One life of this Flake graphite mine takes 2 steps from 3 raw materials: 0 run here, 2 by partners, 0 are bought. 5 inputs are still opaque.

Figures are estimates from typical published values: grades, recoveries, costs and prices are not measured at any mine, and the orebody is generated from a seed, not surveyed. The page runs 30,000 blocks, and a finer model moves these figures. Nothing here is sent to any machine or partner. Format cre8.mine.make.v1.
Open VirtualWhere the real mines are
On these prices
Does not pay
Net present valueEvery year's cash on the assumed prices, discounted at 8 % a year.
-$405M
Grade
GRAPHITE 8 %
Milled
17,151,533 t
Rate
3,895 t a day
Life
13 years

Run a mine

The ground

Deposit model
No USGS descriptive model
In the ground
29,337,139 t
GRAPHITE in it
2,346,971 t
Drilled
293 holes, 61,483 m
Drilling
$11M over 228 days

The plan and the run

Method
Open pit
Treatment
Crush, grind and float
Planned
17,681,993 t over 4 levels
Cut-off
$22.2/t
Fleet
4 drill rigs, 1 loaders, 4 trucks
Walked
6,785 days
First ore
day 847
Revenue
$899M
Operating cost
$868M
Plant and development
$357M
Carbon dioxide
81,248 t

Who does the workOwner work a person does is a one-shift work order paid in usd at the assumed wage, in the shape the village paymaster posts. Contract work is paid through the metre rate, and a machine's work is a machine cost. The page posts no order.

On the books at peak
275 people, 75 of them contractors
Machines with no one in the seat
0
Owner wages
$354M
Paid hours
6,327,491 worked, 353,175 breaks, 891,393 leave and training, 117,725 travel and blast window, 758,943 with nothing to do
Work orders drafted
20
The roster
RoleAnswersPosts a shiftPeopleAn hourThe assumed loaded wage for the role, in US dollars.Licence
Mine managerowner11$116mine manager's certificate where the state issues one
Mine engineerowner1313$68.8
Geologistowner2424$63.5
Surveyorowner44$50.2
Shift bossowner313.3$65.5competent person for workplace examinations
Blasterowner14.42$55blaster's certificate
Long-hole drillerowner417.7$55
Diamond drillercontractor1775.2$55
Loader operatorowner14.42$52.4
Truck driverowner313.3$47.1
Crusher operatorowner14.42$47.1
Mill operatorowner626.5$49.8
Lab technicianowner14.42$41.9
Environment technicianowner14.42$47.1
Mechanicowner730.9$57.6
Electricianowner313.3$60.2electrician's licence
Office: safety, stores, people, accountsowner3333$39.7
17 rows
Every task
TaskStepDone byA person is a human or an NPC filling the post. Remote is an operator at a surface console. Robot is a machine on its own, watched from a console, and plant is the plant's own control.RoleAnswersChecked byHoursThe task's hours: a machine's when a machine did it.At the workHours a person spent at the work itself.WhyWhy a person does the task at every level, or how it is paid when it is not a work order.
Drill the production ringsbreakpersonLong-hole drillerownerShift boss319,027319,027a work order
Charge and fire the stope or benchbreakpersonBlasterownerShift boss51,04451,044A certified blaster charges and fires at every level; charging machines exist, firing stays with a person.
Load the broken rockbreakpersonLoader operatorownerShift boss70,60070,600a work order
Haul to the crusher and the dumpbreakpersonTruck driverownerShift boss275,602275,602a work order
Diamond-drill the next stopesbreakpersonDiamond drillercontractorGeologist1,531,3321,531,332contract: paid through the development metre rate
Survey the stopes and benchesbreakpersonSurveyorownerMine engineer76,56776,567a work order
Sample and call ore from wastebreakpersonGeologistownerMine engineer510,444510,444a work order
Break oversize and run the crushermillpersonCrusher operatorownerShift boss149,270149,270a work order
Run the millmillpersonMill operatorownerMine engineer594,192594,192a work order
Assay mill and grade-control samplesmillpersonLab technicianownerMine engineer68,60668,606a work order
Balance the metal and tune recoverymillpersonMine engineerownerMine manager68,60668,606a work order
Watch the tailings dam and watersitepersonEnvironment technicianownerMine engineer149,270149,270a work order
Keep the hoist, mill and fanssitepersonMechanicownerMine engineer298,540298,540a work order
Keep the power and controlssitepersonElectricianownerMine engineer149,270149,270a work order
Examine each working placebreakpersonShift bossownerMine manager3,3863,386A competent person examines each working place every shift before work begins (30 CFR 57.18002, cited from memory).
Design, schedule and check ground controlsitepersonMine engineerownerMine manager314,049314,049a work order
Answer for the mine under its permitsitepersonMine managerownerthe inspector34,89434,894A named person answers for the mine under its permit.
Service and repair the machinesbreakpersonMechanicownerMine engineer465,661465,661a work order
Keep machine electrics and cablesbreakpersonElectricianownerMine engineer99,78599,785a work order
Lead the shiftsitepersonShift bossownerMine manager272,021272,021a work order
Safety, stores, people and accountssitepersonOffice: safety, stores, people, accountsownerMine manager825,325825,325a work order
21 rows

What it takes

Diesel
30,316,251 L
Power
331,922,505 kWh
Water
8,301,342 m³

Every tonneWhat came out of the ground went somewhere named: every tonne of rock and of metal is on one of these lines.

The walk closes to
0.000017 t
Came inTonnesGRAPHITE t
mineralised rock in place29,337,1392,346,971
barren rock broken110,035,9170
development rock00
3 rows
Went toTonnesGRAPHITE t
left in the ground11,762,073834,411
left in stopes530,46042,779
waste dump109,928,98986,600
rock fill00
paste fill00
tailings dam15,901,351208,010
flake concentrate1,250,1831,175,172
7 rows

What the drilling got wrongThe plan stands on the drill holes and the walk mines the true ground, so the two differ.

Tonnes against plan
1
MetalTrue over plannedMetal in the ground the walk mined, over the metal the plan expected there.Reached the millMetal that arrived at the mill, over the metal the plan expected to send.
GRAPHITE0.9510.923
1 row

How it is made

Flake graphite ore (raw): 17200000000 kg per Concentrates from one Flake graphite mine life; mined: Flake graphite by Open pit.Flake graphite oreWaste rock in place (raw): 110000000000 kg per Concentrates from one Flake graphite mine life; mined: rock broken to reach the ore.Waste rock in placeExplosive (opaque): 31899999.999999996 kg per Concentrates from one Flake graphite mine life; Bought in; its own chain is not followed here..ExplosiveDiesel (opaque): 30299999.999999996 L per Concentrates from one Flake graphite mine life; Bought in; its own chain is not followed here..DieselGround support steel (opaque): 0.000000041 kg per Concentrates from one Flake graphite mine life; Bought in; its own chain is not followed here..Ground support steelBroken rock (material): Drill, blast and load, made by a partner (mining). 1 run per Concentrates from one Flake graphite mine life; described. Energy: at least 303000000 kWh; 3 opaque inputs carry no energy.Broken rockGrinding steel (opaque): 12899999.999999998 kg per Concentrates from one Flake graphite mine life; Bought in; its own chain is not followed here..Grinding steelReagents (opaque): 22500000 kg per Concentrates from one Flake graphite mine life; Bought in; its own chain is not followed here..ReagentsProcess water (raw): 8300000000 kg per Concentrates from one Flake graphite mine life; drawn: make-up water.Process waterConcentrates from one Flake graphite mine life (product): Crush, grind and float, made by a partner (mineral_processing). 1 run per Concentrates from one Flake graphite mine life; described. Energy: at least 636000000 kWh; 5 opaque inputs carry no energy.Concentrates from one…
made hereby a partnerboughtrawrecoveredopaque: make not knownstripe: who is meant to make itnot disclosedwhere buying starts

Walk it in VirtualOpen Virtual from the top of this page, then type these in its console.

Stand in this mine
mine open graphite 7
Read it
mine status

Every raw material

38 materials from 37 kinds of deposit.
MaterialGroupFound inThe kinds of deposit that carry the material. Each opens that mine on this page.Used forMake leafWhere a make graph already asks for the material, the leaf it names.
CopperbasePorphyry copper, Volcanogenic massive sulfide, Sediment-hosted copper, Copper skarn, Polymetallic vein, Komatiitic nickel sulfidewire, motors, circuit boardscopper-ore
ZincbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veingalvanising, brass, die castings
LeadbaseVolcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Polymetallic veinbatteries, solder, shielding
NickelbaseNickel laterite, Komatiitic nickel sulfide, Layered intrusion reefstainless steel, battery cathodes
TinbaseTin vein and greisen, Alluvial gold placersolder, tinplatetin-ore
Aluminium (bauxite)baseLaterite bauxiteframes, cable, cans
IronferrousBanded iron, Sedimentary manganesesteeliron-ore
ManganeseferrousSedimentary manganesesteel, battery cathodes
ChromiumferrousLayered intrusion reef, Podiform chromitestainless steel, plating
MolybdenumferrousPorphyry copper, Porphyry molybdenumalloy steel, catalysts
TungstenferrousTungsten skarn, Tin vein and greisencarbide tools, drill bits
VanadiumferrousBanded iron, Layered intrusion reef, Sandstone uraniumhigh-strength steel, flow batteries
TitaniumferrousLayered intrusion reef, Kaolin and common clay, Heavy mineral beach sandswhite pigment, airframes
GoldpreciousPorphyry copper, Volcanogenic massive sulfide, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted gold, Alluvial gold placercontacts, reserves, jewellery
SilverpreciousPorphyry copper, Volcanogenic massive sulfide, Sedimentary exhalative zinc-lead, Mississippi Valley zinc-lead, Sediment-hosted copper, Copper skarn, Polymetallic vein, Orogenic gold vein, Epithermal gold-silver vein, Carbonate-hosted goldsolder, solar paste, contacts
Platinum grouppreciousKomatiitic nickel sulfide, Layered intrusion reefcatalysts, electrodes
LithiumbatteryLithium pegmatite, Lithium brinebattery cathodes, glass
CobaltbatterySediment-hosted copper, Nickel laterite, Komatiitic nickel sulfidebattery cathodes, superalloys
GraphitebatteryFlake graphitebattery anodes, refractories
Rare earthsbatteryCarbonatite, Heavy mineral beach sandsmagnets, phosphors
UraniumenergySandstone uranium, Marine phosphoritereactor fuel
CoalenergyBituminous coal seamcoke, power, carbon feedcoal
LimestoneconstructionLimestone quarrycement, lime, fluxlimestone
Crushed stoneconstructionCrushed stone quarryconcrete, road base
Sand and gravelconstructionSand and gravel pitconcrete, fill
GypsumconstructionBedded salt and gypsumplaster, cement setting
Common clayconstructionKaolin and common claybrick, cement
Silica sandindustrialSand and gravel pit, Quartz and pegmatite silica, Heavy mineral beach sandsglass, foundry, siliconsilica-sand
High-purity quartzindustrialQuartz and pegmatite silicasilicon, cruciblesquartz
KaolinindustrialKaolin and common clayceramics, paperkaolin
SaltindustrialBedded potash, Bedded salt and gypsumchlorine, soda ash, de-icing
PotashindustrialLithium brine, Bedded potashfertiliser
Phosphate rockindustrialCarbonatite, Marine phosphoritefertiliser, LFP cathodes
SulfurindustrialBedded salt and gypsumsulfuric acid
BoratesindustrialLithium brine, Lacustrine borateglass fibre, detergentscolemanite
FluorsparindustrialMississippi Valley zinc-lead, Carbonatitehydrofluoric acid, flux
BariteindustrialMississippi Valley zinc-lead, Carbonatitedrilling mud, fillers
CelestineindustrialBedded salt and gypsumstrontium salts, pyrotechnicscelestine
38 rows