Skip to content
1 viewer
Mine
arc

Porphyry copper

One life of this Porphyry copper mine takes 2 steps from 3 raw materials: 0 run here, 2 by partners, 0 are bought. 4 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Does not pay
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
-$263M
Grade
CU 0.54 %, MO 0.015 %, AU 0.1 g/t, AG 1.6 g/t
Milled
92,783,749 t
Rate
13,817 t a day
Life
19.8 years

Run a mine

The ground

Deposit model
17
In the ground
140,462,601 t
CU in it
758,498 t
MO in it
21,069 t
AU in it
14 t
AG in it
225 t
Drilled
528 holes, 268,350 m
Drilling
$48M over 994 days

The plan and the run

Method
Open pit
Treatment
Crush, grind and float
Planned
95,653,349 t over 4 levels
Cut-off
$22.2/t
Fleet
7 drill rigs, 2 loaders, 7 trucks
Walked
10,114 days
First ore
day 722
Revenue
$4,651M
Operating cost
$2,334M
Plant and development
$762M
Rate of return
5.85 %
Carbon dioxide
215,081 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
485 people, 128 of them contractors
Machines with no one in the seat
0
Owner wages
$909M
Paid hours
16,978,501 worked, 852,270 breaks, 2,302,210 leave and training, 284,090 travel and blast window, 1,093,796 with nothing to do
Work orders drafted
20
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner3737$68.8
Geologistowner4242$63.5
Surveyorowner77$50.2
Shift bossowner522.1$65.5competent person for workplace examinations
Blasterowner14.42$55blaster's certificate
Long-hole drillerowner730.9$55
Diamond drillercontractor29128$55
Loader operatorowner28.84$52.4
Truck driverowner522.1$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner1357.5$49.8
Lab technicianowner313.3$41.9
Environment technicianowner14.42$47.1
Mechanicowner1148.6$57.6
Electricianowner313.3$60.2electrician's licence
Office: safety, stores, people, accountsowner6060$39.7
17 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Drill the production ringsbreakpersonLong-hole drillerownerShift boss803,330803,330a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss128,533128,533A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss176,924176,924a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss729,584729,584a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist3,855,9843,855,984contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer192,799192,799a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer1,285,3281,285,328a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss222,508222,508a work order
Run the millmillpersonMill operatorownerMine engineer2,222,1232,222,123a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer371,135371,135a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager371,135371,135a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer222,508222,508a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer445,016445,016a work order
Keep the power and controlssitepersonElectricianownerMine engineer222,508222,508a work order
Examine each working placebreakpersonShift bossownerMine manager5,0445,044A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager1,352,3861,352,386a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector52,01552,015A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer1,196,8861,196,886a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer256,476256,476a work order
Lead the shiftsitepersonShift bossownerMine manager651,690651,690a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager2,214,5872,214,587a work order
21 rows

What it takes

Diesel
80,254,247 L
Power
2,133,460,452 kWh
Water
44,907,334 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.000026 t
Came inTonnesCU tMO tAU tAG t
mineralised rock in place140,462,601758,49821,06914225
barren rock broken220,022,3260000
development rock00000
3 rows
Went toTonnesCU tMO tAU tAG t
left in the ground39,152,899139,1373,764235
left in stopes2,869,60018,15950406
waste dump225,678,67914,06049305
rock fill00000
paste fill00000
tailings dam90,803,41759,3762,9735159
copper concentrate1,954,687527,765060
molybdenite concentrate25,645013,33500
lead concentrate000020
9 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
CU0.9950.965
MO0.9990.969
AU10.97
AG0.9870.957
4 rows

Behind one printable armFrom the arm's own make graph, at the 0.6 % copper ore its library chain assumes.

Copper in one arm
33.5 g
Rock this mine moves for it
5.9 kg
Arms in this mine's copper
15,735,403,276
The arm's parts

How it is made

Porphyry copper ore (raw): 92800000000 kg per Concentrates from one Porphyry copper mine life; mined: Porphyry copper by Open pit.Porphyry copper oreWaste rock in place (raw): 226000000000 kg per Concentrates from one Porphyry copper mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 80300000 kg per Concentrates from one Porphyry copper mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 80300000 L per Concentrates from one Porphyry copper mine life; Bought in; its own chain is not followed here..DieselBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Porphyry copper mine life; described. Energy: at least 803000000 kWh; 2 opaque inputs carry no energy.Broken rockGrinding steel (opaque): 69600000 kg per Concentrates from one Porphyry copper mine life; Bought in; its own chain is not followed here..Grinding steelReagents (opaque): 122000000 kg per Concentrates from one Porphyry copper mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 44900000000 kg per Concentrates from one Porphyry copper mine life; drawn: make-up water.Process waterConcentrates from one Porphyry copper mine life (product): Crush, grind and float, made by a partner (mineral_processing). 1 run per Concentrates from one Porphyry copper mine life; described. Energy: at least 2940000000 kWh; 4 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open porphyry_cu 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows