Skip to content
1 viewer
Mine
tropical

Kaolin and common clay

One life of this Kaolin and common clay mine takes 2 steps from 3 raw materials: 0 run here, 2 by partners, 0 are bought. 3 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Pays
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
$434M
Grade
KAOLIN 40 %, CLAY 50 %, TI 0.8 %
Milled
32,109,890 t
Rate
6,235 t a day
Life
15.2 years

Run a mine

The ground

Deposit model
No USGS descriptive model
In the ground
30,000,000 t
KAOLIN in it
12,000,000 t
CLAY in it
15,000,000 t
TI in it
240,000 t
Drilled
516 holes, 23,944 m
Drilling
$4M over 89 days

The plan and the run

Method
Open pit
Treatment
Wash plant
Planned
33,102,979 t over 4 levels
Cut-off
$13.2/t
Fleet
1 drill rigs, 1 loaders, 1 trucks
Walked
5,435 days
First ore
day 1
Revenue
$1,249M
Operating cost
$387M
Plant and development
$118M
Rate of return
114 %
Carbon dioxide
24,453 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
168 people, 22 of them contractors
Machines with no one in the seat
0
Owner wages
$252M
Paid hours
3,764,325 worked, 224,812 breaks, 568,100 leave and training, 74,938 travel and blast window, 750,934 with nothing to do
Work orders drafted
20
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner1818$68.8
Geologistowner66$63.5
Surveyorowner11$50.2
Shift bossowner14.42$65.5competent person for workplace examinations
Blasterowner14.42$55blaster's certificate
Long-hole drillerowner14.42$55
Diamond drillercontractor522.1$55
Loader operatorowner14.42$52.4
Truck driverowner14.42$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner835.4$49.8
Lab technicianowner28.84$41.9
Environment technicianowner14.42$47.1
Mechanicowner417.7$57.6
Electricianowner28.84$60.2electrician's licence
Office: safety, stores, people, accountsowner1818$39.7
17 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Drill the production ringsbreakpersonLong-hole drillerownerShift boss99,01099,010a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss15,84215,842A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss21,45021,450a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss82,94982,949a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist475,246475,246contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer23,76223,762a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer158,415158,415a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss119,570119,570a work order
Run the millmillpersonMill operatorownerMine engineer872,587872,587a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer128,440128,440a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager128,440128,440a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer119,570119,570a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer239,140239,140a work order
Keep the power and controlssitepersonElectricianownerMine engineer119,570119,570a work order
Examine each working placebreakpersonShift bossownerMine manager2,7162,716A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager363,369363,369a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector27,95127,951A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer142,386142,386a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer30,51130,511a work order
Lead the shiftsitepersonShift bossownerMine manager102,402102,402a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager490,999490,999a work order
21 rows

What it takes

Diesel
9,124,423 L
Power
98,940,095 kWh
Water
21,192,527 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.0000027 t
Came inTonnesKAOLIN tCLAY tTI t
mineralised rock in place30,000,00012,000,00015,000,000240,000
barren rock broken11,515,953000
development rock0000
3 rows
Went toTonnesKAOLIN tCLAY tTI t
left in the ground1,912,143804,813899,95313,483
left in stopes993,089325,571410,7486,624
waste dump6,500,832342,826408,4385,719
rock fill0000
paste fill0000
tailings dam6,661,0883,158,0371,328,207214,174
filler kaolin8,373,5827,368,75300
brick clay17,075,220011,952,6540
8 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
KAOLIN0.8290.804
CLAY0.8260.801
TI0.8270.803
3 rows

How it is made

Kaolin and common clay ore (raw): 32100000000 kg per Concentrates from one Kaolin and common clay mine life; mined: Kaolin and common clay by Open pit.Kaolin and common cla…Waste rock in place (raw): 6500000000 kg per Concentrates from one Kaolin and common clay mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 9900000 kg per Concentrates from one Kaolin and common clay mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 9120000 L per Concentrates from one Kaolin and common clay mine life; Bought in; its own chain is not followed here..DieselBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Kaolin and common clay mine life; described. Energy: at least 91099999.99999999 kWh; 2 opaque inputs carry no energy.Broken rockReagents (opaque): 26699999.999999996 kg per Concentrates from one Kaolin and common clay mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 21200000000 kg per Concentrates from one Kaolin and common clay mine life; drawn: make-up water.Process waterConcentrates from one Kaolin and common clay mine life (product): Wash plant, made by a partner (mineral_processing). 1 run per Concentrates from one Kaolin and common clay mine life; described. Energy: at least 190000000 kWh; 3 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open kaolin_clay 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows