Skip to content
1 viewer
Mine
arc

Tin vein and greisen

One life of this Tin vein and greisen mine takes 3 steps from 3 raw materials: 0 run here, 3 by partners, 0 are bought. 6 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Does not pay
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
-$155M
Grade
SN 0.8 %, W 0.05 %
Milled
169,270 t
Rate
124 t a day
Life
4.11 years

Run a mine

The ground

Deposit model
15b
In the ground
593,684 t
SN in it
4,749 t
W in it
297 t
Drilled
372 holes, 111,249 m
Drilling
$20M over 412 days

The plan and the run

Method
Cut and fill
Treatment
Gravity tables
Planned
178,179 t over 15 levels
Cut-off
$82/t
Fleet
2 drill rigs, 2 loaders, 6 trucks
Walked
1,933 days
First ore
day 560
Revenue
$14M
Operating cost
$96M
Plant and development
$86M
Carbon dioxide
3,571 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
157 people, 31 of them contractors
Machines with no one in the seat
0
Owner wages
$71M
Paid hours
770,882 worked, 76,162 breaks, 156,669 leave and training, 77,280 travel and blast window, 476,816 with nothing to do
Work orders drafted
30
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner44$68.8
Geologistowner11$63.5
Surveyorowner11$50.2
Safety and training officerowner11$58.2
Shift bossowner28.84$65.5competent person for workplace examinations
Jumbo operatorcontractor14.42$55
Bolterowner14.42$52.4
Boltercontractor14.42$52.4
Blasterowner14.42$55blaster's certificate
Blastercontractor14.42$55blaster's certificate
Long-hole drillerowner14.42$55
Diamond drillercontractor14.42$55
Loader operatorowner14.42$52.4
Loader operatorcontractor14.42$52.4
Truck drivercontractor14.42$47.1
Service crewowner313.3$44.5
Service crewcontractor14.42$44.5
Crusher operatorowner14.42$47.1
Hoist operatorowner28.84$52.4hoist operator's certificate where the state issues one
Mill operatorowner417.7$49.8
Lab technicianowner14.42$41.9
Paste and fill operatorowner14.42$47.1
Ventilation technicianowner14.42$49.8
Environment technicianowner14.42$47.1
Mechanicowner417.7$57.6
Electricianowner28.84$60.2electrician's licence
Office: safety, stores, people, accountsowner1212$39.7
28 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Mark up the face and linebreakpersonSurveyorownerMine engineer2,3412,341a work order
Map the face geologybreakpersonGeologistownerMine engineer1,1711,171a work order
Drill the development roundbreakpersonJumbo operatorcontractorShift boss6,2446,244contract: paid through the development metre rate
Charge and fire the roundbreakpersonBlastercontractorShift boss7,8057,805A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Muck out the headingbreakpersonLoader operatorcontractorShift boss3,1223,122contract: paid through the development metre rate
Truck development rock outbreakpersonTruck drivercontractorShift boss7,8057,805contract: paid through the development metre rate
Scale, bolt and mesh the backbreakpersonBoltercontractorMine engineer15,60915,609A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement.
Extend air, water, power and vent ductbreakpersonService crewcontractorShift boss11,70711,707contract: paid through the development metre rate
Drill the production ringsbreakpersonLong-hole drillerownerShift boss1,4851,485a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss481481A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss936936a work order
Cable-bolt the stope backs and browsbreakpersonBolterownerMine engineer535535A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement.
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist2,1382,138contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer107107a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer713713a work order
Break oversize and run the crusherhoistpersonCrusher operatorownerShift boss42,52642,526a work order
Wind the skipshoistpersonHoist operatorownerMechanic427427a work order
Ride and tend the cagehoistpersonHoist operatorownerShift boss42,52642,526a work order
Run the millmillpersonMill operatorownerMine engineer95,03095,030a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer677677a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager677677a work order
Run the paste plantmillpersonPaste and fill operatorownerMine engineer636636a work order
Build barricades and watch the pourbreakpersonPaste and fill operatorownerMine engineer509509a work order
Keep roads, pumps and pipesbreakpersonService crewownerShift boss79,25379,253a work order
Carry explosives, bolts and parts to the workbreakpersonService crewownerShift boss39,62639,626a work order
Survey the air and set vent controlsbreakpersonVentilation technicianownerMine engineer39,62639,626a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer42,52642,526a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer79,25379,253a work order
Keep the power and controlssitepersonElectricianownerMine engineer39,62639,626a work order
Examine each working placebreakpersonShift bossownerMine manager2,2142,214A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager29,82329,823a work order
Train and keep the mine rescue teamssitepersonSafety and training officerownerMine manager2,2092,209Two rescue teams of five are drawn from the crews and kept trained (30 CFR 49, cited from memory).
Answer for the mine under its permitsitepersonMine managerownerthe inspector9,9419,941A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer25,01425,014a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer5,3605,360a work order
Lead the shiftsitepersonShift bossownerMine manager30,65330,653a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager100,550100,550a work order
37 rows

What it takes

Depth
326 m
Air
145.2 m³/s, fan 244.9 kW
Water in
23.4 L/s, pump 107 kW
Rock at the bottom
23.2 °C
Diesel
1,332,320 L
Power
15,807,488 kWh
Explosive
682,530 kg
Cement
3,784,234 kg
Steel
535,983 kg
Reagents
1,693 kg
Water
93,098 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.0000000023 t
Came inTonnesSN tW t
mineralised rock in place593,6844,749297
barren rock broken70,35300
development rock640,91600
3 rows
Went toTonnesSN tW t
left in the ground485,8593,826249
left in stopes8,909462
waste dump639,89900
rock fill1,01600
paste fill90,82215723
tailings dam77,44712418
tin concentrate9945960
scheelite concentrate704
8 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
SN0.6790.645
W0.6850.651
2 rows

How it is made

Tin vein and greisen ore (raw): 169000000 kg per Concentrates from one Tin vein and greisen mine life; mined: Tin vein and greisen by Cut and fill.Tin vein and greisen …Waste rock in place (raw): 641000000 kg per Concentrates from one Tin vein and greisen mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 683000 kg per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 1330000 L per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..DieselCement (opaque): 3780000 kg per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..CementGround support steel (opaque): 468000 kg per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..Ground support steelBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Tin vein and greisen mine life; described. Energy: at least 26899999.999999996 kWh; 4 opaque inputs carry no energy.Broken rockRock at surface (material): Hoist to surface, made by a partner (mining). 1 run per Concentrates from one Tin vein and greisen mine life; described. Energy: at least 27099999.999999996 kWh; 4 opaque inputs carry no energy.Rock at surfaceGrinding steel (opaque): 67700 kg per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..Grinding steelReagents (opaque): 1690 kg per Concentrates from one Tin vein and greisen mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 93099999.99999999 kg per Concentrates from one Tin vein and greisen mine life; drawn: make-up water.Process waterConcentrates from one Tin vein and greisen mine life (product): Gravity tables, made by a partner (mineral_processing). 1 run per Concentrates from one Tin vein and greisen mine life; described. Energy: at least 29199999.999999996 kWh; 6 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open sn_vein 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows