Skip to content
1 viewer
Mine
tropical

Nickel laterite

One life of this Nickel laterite mine takes 2 steps from 3 raw materials: 0 run here, 2 by partners, 0 are bought. 4 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Pays
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
$211M
Grade
NI 1.4 %, CO 0.08 %
Milled
52,302,846 t
Rate
8,989 t a day
Life
17.1 years

Run a mine

The ground

Deposit model
38a
In the ground
44,000,000 t
NI in it
616,000 t
CO in it
35,200 t
Drilled
516 holes, 23,981 m
Drilling
$4M over 89 days

The plan and the run

Method
Open pit
Treatment
Acid leach
Planned
53,920,460 t over 2 levels
Cut-off
$43.2/t
Fleet
2 drill rigs, 1 loaders, 2 trucks
Walked
5,871 days
First ore
day 0
Revenue
$7,296M
Operating cost
$2,867M
Plant and development
$2,356M
Rate of return
9.58 %
Carbon dioxide
37,212 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
218 people, 31 of them contractors
Machines with no one in the seat
0
Owner wages
$335M
Paid hours
5,227,313 worked, 287,532 breaks, 761,448 leave and training, 95,844 travel and blast window, 771,715 with nothing to do
Work orders drafted
20
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner2525$68.8
Geologistowner1010$63.5
Surveyorowner22$50.2
Shift bossowner28.84$65.5competent person for workplace examinations
Blasterowner14.42$55blaster's certificate
Long-hole drillerowner28.84$55
Diamond drillercontractor730.9$55
Loader operatorowner14.42$52.4
Truck driverowner14.42$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner1044.2$49.8
Lab technicianowner28.84$41.9
Environment technicianowner14.42$47.1
Mechanicowner522.1$57.6
Electricianowner28.84$60.2electrician's licence
Office: safety, stores, people, accountsowner2525$39.7
17 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Drill the production ringsbreakpersonLong-hole drillerownerShift boss151,493151,493a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss24,23924,239A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss32,76632,766a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss126,228126,228a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist727,168727,168contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer36,35836,358a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer242,389242,389a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss129,162129,162a work order
Run the millmillpersonMill operatorownerMine engineer1,187,2581,187,258a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer209,211209,211a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager209,211209,211a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer129,162129,162a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer258,324258,324a work order
Keep the power and controlssitepersonElectricianownerMine engineer129,162129,162a work order
Examine each working placebreakpersonShift bossownerMine manager2,9352,935A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager513,293513,293a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector30,19430,194A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer217,342217,342a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer46,57346,573a work order
Lead the shiftsitepersonShift bossownerMine manager143,019143,019a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager681,823681,823a work order
21 rows

What it takes

Diesel
13,885,117 L
Power
1,455,024,007 kWh
Water
28,766,565 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.0000077 t
Came inTonnesNI tCO t
mineralised rock in place44,000,000616,00035,200
barren rock broken18,247,39200
development rock000
3 rows
Went toTonnesNI tCO t
left in the ground1,650,08325,5241,268
left in stopes1,617,61417,5441,008
waste dump6,676,8495,670335
rock fill000
paste fill000
tailings dam50,929,47545,3813,259
mixed hydroxide1,373,371521,88129,330
7 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
NI0.7760.752
CO0.7660.743
2 rows

How it is made

Nickel laterite ore (raw): 52300000000 kg per Concentrates from one Nickel laterite mine life; mined: Nickel laterite by Open pit.Nickel laterite oreWaste rock in place (raw): 6680000000 kg per Concentrates from one Nickel laterite mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 15099999.999999998 kg per Concentrates from one Nickel laterite mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 13899999.999999998 L per Concentrates from one Nickel laterite mine life; Bought in; its own chain is not followed here..DieselBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Nickel laterite mine life; described. Energy: at least 139000000 kWh; 2 opaque inputs carry no energy.Broken rockGrinding steel (opaque): 20900000 kg per Concentrates from one Nickel laterite mine life; Bought in; its own chain is not followed here..Grinding steelReagents (opaque): 17800000000 kg per Concentrates from one Nickel laterite mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 28800000000 kg per Concentrates from one Nickel laterite mine life; drawn: make-up water.Process waterConcentrates from one Nickel laterite mine life (product): Acid leach, made by a partner (mineral_processing). 1 run per Concentrates from one Nickel laterite mine life; described. Energy: at least 1590000000 kWh; 4 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open laterite_ni 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows