One life of this Banded iron mine takes 2 steps from 3 raw materials: 0 run here, 2 by partners, 0 are bought. 2 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Pays
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
$1,300M
Grade
FE 56 %, V 0.05 %
Milled
158,424,598 t
Rate
20,639 t a day
Life
22.6 years

Run a mine

The ground

Deposit model
34a
In the ground
166,684,458 t
FE in it
93,343,296 t
V in it
83,342 t
Drilled
293 holes, 90,262 m
Drilling
$16M over 334 days

The plan and the run

Method
Open pit
Treatment
Crush, screen and ship
Planned
163,324,328 t over 4 levels
Cut-off
$12.2/t
Fleet
18 drill rigs, 4 loaders, 18 trucks
Walked
11,432 days
First ore
day 1,940
Revenue
$15,314M
Operating cost
$5,798M
Plant and development
$145M
Rate of return
13 %
Carbon dioxide
681,551 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
1,099 people, 332 of them contractors
Machines with no one in the seat
0
Owner wages
$2,080M
Paid hours
43,827,320 worked, 2,152,071 breaks, 5,729,891 leave and training, 717,357 travel and blast window, 1,270,783 with nothing to do
Work orders drafted
20
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner5454$68.8
Geologistowner106106$63.5
Surveyorowner1616$50.2
Shift bossowner1253.1$65.5competent person for workplace examinations
Blasterowner313.3$55blaster's certificate
Long-hole drillerowner1670.7$55
Diamond drillercontractor75332$55
Loader operatorowner417.7$52.4
Truck driverowner1461.9$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner1879.6$49.8
Lab technicianowner417.7$41.9
Environment technicianowner14.42$47.1
Mechanicowner25111$57.6
Electricianowner626.5$60.2electrician's licence
Office: safety, stores, people, accountsowner137137$39.7
17 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Drill the production ringsbreakpersonLong-hole drillerownerShift boss2,628,1612,628,161a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss420,506420,506A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss581,314581,314a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss2,311,9082,311,908a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist12,615,17312,615,173contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer630,759630,759a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer4,205,0584,205,058a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss251,504251,504a work order
Run the millmillpersonMill operatorownerMine engineer3,259,0293,259,029a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer633,698633,698a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager633,698633,698a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer251,504251,504a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer503,008503,008a work order
Keep the power and controlssitepersonElectricianownerMine engineer251,504251,504a work order
Examine each working placebreakpersonShift bossownerMine manager5,7035,703A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager2,175,3462,175,346a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector58,79358,793A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer3,864,9683,864,968a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer828,207828,207a work order
Lead the shiftsitepersonShift bossownerMine manager2,000,8712,000,871a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager5,716,6075,716,607a work order
21 rows

What it takes

Diesel
254,309,922 L
Power
227,248,520 kWh
Water
1,742,671 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.00012 t
Came inTonnesFE tV t
mineralised rock in place166,684,45893,343,29683,342
barren rock broken904,244,98600
development rock000
3 rows
Went toTonnesFE tV t
left in the ground19,665,0209,743,0329,194
left in stopes4,899,7302,328,6802,056
waste dump887,940,0955,977,5815,609
rock fill000
paste fill000
tailings dam2,376,3691,129,410997
sized product156,048,22974,164,59265,485
7 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
FE0.8480.823
V0.8440.818
2 rows

How it is made

Banded iron ore (raw): 158000000000 kg per Concentrates from one Banded iron mine life; mined: Banded iron by Open pit.Banded iron oreWaste rock in place (raw): 888000000000 kg per Concentrates from one Banded iron mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 263000000 kg per Concentrates from one Banded iron mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 254000000 L per Concentrates from one Banded iron mine life; Bought in; its own chain is not followed here..DieselBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Banded iron mine life; described. Energy: at least 2540000000 kWh; 2 opaque inputs carry no energy.Broken rockProcess water (raw): 1740000000 kg per Concentrates from one Banded iron mine life; drawn: make-up water.Process waterConcentrates from one Banded iron mine life (product): Crush, screen and ship, made by a partner (mineral_processing). 1 run per Concentrates from one Banded iron mine life; described. Energy: at least 2770000000 kWh; 2 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open superior_fe 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows