1 viewer
basin
Sediment-hosted copper
One life of this Sediment-hosted copper mine takes 3 steps from 3 raw materials: 0 run here, 3 by partners, 0 are bought. 5 inputs are still opaque.
- On these prices
- Does not pay
- Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
- -$148M
- Grade
- CU 2.1 %, CO 0.1 %, AG 23 g/t
- Milled
- 7,130,779 t
- Rate
- 2,017 t a day
- Life
- 10.4 years
Run a mine
The ground
- Deposit model
- 30b
- In the ground
- 22,067,623 t
- CU in it
- 463,420 t
- CO in it
- 22,068 t
- AG in it
- 508 t
- Drilled
- 538 holes, 180,393 m
- Drilling
- $32M over 668 days
The plan and the run
- Method
- Room and pillar
- Treatment
- Crush, grind and float
- Planned
- 7,351,318 t over 1 levels
- Cut-off
- $43/t
- Fleet
- 2 drill rigs, 3 loaders, 8 trucks
- Walked
- 4,518 days
- First ore
- day 758
- Revenue
- $1,003M
- Operating cost
- $529M
- Plant and development
- $445M
- Rate of return
- 0.491 %
- Carbon dioxide
- 37,514 t
Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.
- On the books at peak
- 234 people, 44 of them contractors
- Machines with no one in the seat
- 0
- Owner wages
- $212M
- Paid hours
- 2,935,637 worked, 214,956 breaks, 470,234 leave and training, 226,713 travel and blast window, 757,582 with nothing to do
- Work orders drafted
- 28
| Role | Answers | Posts a shift | People | An hourThe assumed loaded wage for the role, in US dollars. | Licence |
|---|---|---|---|---|---|
| Mine manager | owner | 1 | 1 | $116 | mine manager's certificate where the state issues one |
| Mine engineer | owner | 8 | 8 | $68.8 | |
| Geologist | owner | 3 | 3 | $63.5 | |
| Surveyor | owner | 2 | 2 | $50.2 | |
| Safety and training officer | owner | 1 | 1 | $58.2 | |
| Shift boss | owner | 3 | 13.3 | $65.5 | competent person for workplace examinations |
| Jumbo operator | contractor | 1 | 4.42 | $55 | |
| Bolter | owner | 1 | 4.42 | $52.4 | |
| Bolter | contractor | 2 | 8.84 | $52.4 | |
| Blaster | owner | 1 | 4.42 | $55 | blaster's certificate |
| Blaster | contractor | 1 | 4.42 | $55 | blaster's certificate |
| Long-hole driller | owner | 2 | 8.84 | $55 | |
| Diamond driller | contractor | 2 | 8.84 | $55 | |
| Loader operator | owner | 3 | 13.3 | $52.4 | |
| Loader operator | contractor | 1 | 4.42 | $52.4 | |
| Truck driver | contractor | 1 | 4.42 | $47.1 | |
| Service crew | owner | 3 | 13.3 | $44.5 | |
| Service crew | contractor | 2 | 8.84 | $44.5 | |
| Crusher operator | owner | 1 | 4.42 | $47.1 | |
| Hoist operator | owner | 2 | 8.84 | $52.4 | hoist operator's certificate where the state issues one |
| Mill operator | owner | 5 | 22.1 | $49.8 | |
| Lab technician | owner | 1 | 4.42 | $41.9 | |
| Ventilation technician | owner | 1 | 4.42 | $49.8 | |
| Environment technician | owner | 1 | 4.42 | $47.1 | |
| Mechanic | owner | 8 | 35.4 | $57.6 | |
| Electrician | owner | 3 | 13.3 | $60.2 | electrician's licence |
| Office: safety, stores, people, accounts | owner | 24 | 24 | $39.7 |
| Task | Step | Done byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control. | Role | Answers | Checked by | HoursThe task's hours: a machine's when a machine did it. | At the workHours a person spent at the work itself. | WhyWhy a person does the task at every level, or how it is paid when it is not a work order. |
|---|---|---|---|---|---|---|---|---|
| Mark up the face and line | break | person | Surveyor | owner | Mine engineer | 9,420 | 9,420 | a work order |
| Map the face geology | break | person | Geologist | owner | Mine engineer | 4,710 | 4,710 | a work order |
| Drill the development round | break | person | Jumbo operator | contractor | Shift boss | 25,120 | 25,120 | contract: paid through the development metre rate |
| Charge and fire the round | break | person | Blaster | contractor | Shift boss | 31,400 | 31,400 | A certified blaster charges and fires at every level; charging machines exist, firing stays with a person. |
| Muck out the heading | break | person | Loader operator | contractor | Shift boss | 12,560 | 12,560 | contract: paid through the development metre rate |
| Truck development rock out | break | person | Truck driver | contractor | Shift boss | 31,400 | 31,400 | contract: paid through the development metre rate |
| Scale, bolt and mesh the back | break | person | Bolter | contractor | Mine engineer | 62,801 | 62,801 | A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement. |
| Extend air, water, power and vent duct | break | person | Service crew | contractor | Shift boss | 47,100 | 47,100 | contract: paid through the development metre rate |
| Drill the production rings | break | person | Long-hole driller | owner | Shift boss | 61,261 | 61,261 | a work order |
| Charge and fire the stope or bench | break | person | Blaster | owner | Shift boss | 19,849 | 19,849 | A certified blaster charges and fires at every level; charging machines exist, firing stays with a person. |
| Load the broken rock | break | person | Loader operator | owner | Shift boss | 127,971 | 127,971 | a work order |
| Cable-bolt the stope backs and brows | break | person | Bolter | owner | Mine engineer | 22,054 | 22,054 | A person reads loose ground before anyone works under it; bolting rigs automate the cycle, not that judgement. |
| Diamond-drill the next stopes | break | person | Diamond driller | contractor | Geologist | 88,216 | 88,216 | contract: paid through the development metre rate |
| Survey the stopes and benches | break | person | Surveyor | owner | Mine engineer | 4,411 | 4,411 | a work order |
| Sample and call ore from waste | break | person | Geologist | owner | Mine engineer | 29,405 | 29,405 | a work order |
| Break oversize and run the crusher | hoist | person | Crusher operator | owner | Shift boss | 99,396 | 99,396 | a work order |
| Wind the skips | hoist | person | Hoist operator | owner | Mechanic | 18,147 | 18,147 | a work order |
| Ride and tend the cage | hoist | person | Hoist operator | owner | Shift boss | 99,396 | 99,396 | a work order |
| Run the mill | mill | person | Mill operator | owner | Mine engineer | 362,025 | 362,025 | a work order |
| Assay mill and grade-control samples | mill | person | Lab technician | owner | Mine engineer | 28,523 | 28,523 | a work order |
| Balance the metal and tune recovery | mill | person | Mine engineer | owner | Mine manager | 28,523 | 28,523 | a work order |
| Keep roads, pumps and pipes | break | person | Service crew | owner | Shift boss | 185,238 | 185,238 | a work order |
| Carry explosives, bolts and parts to the work | break | person | Service crew | owner | Shift boss | 92,619 | 92,619 | a work order |
| Survey the air and set vent controls | break | person | Ventilation technician | owner | Mine engineer | 92,619 | 92,619 | a work order |
| Watch the tailings dam and water | site | person | Environment technician | owner | Mine engineer | 99,396 | 99,396 | a work order |
| Keep the hoist, mill and fans | site | person | Mechanic | owner | Mine engineer | 185,238 | 185,238 | a work order |
| Keep the power and controls | site | person | Electrician | owner | Mine engineer | 92,619 | 92,619 | a work order |
| Examine each working place | break | person | Shift boss | owner | Mine manager | 8,610 | 8,610 | A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory). |
| Design, schedule and check ground control | site | person | Mine engineer | owner | Mine manager | 139,413 | 139,413 | a work order |
| Train and keep the mine rescue teams | site | person | Safety and training officer | owner | Mine manager | 5,163 | 5,163 | Two rescue teams of five are drawn from the crews and kept trained (30 CFR 49, cited from memory). |
| Answer for the mine under its permit | site | person | Mine manager | owner | the inspector | 23,235 | 23,235 | A named person answers for the mine under its permit. |
| Service and repair the machines | break | person | Mechanic | owner | Mine engineer | 240,217 | 240,217 | a work order |
| Keep machine electrics and cables | break | person | Electrician | owner | Mine engineer | 51,475 | 51,475 | a work order |
| Lead the shift | site | person | Shift boss | owner | Mine manager | 123,197 | 123,197 | a work order |
| Safety, stores, people and accounts | site | person | Office: safety, stores, people, accounts | owner | Mine manager | 382,909 | 382,909 | a work order |
What it takes
- Depth
- 333 m
- Air
- 196.2 m³/s, fan 604.2 kW
- Water in
- 94.2 L/s, pump 439.1 kW
- Rock at the bottom
- 23.3 °C
- Diesel
- 13,997,856 L
- Power
- 257,450,187 kWh
- Explosive
- 5,708,119 kg
- Cement
- 0 kg
- Steel
- 7,232,102 kg
- Reagents
- 9,341,320 kg
- Water
- 3,451,297 m³
Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.
- The walk closes to
- 0.00000024 t
| Came in | Tonnes | CU t | CO t | AG t |
|---|---|---|---|---|
| mineralised rock in place | 22,067,623 | 463,420 | 22,068 | 508 |
| barren rock broken | 970,308 | 0 | 0 | 0 |
| development rock | 2,195,056 | 0 | 0 | 0 |
| Went to | Tonnes | CU t | CO t | AG t |
|---|---|---|---|---|
| left in the ground | 15,686,613 | 324,817 | 15,664 | 357 |
| left in stopes | 220,540 | 4,158 | 192 | 5 |
| waste dump | 2,195,056 | 0 | 0 | 0 |
| rock fill | 0 | 0 | 0 | 0 |
| paste fill | 0 | 0 | 0 | 0 |
| tailings dam | 6,682,672 | 13,456 | 2,530 | 44 |
| copper concentrate | 448,107 | 120,989 | 0 | 0 |
| nickel concentrate | 0 | 0 | 3,681 | 0 |
| lead concentrate | 0 | 0 | 0 | 102 |
What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.
- Tonnes against plan
- 1
| Metal | True over plannedMetal in the ground the walk mined, over the metal the plan expected there. | Reached the millMetal that arrived at the mill, over the metal the plan expected to send. |
|---|---|---|
| CU | 0.896 | 0.869 |
| CO | 0.89 | 0.863 |
| AG | 0.878 | 0.851 |
Behind one printable armFrom the arm's own make graph, at the 0.6 % copper ore its library chain assumes.
- Copper in one arm
- 33.5 g
- Rock this mine moves for it
- 1.98 kg
- Arms in this mine's copper
- 3,607,300,992
How it is made
Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.
- Stand in this mine
- mine open sediment_cu 7
- Read it
- mine status
Every raw material
38 materials from 37 kinds of deposit.
| Material | Group | Found inThe kinds of deposit that carry the material. Each opens that mine on this page. | Used for | Make leafWhere a make graph already asks for the material, the leaf it names. |
|---|---|---|---|---|
| Copper | base | Porphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfide | wire, motors, circuit boards | copper-ore |
| Zinc | base | Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic vein | galvanising, brass, die castings | |
| Lead | base | Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic vein | batteries, solder, shielding | |
| Nickel | base | Nickel laterite, Komatiitic nickel sulfide, Layered intrusion reef | stainless steel, battery cathodes | |
| Tin | base | Tin vein and greisen, Alluvial gold placer | solder, tinplate | tin-ore |
| Aluminium (bauxite) | base | Laterite bauxite | frames, cable, cans | |
| Iron | ferrous | Banded iron, Sedimentary manganese | steel | iron-ore |
| Manganese | ferrous | Sedimentary manganese | steel, battery cathodes | |
| Chromium | ferrous | Layered intrusion reef, Podiform chromite | stainless steel, plating | |
| Molybdenum | ferrous | Porphyry copper, Porphyry molybdenum | alloy steel, catalysts | |
| Tungsten | ferrous | Tungsten skarn, Tin vein and greisen | carbide tools, drill bits | |
| Vanadium | ferrous | Banded iron, Layered intrusion reef, Sandstone uranium | high-strength steel, flow batteries | |
| Titanium | ferrous | Layered intrusion reef, Kaolin and common clay, Heavy mineral beach sands | white pigment, airframes | |
| Gold | precious | Porphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placer | contacts, reserves, jewellery | |
| Silver | precious | Porphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold | solder, solar paste, contacts | |
| Platinum group | precious | Komatiitic nickel sulfide, Layered intrusion reef | catalysts, electrodes | |
| Lithium | battery | Lithium pegmatite, Lithium brine | battery cathodes, glass | |
| Cobalt | battery | Sediment-hosted copper, Nickel laterite, Komatiitic nickel sulfide | battery cathodes, superalloys | |
| Graphite | battery | Flake graphite | battery anodes, refractories | |
| Rare earths | battery | Carbonatite, Heavy mineral beach sands | magnets, phosphors | |
| Uranium | energy | Sandstone uranium, Marine phosphorite | reactor fuel | |
| Coal | energy | Bituminous coal seam | coke, power, carbon feed | coal |
| Limestone | construction | Limestone quarry | cement, lime, flux | limestone |
| Crushed stone | construction | Crushed stone quarry | concrete, road base | |
| Sand and gravel | construction | Sand and gravel pit | concrete, fill | |
| Gypsum | construction | Bedded salt and gypsum | plaster, cement setting | |
| Common clay | construction | Kaolin and common clay | brick, cement | |
| Silica sand | industrial | Sand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sands | glass, foundry, silicon | silica-sand |
| High-purity quartz | industrial | Quartz and pegmatite silica | silicon, crucibles | quartz |
| Kaolin | industrial | Kaolin and common clay | ceramics, paper | kaolin |
| Salt | industrial | Bedded potash, Bedded salt and gypsum | chlorine, soda ash, de-icing | |
| Potash | industrial | Lithium brine, Bedded potash | fertiliser | |
| Phosphate rock | industrial | Carbonatite, Marine phosphorite | fertiliser, LFP cathodes | |
| Sulfur | industrial | Bedded salt and gypsum | sulfuric acid | |
| Borates | industrial | Lithium brine, Lacustrine borate | glass fibre, detergents | colemanite |
| Fluorspar | industrial | Mississippi Valley zinc-lead, Carbonatite | hydrofluoric acid, flux | |
| Barite | industrial | Mississippi Valley zinc-lead, Carbonatite | drilling mud, fillers | |
| Celestine | industrial | Bedded salt and gypsum | strontium salts, pyrotechnics | celestine |