79,253 | a work order |
| Carry explosives, bolts and parts to the work | break | person | Service crew | owner | Shift boss | 39,626 | 39,626 | a work order |
| Survey the air and set vent controls | break | person | Ventilation technician | owner | Mine engineer | 39,626 | 39,626 | a work order |
| Watch the tailings dam and water | site | person | Environment technician | owner | Mine engineer | 42,526 | 42,526 | a work order |
| Keep the hoist, mill and fans | site | person | Mechanic | owner | Mine engineer | 79,253 | 79,253 | a work order |
| Keep the power and controls | site | person | Electrician | owner | Mine engineer | 39,626 | 39,626 | a work order |
| Examine each working place | break | person | Shift boss | owner | Mine manager | 2,214 | 2,214 | A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory). |
| Design, schedule and check ground control | site | person | Mine engineer | owner | Mine manager | 29,823 | 29,823 | a work order |
| Train and keep the mine rescue teams | site | person | Safety and training officer | owner | Mine manager | 2,209 | 2,209 | Two rescue teams of five are drawn from the crews and kept trained (30 CFR 49, cited from memory). |
| Answer for the mine under its permit | site | person | Mine manager | owner | the inspector | 9,941 | 9,941 | A named person answers for the mine under its permit. |
| Service and repair the machines | break | person | Mechanic | owner | Mine engineer | 25,014 | 25,014 | a work order |
| Keep machine electrics and cables | break | person | Electrician | owner | Mine engineer | 5,360 | 5,360 | a work order |
| Lead the shift | site | person | Shift boss | owner | Mine manager | 30,653 | 30,653 | a work order |
| Safety, stores, people and accounts | site | person | Office: safety, stores, people, accounts | owner | Mine manager | 100,550 | 100,550 | a work order |
What it takes
- Depth
- 326 m
- Air
- 145.2 m³/s, fan 244.9 kW
- Water in
- 23.4 L/s, pump 107 kW
- Rock at the bottom
- 23.2 °C
- Diesel
- 1,332,320 L
- Power
- 15,807,488 kWh
- Explosive
- 682,530 kg
- Cement
- 3,784,234 kg
- Steel
- 535,983 kg
- Reagents
- 1,693 kg
- Water
- 93,098 m³
Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.
- The walk closes to
- 0.0000000023 t
| Came in | Tonnes | SN t | W t |
|---|---|---|---|
| mineralised rock in place | 593,684 | 4,749 | 297 |
| barren rock broken | 70,353 | 0 | 0 |
| development rock | 640,916 | 0 | 0 |
| Went to | Tonnes | SN t | W t |
|---|---|---|---|
| left in the ground | 485,859 | 3,826 | 249 |
| left in stopes | 8,909 | 46 | 2 |
| waste dump | 639,899 | 0 | 0 |
| rock fill | 1,016 | 0 | 0 |
| paste fill | 90,822 | 157 | 23 |
| tailings dam | 77,447 | 124 | 18 |
| tin concentrate | 994 | 596 | 0 |
| scheelite concentrate | 7 | 0 | 4 |
What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.
- Tonnes against plan
- 1
| Metal | True over plannedMetal in the ground the walk mined, over the metal the plan expected there. | Reached the millMetal that arrived at the mill, over the metal the plan expected to send. |
|---|---|---|
| SN | 0.679 | 0.645 |
| W | 0.685 | 0.651 |
How it is made
Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.
- Stand in this mine
- mine open sn_vein 7
- Read it
- mine status
Every raw material
38 materials from 37 kinds of deposit.
| Material | Group | Found inThe kinds of deposit that carry the material. Each opens that mine on this page. | Used for | Make leafWhere a make graph already asks for the material, the leaf it names. |
|---|---|---|---|---|
| Copper | base | Porphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfide | wire, motors, circuit boards | copper-ore |
| Zinc | base | Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic vein | galvanising, brass, die castings | |
| Lead | base | Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic vein | batteries, solder, shielding | |
| Nickel | base | Nickel laterite, Komatiitic nickel sulfide, Layered intrusion reef | stainless steel, battery cathodes | |
| Tin | base | Tin vein and greisen, Alluvial gold placer | solder, tinplate | tin-ore |
| Aluminium (bauxite) | base | Laterite bauxite | frames, cable, cans | |
| Iron | ferrous | Banded iron, Sedimentary manganese | steel | iron-ore |
| Manganese | ferrous | Sedimentary manganese | steel, battery cathodes | |
| Chromium | ferrous | Layered intrusion reef, Podiform chromite | stainless steel, plating | |
| Molybdenum | ferrous | Porphyry copper, Porphyry molybdenum | alloy steel, catalysts | |
| Tungsten | ferrous | Tungsten skarn, Tin vein and greisen | carbide tools, drill bits | |
| Vanadium | ferrous | Banded iron, Layered intrusion reef, Sandstone uranium | high-strength steel, flow batteries | |
| Titanium | ferrous | Layered intrusion reef, Kaolin and common clay, Heavy mineral beach sands | white pigment, airframes | |
| Gold | precious | Porphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placer | contacts, reserves, jewellery | |
| Silver | precious | Porphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold | solder, solar paste, contacts | |
| Platinum group | precious | Komatiitic nickel sulfide, Layered intrusion reef | catalysts, electrodes | |
| Lithium | battery | Lithium pegmatite, Lithium brine | battery cathodes, glass | |
| Cobalt | battery | Sediment-hosted copper, Nickel laterite, Komatiitic nickel sulfide | battery cathodes, superalloys | |
| Graphite | battery | Flake graphite | battery anodes, refractories | |
| Rare earths | battery | Carbonatite, Heavy mineral beach sands | magnets, phosphors | |
| Uranium | energy | Sandstone uranium, Marine phosphorite | reactor fuel | |
| Coal | energy | Bituminous coal seam | coke, power, carbon feed | coal |
| Limestone | construction | Limestone quarry | cement, lime, flux | limestone |
| Crushed stone | construction | Crushed stone quarry | concrete, road base | |
| Sand and gravel | construction | Sand and gravel pit | concrete, fill | |
| Gypsum | construction | Bedded salt and gypsum | plaster, cement setting | |
| Common clay | construction | Kaolin and common clay | brick, cement | |
| Silica sand | industrial | Sand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sands | glass, foundry, silicon | silica-sand |
| High-purity quartz | industrial | Quartz and pegmatite silica | silicon, crucibles | quartz |
| Kaolin | industrial | Kaolin and common clay | ceramics, paper | kaolin |
| Salt | industrial | Bedded potash, Bedded salt and gypsum | chlorine, soda ash, de-icing | |
| Potash | industrial | Lithium brine, Bedded potash | fertiliser | |
| Phosphate rock | industrial | Carbonatite, Marine phosphorite | fertiliser, LFP cathodes | |
| Sulfur | industrial | Bedded salt and gypsum | sulfuric acid | |
| Borates | industrial | Lithium brine, Lacustrine borate | glass fibre, detergents | colemanite |
| Fluorspar | industrial | Mississippi Valley zinc-lead, Carbonatite | hydrofluoric acid, flux | |
| Barite | industrial | Mississippi Valley zinc-lead, Carbonatite | drilling mud, fillers | |
| Celestine | industrial | Bedded salt and gypsum | strontium salts, pyrotechnics | celestine |